Subpart B—Plans and Information
Contents
GENERAL INFORMATION
§250.200 Definitions.
§250.201 What plans and information must I submit before I conduct any activities on my lease or
unit?
§§250.202-250.203 [Reserved]
§250.204 How must I protect the rights of the Federal government?
§250.205 Are there special requirements if my well affects an adjacent property?
POST-APPROVAL REQUIREMENTS FOR THE EP, DPP, AND DOCD
§250.282 Do I have to conduct post-approval monitoring?
DEEPWATER OPERATIONS PLAN (DWOP)
§250.286
§250.287
§250.288
§250.289
§250.290
§250.291
§250.292
§250.293
§250.294
§250.295

What is a DWOP?
For what development projects must I submit a DWOP?
When and how must I submit the Conceptual Plan?
What must the Conceptual Plan contain?
What operations require approval of the Conceptual Plan?
When and how must I submit the DWOP?
What must the DWOP contain?
What operations require approval of the DWOP?
May I combine the Conceptual Plan and the DWOP?
When must I revise my DWOP?

Back to Top

GENERAL INFORMATION
Back to Top
§250.200 Definitions.
Acronyms and terms used in this subpart have the following meanings:
(a) Acronyms used frequently in this subpart are listed alphabetically below:
BOEM means Bureau of Ocean Energy Management of the Department of the Interior.
BSEE means Bureau of Safety and Environmental Enforcement of the Department of the
Interior.

CID means Conservation Information Document.
CZMA means Coastal Zone Management Act.
DOCD means Development Operations Coordination Document.
DPP means Development and Production Plan.
DWOP means Deepwater Operations Plan.
EIA means Environmental Impact Analysis.
EP means Exploration Plan.
NPDES means National Pollutant Discharge Elimination System.
NTL means Notice to Lessees and Operators.
OCS means Outer Continental Shelf.
(b) Terms used in this subpart are listed alphabetically below:
Amendment means a change you make to an EP, DPP, or DOCD that is pending before BOEM
for a decision (see 30 CFR 550.232(d) and 550.267(d)).
Modification means a change required by the Regional Supervisor to an EP, DPP, or DOCD
(see 30 CFR 550.233(b)(2) and 550.270(b)(2)) that is pending before BOEM for a decision because
the OCS plan is inconsistent with applicable requirements.
New or unusual technology means equipment or procedures that:
(1) Have not been used previously or extensively in a BSEE OCS Region;
(2) Have not been used previously under the anticipated operating conditions; or
(3) Have operating characteristics that are outside the performance parameters established by
this part.
Non-conventional production or completion technology includes, but is not limited to, floating
production systems, tension leg platforms, spars, floating production, storage, and offloading
systems, guyed towers, compliant towers, subsea manifolds, and other subsea production
components that rely on a remote site or host facility for utility and well control services.
Offshore vehicle means a vehicle that is capable of being driven on ice.
Resubmitted OCS plan means an EP, DPP, or DOCD that contains changes you make to an
OCS plan that BOEM has disapproved (see 30 CFR 550.234(b), 550.272(a), and 550.273(b)).

Revised OCS plan means an EP, DPP, or DOCD that proposes changes to an approved OCS
plan, such as those in the location of a well or platform, type of drilling unit, or location of the onshore
support base (see 30 CFR 550.283(a)).
Supplemental OCS plan means an EP, DPP, or DOCD that proposes the addition to an
approved OCS plan of an activity that requires approval of an application or permit (see 30 CFR
550.283(b)).
Back to Top
§250.201 What plans and information must I submit before I conduct any activities on my
lease or unit?
(a) Plans and documents. Before you conduct the activities on your lease or unit listed in the
following table, you must submit, and BSEE must approve, the listed plans and documents. Your
plans and documents may cover one or more leases or units.

You must submit
a(n) . . .

Before you . . .

(1) [Reserved]
(2) [Reserved]
(3) [Reserved]
(4) Deepwater
Operations Plan
(DWOP),

Conduct post-drilling installation activities in any water depth associated
with a development project that will involve the use of a non-conventional
production or completion technology.

