BOEM-0139 DOCD/DPP - Air Quality

Oil and Gas and Sulfur Operations on the Outer Continental Shelf—Revisions to the Requirements for Exploratory Drilling on the Arctic Outer Continental Shelf

BOEM-0139_DOCD_DPP_Air Emissions.xlsx

200-206; 209; 241-241-262; 266-285 - Contents of DPP and DOCD

OMB: 1010-0151

Document [xlsx]
Download: xlsx | pdf

Overview

TITLE
FACTORS
EMISSIONS1
EMISSIONS2
EMISSIONS3
EMISSIONS4
EMISSIONS5
EMISSIONS6
EMISSIONS7
EMISSIONS8
EMISSIONS9
EMISSIONS10
SUMMARY


Sheet 1: TITLE

COMPANY

AREA

BLOCK
LEASE
FACILITY
WELL
COMPANY CONTACT
TELEPHONE NO.
REMARKS*






LEASE TERM PIPELINE CONSTRUCTION INFORMATION:

YEAR NUMBER OF TOTAL NUMBER OF CONSTRUCTION DAYS

PIPELINES
2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030







* Indicate if the calculated projected emission estimates are for a facility, a temporary facility, or construction activities of a facility (including installation activities for lease-term pipelines).


Sheet 2: FACTORS

Fuel Usage Conversion Factors Natural Gas Turbines Natural Gas Engines Diesel Recip. Engine Diesel Turbines



SCF/hp-hr 9.524 SCF/hp-hr 7.143 GAL/hp-hr 0.0514 GAL/hp-hr 0.0514














Equipment/Emission Factors units PM SOx NOx VOC Pb CO NH3 REF. DATE Reference Links












Natural Gas Turbine g/hp-hr
0.0026 1.4515 0.0095 N/A 0.3719 N/A AP42 3.1-1& 3.1-2a 4/00 https://www3.epa.gov/ttnchie1/ap42/ch03/final/c03s01.pdf
RECIP. 2 Cycle Lean Natural Gas g/hp-hr
0.0020 6.5998 0.4082 N/A 1.2009 N/A AP42 3.2-1 7/00 https://www3.epa.gov/ttn/chief/ap42/ch03/final/c03s02.pdf
RECIP. 4 Cycle Lean Natural Gas g/hp-hr
0.0020 2.8814 0.4014 N/A 1.8949 N/A AP42 3.2-2 7/00 https://www3.epa.gov/ttn/chief/ap42/ch03/final/c03s02.pdf
RECIP. 4 Cycle Rich Natural Gas g/hp-hr
0.0020 7.7224 0.1021 N/A 11.9408 N/A AP42 3.2-3 7/00 https://www3.epa.gov/ttn/chief/ap42/ch03/final/c03s02.pdf











Diesel Recip. < 600 hp g/hp-hr 1 0.93 14.1 1.04 N/A 3.03 N/A AP42 3.3-1 10/96 https://www3.epa.gov/ttnchie1/ap42/ch03/final/c03s03.pdf
Diesel Recip. > 600 hp g/hp-hr 0.32 0.0055 10.9 0.29 N/A 2.5 N/A AP42 3.4-1 & 3.4-2 10/96 https://www3.epa.gov/ttn/chief/ap42/ch03/final/c03s04.pdf
Diesel Boiler lbs/bbl 0.0840 0.0089 1.0080 0.0084 0.0001 0.2100 0.0336 AP42 1.3-6; Pb and NH3: WebFIRE (08/2018) 9/98 and 5/10 https://www3.epa.gov/ttnchie1/ap42/ch01/final/c01s03.pdf https://cfpub.epa.gov/webfire/
Diesel Turbine g/hp-hr
0.0048 2.7941 0.0013 0.0000 0.0105 N/A AP42 3.1-1 & 3.1-2a 4/00 https://www3.epa.gov/ttnchie1/ap42/ch03/final/c03s01.pdf https://cfpub.epa.gov/webfire/
Dual Fuel Turbine g/hp-hr
0.0048 2.7941 0.0095 0.0000 0.3719 0.0000 AP42 3.1-1& 3.1-2a; AP42 3.1-1 & 3.1-2a 4/00











