RM19-16 & 19-17, Staff Presentation for NOPR

staff presentation01-23-20-E-20.pdf

FERC-725Z, (Final Rule in RM19-16), Mandatory Reliability Standards: IRO Reliability Standards

RM19-16 & 19-17, Staff Presentation for NOPR

OMB: 1902-0276

Document [pdf]
Download: pdf | pdf
FERC Open Commission Meeting

January 23, 2020
Staff Presentation Items
E-20, E-21, E-22 and E-24

Good morning Chairman and Commissioners,
Today we are presenting for your approval four reliability-related matters: Items
E-20, E-21, E-22, and E-24.
Item E-20 is a draft order on NERC’s five-year performance assessment filing. This
performance assessment is the third such assessment filed by NERC as the Electric
Reliability Organization, marking NERC’s thirteenth year as the ERO. The draft order
finds that NERC and the Regional Entities continue to satisfy statutory and regulatory
criteria. The draft order recognizes the achievements NERC and the Regional Entities
have made over the last five years, including NERC’s risk-based approach that focuses
ERO resources on matters of most significance to reliability. The draft order
concludes that NERC continues to demonstrate its ability to develop and enforce
Reliability Standards.
In addition, as with prior Commission orders on NERC performance assessment filings,
the draft order identifies improvements that NERC or the Regional Entities must
make. Specifically, the draft order provides directives regarding: NERC’s Regional
Entity oversight activities; the process for developing reliability guidelines;
performance metrics for the Electricity Information Sharing and Analysis Center,
known as the E-ISAC; sanction guidelines; and NERC’s organization certification
program. The directives in the draft order do not dictate how NERC or the Regional
Entities should administer their responsibilities—instead, the directives seek to
improve the effectiveness of the ERO and Regional Entity functions and programs by
ensuring they are formalized and reflect how they currently operate. The draft order
provides NERC 90 days from the date of the issuance of the order to submit a
compliance filing on the matters identified and 180 days to file updates to its Rules of
Procedure.
Regarding Item E-21, this draft final rule approves Reliability Standard TPL-001-5
(Transmission System Planning Performance Requirements) as just, reasonable, not

unduly discriminatory or preferential, and in the public interest. As discussed in the
draft final rule, Reliability Standard TPL-001-5 improves upon currently-effective
Reliability Standard TPL-001-4 by addressing (1) the study of single points of failure of
protection systems; and (2) planned maintenance outages and stability analysis for
spare equipment strategies. In addition, the draft final rule declines to pursue other
proposals from the Notice of Proposed Rulemaking, determining that based on
comments of NERC and others that it is reasonable to address single points of failure
in combination with three-phase faults as extreme events without requiring corrective
action plans.
Item E-22 is a draft Final Rule approving Reliability Standard CIP-012-1 (Cyber Security
– Communications between Control Centers), which NERC filed in response to a
Commission directive in Order No. 822. Consistent with the directive, Reliability
Standard CIP-012-1 improves upon the currently-effective CIP Reliability Standards by
supporting situational awareness and reliable bulk electric system operations.
Specifically, Reliability Standard CIP-012-1 requires responsible entities to protect the
confidentiality and integrity of Real-time Assessment and Real-time monitoring data
transmitted between bulk electric system Control Centers. In addition, the draft
Final Rule directs NERC to develop and submit modifications to the Reliability
Standards to require protections regarding the availability of communication links and
data communicated between bulk electric system Control Centers.
Further, the draft Final Rule does not adopt the directive proposed in Order No. 822
for NERC to develop modifications to the CIP Reliability Standards to identify the
types of data that must be protected under Reliability Standard CIP-012-1. The draft
Final Rule finds that the comments filed in response to the Notice of Proposed
Rulemaking convince the Commission further clarification is not necessary.
Item E-24 is a draft Notice of Proposed Rulemaking that proposes to approve the
retirement of 74 of the 77 Reliability Standard requirements that NERC proposed to
retire. The proposed retirements were developed under NERC’s Standards Efficiency
Review Project, which is designed to identify Reliability Standard requirements that
provide little reliability benefit, are administrative in nature, or are redundant with
other Reliability Standards. The draft Notice of Proposed Rulemaking agrees with
NERC that retirement of the 74 Reliability Standards requirements will reduce
duplicative or otherwise unnecessary regulatory burdens. The draft Notice of
Proposed Rulemaking also proposes to remand one requirement submitted for
retirement by NERC, Reliability Standard VAR-001-6 Requirement R2, because it is the

2

only requirement that explicitly requires transmission operators to schedule reactive
resources. In addition, the draft Notice of Proposed Rulemaking seeks additional
information from NERC on two other requirements, proposed for retirement, FAC-0083 Requirements R7 and R8, because these requirements may not completely be
covered by other Reliability Standards and, therefore may not be appropriate for
retirement.
That concludes our presentation. We would be happy to answer any questions.

3


File Typeapplication/pdf
File TitleProgram – July 16, 2009 Commission Meeting
AuthorMAHAL1
File Modified2020-01-23
File Created2020-01-23

© 2024 OMB.report | Privacy Policy