NESHAP for Taconite Iron Ore Processing (40 CFR part 63 subpart RRRRR) (Final Rule)
Revision of a currently approved collection
No
Regular
Approved without change
02/23/2022
12/22/2020
In accordance with 5 CFR 1320, the information collection is approved for three years. As terms of clearance, upon renewal of this collection, EPA is required to include the following in its supporting statement for this and other NESHAP ICRs: (1) a description of the regulatory text applicable to the ICR including submission specifications; (2) a clear description of the data elements being collected under the ICR; (3) screen shots of the electronic portal where the reporting requirements are submitted to EPA (with the control number and burden statement); (4) a detailed discussion of how information is submitted and the extent to which electronic reporting is available; (5) evidence of consultation with respondents (by actively reaching out to stakeholders as permitted by the PRA) to ensure the supporting statement's accuracy on availability of data, frequency of collection, clarity of instructions, accuracy of burden estimate, relevance of data elements, and similar PRA matters; and (6) discussion of how EPA addressed substantive concerns raised by respondents and other stakeholders during consultation and in response to comments received on FR notices. In addition, please convert the supporting statement to the standard 18 question SS-A format upon renewal.
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
02/28/2025
36 Months From Approved
06/30/2022
32
0
23
1,483
0
483
521,000
0
521,000
The National Emission Standards for Hazardous Air Pollutants (NESHAP) for the regulations published at 40 CFR Part 63, Subpart RRRRR were proposed on December 18, 2002, promulgated on October 30, 2003, and amended on April 20, 2006. These regulations apply to existing facilities and new taconite iron ore processing facilities that emit or have the potential to emit a single hazardous air pollutant (HAP) at a rate of 10 tons or more per year or any combination of HAPs at a rate of 25 tons or more per year. The affected sources are ore crushing and handling operations, ore dryers, indurating furnaces, finished pellet handling emission units, and fugitive dust emissions. New facilities include those that commenced construction or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 63, Subpart RRRRR.
The final RTR amendments to the rule eliminate the startup, shutdown, and malfunction (SSM) exemption; remove the SSM plan requirement; add electronic submittal of notifications, semiannual reports, and performance test reports; remove requirements to conduct quarterly internal inspections of baghouses if the baghouse is equipped with a bag leak detection system; reduce from 2 hours to 1 hour the duration of each PM test run; and make technical and editorial changes. The remaining portions of the NESHAP remain unchanged.
In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.
Amendments to the NESHAP for Taconite Iron Ore Processing facilities (1) adjust references to the Part 63 General Provisions (40 CFR, Part 63, Subpart A) and revise provisions in the NESHAP (40 CFR Part 63, Subpart RRRRR) to remove the SSM exemption and SSM plan requirement; (2) add electronic submittal of notifications, semiannual reports, and performance test reports; and (3) make technical and editorial changes. Where applicable, adjustments for these final RTR amendments are reflected in Tables 1 and 2 of this ICR.
The burden estimate for familiarizing with regulatory requirements was increased to reflect the actual time it would take industry to review the final amendments. Many of the burden items are one-time requirements that would apply only to new respondents and no new respondents are anticipated over the 3-year period of this ICR. Costs charged by testing contractors for Method 5 PM performance tests increase over time. Burden estimates were added for the industry to prepare notifications of performance test/performance evaluation, report the results of the performance tests through the ERT, prepare notification of compliance status, record failures to meet standards and actions taken to minimize emissions, transition to submitting notifications and semiannual reports through CEDRI, and compile data for semiannual reports. Burden estimates were removed for developing SSM plans and submitting periodic SSM reports.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.