Contractor's and/or Mortgagor's Cost Breakdown Schedules of Values Section 232
|
U.S. Department of Housing and Urban Development Office of Residential Care Facilities |
OMB
No. 2502-0605 |
Public reporting burden for this collection of information is estimated to average 4 hours. This includes the time for collecting, reviewing, and reporting the data. The information is being collected to obtain the supportive documentation which must be submitted to HUD for approval, and is necessary to ensure that viable projects are developed and maintained. The Department will use this information to determine if properties meet HUD requirements with respect to development, operation and/or asset management, as well as ensuring the continued marketability of the properties. This agency may not collect this information, and you are not required to complete this form unless it displays a currently valid OMB control number.
Warning: Any person who knowingly presents a false, fictitious, or fraudulent statement or claim in a matter within the jurisdiction of the U.S. Department of Housing and Urban Development is subject to criminal penalties, civil liability, and administrative sanctions.
Date: |
Sponsor: |
|
FHA Project Number: |
Building Identification: |
|
Project Name: |
||
Project Address: |
This form represents the Contractors and/or Borrowers firm costs and services as a basis for disbursing dollar amounts when insured advances are requested. Detailed instructions for completing this form are included at the end.
Line |
Div. |
Trade Item |
Cost |
Trade Description |
1 |
3 |
Concrete |
|
|
2 |
4 |
Masonry |
|
|
3 |
5 |
Metals |
|
|
4 |
6 |
Rough Carpentry |
|
|
5 |
6 |
Finish Carpentry |
|
|
6 |
7 |
Waterproofing |
|
|
7 |
7 |
Insulation |
|
|
8 |
7 |
Roofing |
|
|
9 |
7 |
Sheet Metal |
|
|
10 |
8 |
Doors |
|
|
11 |
8 |
Windows |
|
|
12 |
8 |
Glass |
|
|
13 |
9 |
Lath and Plaster |
|
|
14 |
9 |
Drywall |
|
|
15 |
9 |
Tile Work |
|
|
16 |
9 |
Acoustical |
|
|
17 |
9 |
Wood Flooring |
|
|
18 |
9 |
Resilient Flooring |
|
|
19 |
9 |
Painting and Decorating |
|
|
20 |
10 |
Specialties |
|
|
21 |
11 |
Special Equipment |
|
|
22 |
11 |
Cabinets |
|
|
23 |
11 |
Appliances |
|
|
24 |
12 |
Blinds and Shades, Artwork |
|
|
25 |
12 |
Carpets |
|
|
26 |
13 |
Special Construction |
|
|
27 |
14 |
Elevators |
|
|
28 |
15 |
Plumbing and Hot Water |
|
|
29 |
15 |
Heat and Ventilation |
|
|
30 |
15 |
Air Conditioning |
|
|
31 |
16 |
Electrical |
|
|
32 |
|
Subtotal (Structures) |
|
|
33 |
|
Accessory Structures |
|
|
34 |
|
Total (Lines 32 and 33) |
|
|
Line |
Div. |
Trade Item |
Cost |
Trade Description |
|||
35 |
2 |
Earth Work |
|
|
|||
36 |
2 |
Site Utilities |
|
|
|||
37 |
2 |
Roads and Walks |
|
|
|||
38 |
2 |
Site Improvements |
|
|
|||
39 |
2 |
Lawns and Planting |
|
|
|||
40 41 |
2 |
Unusual Site Condition Total Land Improvements |
|
Nonresidential and Special Exterior Land Improvement (costs included in trade item breakdown) |
Offsite Costs (costs not included in trade item breakdown) |
||
42 |
|
Total Struct. & Land Imprvts. |
|
Description |
Est. Cost |
Description |
Est. Cost |
43 |
1 |
General Requirements |
|
|
|
|
|
44 |
|
Subtotal (Lines 42 and 43) |
|
|
|
||
45 |
|
Builder's Overhead |
|
|
|
|
|
46 |
|
Builder's Profit |
|
Total $ |
|
|
|
47 |
|
Subtotal (Lines 44 thru 46) |
|
Other Fees |
Total $ |
||
48 |
|
|
|
|
|
Demolition (costs not included in trade item breakdown) |
|
49 |
|
Other Fees |
|
|
|
||
50 |
|
Bond Premium |
|
|
|
Description |
Est. Cost |
51 |
|
Total for All Improvements |
|
|
|
|
|
52 |
|
Builder's Profit Paid by Means Other Than Cash |
|
|
|
|
|
53 |
|
Total for All Improvements Less Line 52 |
|
|
|
|
|
Total $ |
Total $ |
I hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is true and accurate.
Borrower |
Signature: |
Date: |
Contractor |
Signature: |
Date: |
ORCF Authorized Agent Date |
Signature: |
Date: |
Instructions for Completing Form HUD-92328-ORCF
This form is prepared by the contractor and/or borrower as a requirement for the issuance of a firm commitment. The firm replacement cost of the project also serves as a basis for the disbursement of dollar amounts when insured advances are requested. A detailed breakdown of trade items is provided along with spaces to enter dollar amounts and trade descriptions.
Date-Date form was prepared.
Sponsor-Name of sponsor or sponsoring organization.
FHA Project No.-Eight-digit assigned project number.
Building Identification-Number(s) or Letter(s) of each building as designated on plans.
Name of Project-Sponsors designated name of project. Project Location-Street address, city and state.
Division-Division numbers and trade items have been developed from the cost accounting section of the uniform system.
Accessory Structures-This item reflects structures, such as: community, storage, maintenance, mechanical, laundry and project office buildings. Also included are garages and carports or other buildings.
When the amount shown on line 33 is $20,000.00 or 2% of line 32 whichever is the lesser, a separate form HUD-92328-ORCF will be prepared through line 32 for Accessory Structures.
Unusual Site Conditions-This trade item reflects rock excavation, high water table, excessive cut and fill, retaining walls, erosion, poor drainage and other on-site conditions considered unusual.
Cost-Enter the cost being submitted by the Contractor or bids submitted by a qualified subcontractor for each trade item. These costs will include, as a minimum, prevailing wage rates as determined by the Secretary of Labor.
Trade Description-Enter a brief description of the work included in each trade item.
Other Fees-Includable are fees to be paid by the Contractor, such as sewer tap fees not included in the plumbing contract. Fees paid or to be paid by the Mortgagor are not to be included on this form.
Total For All Improvements-This is the sum of lines 1 through 50 and is to include the total builder's profit (line 46).
Line 52-When applicable, enter that portion of the builder's profit (line 46) to be paid by means other than cash and/or any part of the builder's profit to be waived during construction.
Non-Residential and Special Exterior Land Improvement Costs-Describe and enter the cost of each improvement, i.e. on-site parking facilities including individual garages and carports, commercial facilities, swimming pools with related facilities and on-site features provided to enhance the environment and livability of the project and the neighborhood. The Design Representative and Cost Analyst shall collaborate with the borrower or their representative in designating the items to be included.
Off-Site Costs-Enter description and dollar amount including fees and bond premium for off-site improvements.
Demolition-Enter description and dollar amount of demolition work necessary to condition site for building improvements including the removal of existing structures, foundations, utilities, etc.
Other Fees-Enter a brief description of item involved and cost estimate for each item.
Signatures-Enter the firm name, signature of authorized officer of the contractor and/or Borrower and date the form was completed.