(5) [Reserved]
(6) [Reserved]
(b) Submitting additional information. On a case-by-case basis, the Regional Supervisor may
require you to submit additional information if the Regional Supervisor determines that it is
necessary to evaluate your proposed plan or document.
(c) Limiting information. The Regional Director may limit the amount of information or analyses
that you otherwise must provide in your proposed plan or document under this subpart when:
(1) Sufficient applicable information or analysis is readily available to BSEE;
(2) Other coastal or marine resources are not present or affected;
(3) Other factors such as technological advances affect information needs; or
(4) Information is not necessary or required for a State to determine consistency with their
CZMA Plan.

(d) Referencing. In preparing your proposed plan or document, you may reference information
and data discussed in other plans or documents you previously submitted or that are otherwise
readily available to BSEE.
Back to Top
§§250.202-250.203 [Reserved]
Back to Top
§250.204 How must I protect the rights of the Federal government?
(a) To protect the rights of the Federal government, you must either:
(1) Drill and produce the wells that the Regional Supervisor determines are necessary to
protect the Federal government from loss due to production on other leases or units or from adjacent
lands under the jurisdiction of other entities (e.g., State and foreign governments); or
(2) Pay a sum that the Regional Supervisor determines as adequate to compensate the
Federal government for your failure to drill and produce any well.
(b) Payment under paragraph (a)(2) of this section may constitute production in paying
quantities for the purpose of extending the lease term.
(c) You must complete and produce any penetrated hydrocarbon-bearing zone that the
Regional Supervisor determines is necessary to conform to sound conservation practices.
Back to Top
§250.205 Are there special requirements if my well affects an adjacent property?
For wells that could intersect or drain an adjacent property, the Regional Supervisor may
require special measures to protect the rights of the Federal government and objecting lessees or
operators of adjacent leases or units.
Back to Top

POST-APPROVAL REQUIREMENTS FOR THE EP, DPP, AND DOCD
Back to Top
§250.282 Do I have to conduct post-approval monitoring?
The Regional Supervisor may direct you to conduct monitoring programs. You must retain
copies of all monitoring data obtained or derived from your monitoring programs and make them
available to BSEE upon request. The Regional Supervisor may require you to:
(a) Monitoring plans. Submit monitoring plans for approval before you begin work; and

(b) Monitoring reports. Prepare and submit reports that summarize and analyze data and
information obtained or derived from your monitoring programs. The Regional Supervisor will specify
requirements for preparing and submitting these reports.
Back to Top

DEEPWATER OPERATIONS PLAN (DWOP)
Back to Top
§250.286 What is a DWOP?
(a) A DWOP is a plan that provides sufficient information for BSEE to review a deepwater
development project, and any other project that uses non-conventional production or completion
technology, from a total system approach. The DWOP does not replace, but supplements other
submittals required by the regulations such as BOEM Exploration Plans, Development and
Production Plans, and Development Operations Coordination Documents. BSEE will use the
information in your DWOP to determine whether the project will be developed in an acceptable
manner, particularly with respect to operational safety and environmental protection issues involved
with non-conventional production or completion technology.
(b) The DWOP process consists of two parts: a Conceptual Plan and the DWOP. Section
250.289 prescribes what the Conceptual Plan must contain, and §250.292 prescribes what the
DWOP must contain.
Back to Top
§250.287 For what development projects must I submit a DWOP?
You must submit a DWOP for each development project in which you will use non-conventional
production or completion technology, regardless of water depth. If you are unsure whether BSEE
considers the technology of your project non-conventional, you must contact the Regional
Supervisor for guidance.
Back to Top
§250.288 When and how must I submit the Conceptual Plan?
You must submit four copies, or one hard copy and one electronic version, of the Conceptual
Plan to the Regional Director after you have decided on the general concept(s) for development and
before you begin engineering design of the well safety control system or subsea production systems
to be used after well completion.
Back to Top
§250.289 What must the Conceptual Plan contain?
In the Conceptual Plan, you must explain the general design basis and philosophy that you will
use to develop the field. You must include the following information:

(a) An overview of the development concept(s);
(b) A well location plat;
(c) The system control type (i.e., direct hydraulic or electro-hydraulic); and
(d) The distance from each of the wells to the host platform.
Back to Top
§250.290 What operations require approval of the Conceptual Plan?
You may not complete any production well or install the subsea wellhead and well safety
control system (often called the tree) before BSEE has approved the Conceptual Plan.
Back to Top
§250.291 When and how must I submit the DWOP?
You must submit four copies, or one hard copy and one electronic version, of the DWOP to the
Regional Director after you have substantially completed safety system design and before you begin
to procure or fabricate the safety and operational systems (other than the tree), production platforms,
pipelines, or other parts of the production system.
Back to Top
§250.292 What must the DWOP contain?
You must include the following information in your DWOP:
(a) A description and schematic of the typical wellbore, casing, and completion;
(b) Structural design, fabrication, and installation information for each surface system, including
host facilities;
(c) Design, fabrication, and installation information on the mooring systems for each surface
system;
(d) Information on any active stationkeeping system(s) involving thrusters or other means of
propulsion used with a surface system;
(e) Information concerning the drilling and completion systems;
(f) Design and fabrication information for each riser system (e.g., drilling, workover, production,
and injection);
(g) Pipeline information;

(h) Information about the design, fabrication, and operation of an offtake system for transferring
produced hydrocarbons to a transport vessel;
(i) Information about subsea wells and associated systems that constitute all or part of a single
project development covered by the DWOP;
(j) Flow schematics and Safety Analysis Function Evaluation (SAFE) charts (API RP 14C,
subsection 4.3c, incorporated by reference in §250.198) of the production system from the Surface
Controlled Subsurface Safety Valve (SCSSV) downstream to the first item of separation equipment;
(k) A description of the surface/subsea safety system and emergency support systems to
include a table that depicts what valves will close, at what times, and for what events or reasons;
(l) A general description of the operating procedures, including a table summarizing the
curtailment of production and offloading based on operational considerations;
(m) A description of the facility installation and commissioning procedure;
(n) A discussion of any new technology that affects hydrocarbon recovery systems;
(o) A list of any alternate compliance procedures or departures for which you anticipate
requesting approval;
(p) If you propose to use a pipeline free standing hybrid riser (FSHR) on a permanent
installation that utilizes a buoyancy air can suspended from the top of the riser, you must provide the
following information in your DWOP in the discussions required by paragraphs (f) and (g) of this
section:
(1) A detailed description and drawings of the FSHR, buoy, and the associated connection
system;
(2) Detailed information regarding the system used to connect the FSHR to the buoyancy air
can, and associated redundancies; and
(3) Descriptions of your monitoring system and monitoring plan to monitor the pipeline FSHR
and the associated connection system for fatigue, stress, and any other abnormal condition (e.g.,
corrosion) that may negatively impact the riser system's integrity.
(q) Payment of the service fee listed in §250.125.
[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26017, Apr. 29, 2016; 84 FR 21973, May 15, 2019]

Back to Top
§250.293 What operations require approval of the DWOP?
You may not begin production until BSEE approves your DWOP.
Back to Top

§250.294 May I combine the Conceptual Plan and the DWOP?
If your development project meets the following criteria, you may submit a combined
Conceptual Plan/DWOP on or before the deadline for submitting the Conceptual Plan.
(a) The project is located in water depths of less than 400 meters (1,312 feet); and
(b) The project is similar to projects involving non-conventional production or completion
technology for which you have obtained approval previously.
Back to Top
§250.295 When must I revise my DWOP?
You must revise either the Conceptual Plan or your DWOP to reflect changes in your
development project that materially alter the facilities, equipment, and systems described in your
plan. You must submit the revision within 60 days after any material change to the information
required for that part of your plan.