Vessels – Propulsion g/hp-hr 0.32 0.268452 12.6769 0.469791 2.2371E-05 1.0440 0.0022 EPA CMV model (2019); PM: refer to Diesel Recip. > 600 hp reference 3/19 https://www.epa.gov/air-emissions-inventories/2017-national-emissions-inventory-nei-data
Vessels – Drilling Prime Engine, Auxilliary g/hp-hr 0.32 0.313194 10.29066 0.313194 2.2371E-05 0.6711 0.0037 EPA CMV model (2019); PM: refer to Diesel Recip. > 600 hp reference 3/19
Vessels – Diesel Boiler g/hp-hr
0.439963 1.4914 0.082027 3.7285E-05 0.1491 0.0003 EPA CMV model (2019) 3/19
Vessels – Well Stimulation g/hp-hr 0.32 0.268452 12.6769 0.469791 2.2371E-05 1.0440 0.0022 EPA CMV model (2019); PM: refer to Diesel Recip. > 600 hp reference 3/19
Natural Gas Heater/Boiler/Burner lbs/MMscf 7.60 0.60 190.00 5.50 0.001 84.00 3.2 AP42 1.4-1 & 1.4-2; Pb and NH3: WebFIRE (08/2018) 7/98 and 8/18 https://www3.epa.gov/ttnchie1/ap42/ch01/final/c01s04.pdf https://cfpub.epa.gov/webfire/
Combustion Flare (no smoke) lbs/MMscf
0.57 71.40 35.93 N/A 325.5 N/A AP42 13.5-1, 13.5-2 2/18 https://www3.epa.gov/ttn/chief/ap42/ch13/final/C13S05_02-05-18.pdf
Combustion Flare (light smoke) lbs/MMscf
0.57 71.40 35.93 N/A 325.5 N/A AP42 13.5-1, 13.5-2 2/18
Combustion Flare (medium smoke) lbs/MMscf
0.57 71.40 35.93 N/A 325.5 N/A AP42 13.5-1, 13.5-2 2/18
Combustion Flare (heavy smoke) lbs/MMscf
0.57 71.40 35.93 N/A 325.5 N/A AP42 13.5-1, 13.5-2 2/18












Liquid Flaring lbs/bbl 0.42 5.964 0.84 0.01428 5.14E-05 0.21 0.0336 AP42 1.3-1 through 1.3-3 and 1.3-5 5/10 https://www3.epa.gov/ttnchie1/ap42/ch01/final/c01s03.pdf
Storage Tank tons/yr/tank


3.921


2014 Gulfwide Inventory; Avg emiss (upper bound of 95% CI) 2017 https://www.boem.gov/environment/environmental-studies/2014-gulfwide-emission-inventory
Fugitives lbs/hr/component


0.0005


API Study 12/93 https://www.api.org/
Glycol Dehydrator tons/yr/dehydrator


16.706


2011 Gulfwide Inventory; Avg emiss (upper bound of 95% CI) 2014 https://www.boem.gov/environment/environmental-studies/2011-gulfwide-emission-inventory
Cold Vent tons/yr/vent


44.646


2014 Gulfwide Inventory; Avg emiss (upper bound of 95% CI) 2017 https://www.boem.gov/environment/environmental-studies/2014-gulfwide-emission-inventory












Waste Incinerator lb/ton
2.500 2.000 N/A N/A 20.000 N/A AP 42 2.1-12 10/96 https://www3.epa.gov/ttnchie1/ap42/ch02/final/c02s01.pdf
On-Ice – Loader lbs/gal 
0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model 2009 https://www.epa.gov/moves/nonroad2008a-installation-and-updates
On-Ice – Other Construction Equipment lbs/gal 
0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model 2009
On-Ice – Other Survey Equipment lbs/gal 
0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model 2009
On-Ice – Tractor lbs/gal 
0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model 2009
On-Ice – Truck (for gravel island) lbs/gal 
0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model 2009
On-Ice – Truck (for surveys) lbs/gal 
0.040 0.604 0.049 N/A 0.130 0.003 USEPA NONROAD2008 model 2009
Man Camp - Operation (max people/day) tons/person/day
0.0004 0.006 0.001 N/A 0.001 N/A BOEM 2014-1001 2014 https://www.boem.gov/sites/default/files/uploadedFiles/BOEM/BOEM_Newsroom/Library/Publications/2014-1001.pdf
Vessels - Ice Management Diesel g/kW-hr
0.006 13.360 0.141 N/A 2.480 0.001 USEPA NEI 2014 2018 https://www.epa.gov/air-emissions-inventories/2014-national-emissions-inventory-nei-data
Vessels - Hovercraft Diesel g/kW-hr
0.006 13.360 0.141 N/A 2.480 0.001 USEPA NEI 2014 2018 https://www.epa.gov/air-emissions-inventories/2014-national-emissions-inventory-nei-data
























Sulphur Content Source Value Units
Density and Heat Value of Diesel Fuel




Fuel Gas 3.38 ppm
Density 7.05 lbs/gal




Diesel Fuel 0.0015 % weight
Heat Value 19,300 Btu/lb




Produced Gas (Flare) 3.38 ppm








Produced Oil (Liquid Flaring) 1 % weight
Heat Value of Natural Gas







Heat Value 1,050 MMBtu/MMscf















Natural Gas Flare Parameters Value Units








VOC Content of Flare Gas 0.6816 lb VOC/lb-mol gas








Natural Gas Flare Efficiency 98 %









Sheet 3: EMISSIONS1

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2020 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2020 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 4: EMISSIONS2

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2021 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2021 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 5: EMISSIONS3

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2022 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2022 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 6: EMISSIONS4

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2023 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2023 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 7: EMISSIONS5

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2024 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2024 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 8: EMISSIONS6

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2025 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2025 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 9: EMISSIONS7

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2026 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2026 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 10: EMISSIONS8

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2027 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2027 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 11: EMISSIONS9

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2028 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2028 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 12: EMISSIONS10

COMPANY AREA
BLOCK LEASE FACILITY WELL

CONTACT PHONE
REMARKS

























0 0




















OPERATIONS EQUIPMENT EQUIPMENT ID RATING MAX. FUEL ACT. FUEL RUN TIME

MAXIMUM POUNDS PER HOUR





ESTIMATED TONS






















Diesel Engines
HP GAL/HR GAL/D


































Nat. Gas Engines
HP SCF/HR SCF/D


































Burners
MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC Pb CO NH3 PM SOx NOx VOC Pb CO NH3

















DRILLING VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS- Drilling - Propulsion Engine - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels - Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Vessels – Drilling Prime Engine, Auxilliary
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PIPELINE VESSELS - Pipeline Laying Vessel - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Pipeline Burying - Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































FACILITY INSTALLATION VESSELS - Heavy Lift Vessel/Derrick Barge Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00






















































PRODUCTION RECIP.<600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP.>600hp Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















VESSELS - Shuttle Tankers
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Well Stimulation
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 --


















Dual Fuel Turbine
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















RECIP. 2 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Lean Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















RECIP. 4 Cycle Rich Natural Gas
0 0 0.00 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















Diesel Boiler
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Natural Gas Heater/Boiler/Burner
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















MISC.
BPD SCF/HR COUNT


































STORAGE TANK


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















COMBUSTION FLARE - no smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0
0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COLD VENT

0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















FUGITIVES


0 0 0 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















GLYCOL DEHYDRATOR


0 1 1 -- -- -- 0.00 -- -- -- -- -- -- 0.00 -- -- --


















WASTE INCINERATOR
0

0 0 0.00 0.00 0.00 -- -- 0.00 -- 0.00 0.00 0.00

0.00


















DRILLING Liquid Flaring
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















WELL TEST COMBUSTION FLARE - no smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - light smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - medium smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --


















COMBUSTION FLARE - heavy smoke

0 0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00 --

















ALASKA-SPECIFIC SOURCES VESSELS
kW

HR/D D/YR
































VESSELS - Ice Management Diesel
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00

















2029 Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES












0.00 0.00 0.00 0.00
0.00



















0.0





































DRILLING VESSELS- Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Tugs Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PIPELINE VESSELS - Support Diesel, Laying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Support Diesel, Burying
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















FACILITY VESSELS - Material Tug Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















INSTALLATION VESSELS - Crew Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















VESSELS - Supply Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















PRODUCTION VESSELS - Support Diesel
0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















ALASKA-SPECIFIC SOURCES On-Ice Equipment

GAL/HR GAL/D


































Man Camp - Operation (maximum people per day)
PEOPLE/DAY




































VESSELS
kW

HR/D D/YR
































On-Ice – Loader

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Construction Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Other Survey Equipment

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Tractor

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for gravel island)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















On-Ice – Truck (for surveys)

0 0.0 0 0 0.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 0.00 0.00 -- 0.00 0.00


















Man Camp - Operation
0

0 0 0.00 0.00 0.00 0.00 -- 0.00 -- 0.00 0.00 0.00 0.00 -- 0.00



















VESSELS - Hovercraft Diesel
0

0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

















2029 Non-Facility Total Emissions





0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


















Sheet 13: SUMMARY

COMPANY AREA BLOCK LEASE FACILITY WELL
0




Facility Emitted Substance



Year














PM SOx NOx VOC Pb CO NH3
2020 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2021 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2022 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2023 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2024 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2025 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2026 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2027 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2028 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2029 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Allowable 0.00 0.00 0.00 0.00
0.00
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy