Table 1: Annual Respondent Burden and Cost – NSPS for VOC Emissions from Petroleum Refinery Wastewater Systems (40 CFR Part 60, Subpart QQQ (Renewal) | |||||||||||
Burden item | (A) Person- hours per occurrence |
(B) No. of occurrences per respondent per year |
(C) Person- hours per respondent per year (C=AxB) |
(D) Respondents per year (a) |
(E) Technical person- hours per year (E=CxD) | (F) Management person-hours per year (Ex0.05) | (G) Clerical person-hours per year (Ex0.1) |
(H) Cost (b) |
|||
1. Applications | N/A | 2019 Labor Rates | |||||||||
2. Survey and Studies | N/A | Technical | $120.27 | ||||||||
3. Reporting requirements | Management | $141.06 | |||||||||
A. Familiarize with regulatory requirements c | 2 | 1 | 2 | 149 | 298 | 15 | 30 | $39,690.62 | Clerical | $58.67 | |
B. Required activities | |||||||||||
Inspect drain systems d | 2 | 12 | 24 | 149 | 3,576 | 179 | 358 | $476,287.44 | |||
Inspect oil-water separators e | 8 | 2 | 16 | 149 | 2,384 | 119 | 238 | $317,524.96 | |||
Performance test f | 330 | 1 | 330 | 0 | 0 | 0 | 0 | $0 | |||
C. Create information | See 3B | ||||||||||
D. Gather existing information | See 3E | ||||||||||
E. Write report | |||||||||||
Notification of construction/reconstruction f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of modification f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of actual startup f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Initial certification of equipment and inspections f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Initial inspection report detailing emission problems f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of initial performance test f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Various notifications of intent f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Demonstration for alternative operational or process parameter f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of delay in compliance f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Semiannual report g | 8 | 2 | 16 | 149 | 2,384 | 119 | 238 | $317,524.96 | |||
Results of performance test | See 3B | ||||||||||
Subtotal for Reporting Requirements | 9,938 | $1,151,028 | |||||||||
4. Recordkeeping requirements | |||||||||||
A. Familiarize with regulatory requirements | See 3A | ||||||||||
B. Plan activities | N/A | ||||||||||
C. Implement activities | N/A | ||||||||||
D. Develop record system | N/A | ||||||||||
E. Enter information | 1.5 | 1 | 1.5 | 149 | 224 | 11 | 22 | $29,767.97 | |||
F. Train personnel | N/A | ||||||||||
G. Audits | N/A | ||||||||||
Subtotal for Recordkeeping Requirements | 257 | $29,768 | |||||||||
TOTAL LABOR BURDEN AND COSTS (rounded) h | 10,200 | $1,180,000 | |||||||||
TOTAL CAPITAL AND O&M COSTS (rounded) h | $19,400 | 34.2 | hr/response | ||||||||
GRAND TOTAL (rounded) h | $1,200,000 | ||||||||||
Assumptions: | |||||||||||
a We have assumed that the average number of respondents that will be subject to the rule will be 149. There will be no additional new sources per year that will become subject to the rule over the three-year period of this ICR. | |||||||||||
b This ICR uses the following labor rates: $141.06 per hour for Executive, Administrative, and Managerial labor; $120.27 per hour for Technical labor, and $58.67 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2019, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry. | |||||||||||
c We have assumed that each respondent will read instructions one time per year. | |||||||||||
d We have assumed that each respondent will take two hours to inspect drain systems twelve times per year. | |||||||||||
e We have assumed that it will take eight hours for each respondent to inspect oil-water separators two times per year. | |||||||||||
f This activity applies only to new or modified sources. | |||||||||||
g We have assumed that each respondent will take eight hours to write the semiannual report two times per year. | |||||||||||
h Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Table 2: Average Annual EPA Burden and Cost – NSPS for VOC Emissions from Petroleum Refinery Wastewater Systems (40 CFR Part 60, Subpart QQQ (Renewal) | |||||||||||
Activity | (A) EPA Person- hours per occurrence |
(B) No. of occurrences per plant per year |
(C) EPA person- hours per respondent per year (C=AxB) |
(D) Plants per year (a) |
(E) Technical person- hours per year (E=CxD) |
(F) Management person-hours per year (Ex0.05) |
(G) Clerical person-hours per year (Ex0.1) |
(H) Cost (b) |
|||
1. Report Review | Labor Rates | ||||||||||
Notification of construction/reconstruction | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | Technical | $49.44 | |
Notification of modification | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | Management | $66.62 | |
Notification of actual startup | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | Clerical | $26.75 | |
Initial certification for equipment and inspections | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Initial inspection detailing emission problems | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of various intent c | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Demonstration for alternative operational or process parameter | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of delay in compliance | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of initial performance test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Initial performance test report for flares | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Review of semiannual reports d | 8 | 2 | 16 | 149 | 2,384 | 119 | 238 | $132,183.26 | |||
TOTAL COSTS (rounded)e | 2,740 | $132,000 | |||||||||
Assumptions: | |||||||||||
a We have assumed that the average number of respondents that will be subject to the rule will be 149. There will be no additional new sources that will become subject to the rule over the three-year period of this ICR. | |||||||||||
b This ICR uses the following labor rates: $66.62 for managerial, $49.44 for technical, and $26.75 for clerical labor. These rates are from the Office of Personnel Management (OPM), 2019 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. | |||||||||||
c The following notification review is included: election to construct and operate a completely closed drain system; election to construct and operate a floating roof; intent to use an alternative means of emission limitation; and intent to use a VOC control device other than a carbon absorber to meet the requirements of 60.692-5(a). | |||||||||||
d We have assumed that it will take 8 hours two times per year to review each semiannual report. | |||||||||||
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Number of Respondents | |||||||
Respondents That Submit Reports | Respondents That Do Not Submit Any Reports | ||||||
(A) | (B) | (C) | (D) | (E) | |||
Year | Number of New Respondents 1 | Number of Existing Respondents | Number of Existing Respondents that keep records but do not submit reports | Number of Existing Respondents That Are Also New Respondents | Number of Respondents (E=A+B+C-D) |
||
1 | 0 | 149 | 0 | 0 | 149 | ||
2 | 0 | 149 | 0 | 0 | 149 | ||
3 | 0 | 149 | 0 | 0 | 149 | ||
Average | 0 | 149 | 0 | 0 | 149 | ||
1 New respondent include sources with constructed, reconstructed and modified affected facilities. | |||||||
Total Annual Responses | |||||||
(A) | (B) | (C) | (D) | (E) | |||
Information Collection Activity | Number of Respondents | Number of Responses | Number of Existing Respondents That Keep Records But Do Not Submit Reports | Total Annual Responses E=(BxC)+D |
|||
Notification of construction/ reconstruction |
0 | 1 | N/A | 0 | |||
Notification of modification | 0 | 1 | N/A | 0 | |||
Notification of actual startup | 0 | 1 | N/A | 0 | |||
Initial certification of equipment and inspections | 0 | 1 | N/A | 0 | |||
Initial inspection report detailing emission problems | 0 | 1 | N/A | 0 | |||
Notifications of various intent | 0 | 1 | N/A | 0 | |||
Demonstration for alternative operational or process parameter | 0 | 1 | N/A | 0 | |||
Notification of delay in compliance | 0 | 1 | N/A | 0 | |||
Semiannual report | 149 | 2 | N/A | 298 | |||
Notification of initial performance test | 0 | 1 | N/A | 0 | |||
Total | 298 | 34 | hr/response | ||||
Capital/Startup vs. Operation and Maintenance (O&M) Costs | |||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | |
Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents | Total Capital/Startup Cost, (B X C) | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, (E X F) |
|
Portable VOC analyzer for non-regenerative carbon absorber | $2,960 | 0 | 0 | $130 | 149 | $19,370 |
File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |