BOEM-0139 Air Emissions DOCD and DPP

Oil and Gas and Sulfur Operations on the Outer Continental Shelf—Revisions to the Requirements for Exploratory Drilling on the Arctic Outer Continental Shelf

BOEM-0139_DOCD_DPP_Air Emissions_7-20-2020.xlsx

200-209; 211-228; 231-285 - Contents of Exploration Plans (EP)

OMB: 1010-0151

Document [xlsx]
Download: xlsx | pdf

Overview

TITLE
FACTORS
EMISSIONS1
EMISSIONS2
EMISSIONS3
EMISSIONS4
EMISSIONS5
EMISSIONS6
EMISSIONS7
EMISSIONS8
EMISSIONS9
EMISSIONS10
SUMMARY


Sheet 1: TITLE

COMPANY

AREA

BLOCK
LEASE
FACILITY
WELL
COMPANY CONTACT
TELEPHONE NO.
REMARKS



LEASE TERM PIPELINE CONSTRUCTION INFORMATION:

YEAR NUMBER OF TOTAL NUMBER OF CONSTRUCTION DAYS

PIPELINES
2020

2021

2022

2023

2024

2025

2026

2027

2028

2029



















The Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.) requires us to inform you that BOEM
collects this information as part of an applicant's DOCD submitted for our approval. We use the information to facilitate our review and data entry for OCS plans. We will protect proprietary data according to the Freedom of Information Act and 30 CFR 250.197. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. Responses are mandatory (43 U.S.C. 1334). The reporting burden for this form is included in the burden for preparing EPs and DOCDs. We estimate that burden to average 700 hours per response, including the time for reviewing instructions, gathering and maintaining the data, and completing and reviewing the forms associated with subpart B. Direct comments on the burden estimate or any other aspect of this form to the Information Collection Clearance Officer, Bureau of Ocean Energy Management, 45600 Woodland Road, Sterling, Virginia 20166.

Sheet 2: FACTORS

Fuel Usage Conversion Factors Natural Gas Turbines

Natural Gas Engines Diesel Recip. Engine Diesel Turbines



SCF/hp-hr 9.524

SCF/hp-hr 7.143 GAL/hp-hr 0.0514 GAL/hp-hr 0.0514
















Equipment/Emission Factors units TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 REF. DATE Reference Links














Natural Gas Turbine g/hp-hr
0.0086 0.0086 0.0026 1.4515 0.0095 N/A 0.3719 N/A AP42 3.1-1& 3.1-2a 4/00 https://www3.epa.gov/ttnchie1/ap42/ch03/final/c03s01.pdf
RECIP. 2 Cycle Lean Natural Gas g/hp-hr
0.1293 0.1293 0.0020 6.5998 0.4082 N/A 1.2009 N/A AP42 3.2-1 7/00 https://www3.epa.gov/ttn/chief/ap42/ch03/final/c03s02.pdf
RECIP. 4 Cycle Lean Natural Gas g/hp-hr
0.0002 0.0002 0.0020 2.8814 0.4014 N/A 1.8949 N/A AP42 3.2-2 7/00 https://www3.epa.gov/ttn/chief/ap42/ch03/final/c03s02.pdf
RECIP. 4 Cycle Rich Natural Gas g/hp-hr
0.0323 0.0323 0.0020 7.7224 0.1021 N/A 11.9408 N/A AP42 3.2-3 7/00 https://www3.epa.gov/ttn/chief/ap42/ch03/final/c03s02.pdf













Diesel Recip. < 600 hp g/hp-hr 1 1 1 0.0279 14.1 1.04 N/A 3.03 N/A AP42 3.3-1 10/96 https://www3.epa.gov/ttnchie1/ap42/ch03/final/c03s03.pdf
Diesel Recip. > 600 hp g/hp-hr 0.32 0.182 0.178 0.0055 10.9 0.29 N/A 2.5 N/A AP42 3.4-1 & 3.4-2 10/96 https://www3.epa.gov/ttn/chief/ap42/ch03/final/c03s04.pdf
Diesel Boiler lbs/bbl 0.0840 0.0420 0.0105 0.0089 1.0080 0.0084 5.14E-05 0.2100 0.0336 AP42 1.3-6; Pb and NH3: WebFIRE (08/2018) 9/98 and 5/10 https://www3.epa.gov/ttnchie1/ap42/ch01/final/c01s03.pdf https://cfpub.epa.gov/webfire/
Diesel Turbine g/hp-hr 0.0381 0.0137 0.0137 0.0048 2.7941 0.0013 4.45E-05 0.0105 N/A AP42 3.1-1 & 3.1-2a 4/00 https://www3.epa.gov/ttnchie1/ap42/ch03/final/c03s01.pdf https://cfpub.epa.gov/webfire/
Dual Fuel Turbine g/hp-hr 0.0381 0.0137 0.0137 0.0048 2.7941 0.0095 4.45E-05 0.3719 0.0000 AP42 3.1-1& 3.1-2a; AP42 3.1-1 & 3.1-2a 4/00













Vessels – Propulsion g/hp-hr 0.320 0.1931 0.1873 0.0047 7.6669 0.2204 2.24E-05 1.2025 0.0022 USEPA 2017 NEI;TSP refer to Diesel Recip. > 600 hp reference 3/19 https://www.epa.gov/air-emissions-inventories/2017-national-emissions-inventory-nei-data
Vessels – Drilling Prime Engine, Auxiliary g/hp-hr 0.320 0.1931 0.1873 0.0047 7.6669 0.2204 2.24E-05 1.2025 0.0022 USEPA 2017 NEI;TSP refer to Diesel Recip. > 600 hp reference 3/19
Vessels – Diesel Boiler g/hp-hr 0.0466 0.1491 0.1417 0.4400 1.4914 0.0820 3.73E-05 0.1491 0.0003 USEPA 2017 NEI;TSP (units converted) refer to Diesel Boiler Reference 3/19
Vessels – Well Stimulation g/hp-hr 0.320 0.1931 0.1873 0.0047 7.6669 0.2204 2.24E-05 1.2025 0.0022 USEPA 2017 NEI;TSP refer to Diesel Recip. > 600 hp reference 3/19
Natural Gas Heater/Boiler/Burner lbs/MMscf 7.60 1.90 1.90 0.60 190.00 5.50 5.00E-04 84.00 3.2 AP42 1.4-1 & 1.4-2; Pb and NH3: WebFIRE (08/2018) 7/98 and 8/18 https://www3.epa.gov/ttnchie1/ap42/ch01/final/c01s04.pdf https://cfpub.epa.gov/webfire/
Combustion Flare (no smoke) lbs/MMscf 0.00 0.00 0.00 0.57 71.40 35.93 N/A 325.5 N/A AP42 13.5-1, 13.5-2 2/18 https://www3.epa.gov/ttn/chief/ap42/ch13/final/C13S05_02-05-18.pdf
Combustion Flare (light smoke) lbs/MMscf 2.10 2.10 2.10 0.57 71.40 35.93 N/A 325.5 N/A AP42 13.5-1, 13.5-2 2/18
Combustion Flare (medium smoke) lbs/MMscf 10.50 10.50 10.50 0.57 71.40 35.93 N/A 325.5 N/A AP42 13.5-1, 13.5-2 2/18
Combustion Flare (heavy smoke) lbs/MMscf 21.00 21.00 21.00 0.57 71.40 35.93 N/A 325.5 N/A AP42 13.5-1, 13.5-2 2/18














Liquid Flaring lbs/bbl 0.42 0.0966 0.0651 5.964 0.84 0.01428 5.14E-05 0.21 0.0336 AP42 1.3-1 through 1.3-3 and 1.3-5 5/10 https://www3.epa.gov/ttnchie1/ap42/ch01/final/c01s03.pdf
Storage Tank tons/yr/tank




4.300


2014 Gulfwide Inventory; Avg emiss (upper bound of 95% CI) 2017 https://www.boem.gov/environment/environmental-studies/2014-gulfwide-emission-inventory
Fugitives lbs/hr/component




0.0005


API Study 12/93 https://www.apiwebstore.org/publications/item.cgi?9879d38a-8bc0-4abe-bb5c-9b623870125d
Glycol Dehydrator tons/yr/dehydrator




19.240


2011 Gulfwide Inventory; Avg emiss (upper bound of 95% CI) 2014 https://www.boem.gov/environment/environmental-studies/2011-gulfwide-emission-inventory
Cold Vent tons/yr/vent




44.747


2014 Gulfwide Inventory; Avg emiss (upper bound of 95% CI) 2017 https://www.boem.gov/environment/environmental-studies/2014-gulfwide-emission-inventory














Waste Incinerator lb/ton
15.0 15.0 2.5 2.0 N/A N/A 20.0 N/A AP 42 2.1-12 10/96 https://www3.epa.gov/ttnchie1/ap42/ch02/final/c02s01.pdf
On-Ice – Loader lbs/gal  0.043 0.043 0.043 0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model; TSP (units converted) refer to Diesel Recip. <600 reference 2009 https://www.epa.gov/moves/nonroad2008a-installation-and-updates
On-Ice – Other Construction Equipment lbs/gal  0.043 0.043 0.043 0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model; TSP (units converted) refer to Diesel Recip. <600 reference 2009
On-Ice – Other Survey Equipment lbs/gal  0.043 0.043 0.043 0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model; TSP (units converted) refer to Diesel Recip. <600 reference 2009
On-Ice – Tractor lbs/gal  0.043 0.043 0.043 0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model; TSP (units converted) refer to Diesel Recip. <600 reference 2009
On-Ice – Truck (for gravel island) lbs/gal  0.043 0.043 0.043 0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model; TSP (units converted) refer to Diesel Recip. <600 reference 2009
On-Ice – Truck (for surveys) lbs/gal  0.043 0.043 0.043 0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model; TSP (units converted) refer to Diesel Recip. <600 reference 2009
Man Camp - Operation (max people/day) tons/person/day
0.0004 0.0004 0.0004 0.006 0.001 N/A 0.001 N/A BOEM 2014-1001 2014 https://www.boem.gov/sites/default/files/uploadedFiles/BOEM/BOEM_Newsroom/Library/Publications/2014-1001.pdf
Vessels - Ice Management Diesel g/hp-hr 0.320 0.1931 0.1873 0.0047 7.6669 0.2204 2.24E-05 1.2025 0.0022 USEPA 2017 NEI;TSP refer to Diesel Recip. > 600 hp reference 3/19 https://www.epa.gov/air-emissions-inventories/2017-national-emissions-inventory-nei-data
Vessels - Hovercraft Diesel g/hp-hr 0.320 0.1931 0.1873 0.0047 7.6669 0.2204 2.24E-05 1.2025 0.0022 USEPA 2017 NEI;TSP refer to Diesel Recip. > 600 hp reference 3/19 https://www.epa.gov/air-emissions-inventories/2017-national-emissions-inventory-nei-data




























Sulfur Content Source Value Units


Density and Heat Value of Diesel Fuel




Fuel Gas 3.38 ppm


Density 7.05 lbs/gal




Diesel Fuel 0.0015 % weight


Heat Value 19,300 Btu/lb




Produced Gas (Flare) 3.38 ppm










Produced Oil (Liquid Flaring) 1 % weight


Heat Value of Natural Gas









Heat Value 1,050 MMBtu/MMscf

















Natural Gas Flare Parameters Value Units










VOC Content of Flare Gas 0.6816 lb VOC/lb-mol gas










Natural Gas Flare Efficiency 98 %











Sheet 3: EMISSIONS1

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler



0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 0 0 -- -- -- -- -- #DIV/0! -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 0 0 -- -- -- -- -- #DIV/0! -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 0 0 -- -- -- -- -- #DIV/0! -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00 -- -- 0.00 --

















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2020 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2020 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 4: EMISSIONS2

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2021 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2021 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 5: EMISSIONS3

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2022 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2022 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 6: EMISSIONS4

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2023 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2023 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 7: EMISSIONS5

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2024 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2024 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 8: EMISSIONS6

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2025 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2025 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 9: EMISSIONS7

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 0 0 -- -- -- -- -- #DIV/0! -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 0 0 -- -- -- -- -- #DIV/0! -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 0 0 -- -- -- -- -- #DIV/0! -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2026 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2026 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 10: EMISSIONS8

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2027 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2027 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 11: EMISSIONS9

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2028 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2028 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 12: EMISSIONS10

COMPANY AREA
BLOCK LEASE FACILITY WELL



CONTACT PHONE
REMARKS



























0 0






















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME



MAXIMUM POUNDS PER HOUR







ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D






































Nat. Gas Engines
HP SCF/HR SCF/D






































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3 TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxiliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


























































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
























































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- -- 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT






































STORAGE TANK


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- -- -- 0.00 -- -- -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 -- 0.00 0.00 0.00 0.00 -- -- 0.00 -- -- 0.00 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR




































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2029 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES














0.00

0.00 0.00 0.00
0.00



















0.0









































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D






































Man Camp - Operation (maximum people per day)
PEOPLE/DAY








































VESSELS
kW

HR/D D/YR




































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2029 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 13: SUMMARY

COMPANY AREA BLOCK LEASE FACILITY WELL


0








Facility Emitted Substance



Year


















TSP PM10 PM2.5 SOx NOx VOC Pb CO NH3
2020 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2022 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2023 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2024 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2025 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2026 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2027 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2028 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2029 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Allowable 0.00

0.00 0.00 0.00
0.00
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy