Information Requirements for
Boilers and Industrial Furnaces (Renewal)
Extension without change of a currently approved collection
No
Regular
12/31/2020
Requested
Previously Approved
36 Months From Approved
01/31/2021
900
2,328
39,758
271,137
2,823,120
19,660,605
EPA regulates the burning of hazardous
waste in boilers, incinerators, and industrial furnaces (BIFs)
under 40 CFR parts 63, 264, 265, 266 and 270. This ICR describes
the paperwork requirements that apply to the owners and operators
of BIFs. This includes the general facility requirements at 40 CFR
parts 264 and 265, subparts B thru H; the requirements applicable
to BIF units at 40 CFR part 266; and the RCRA Part B permit
application and modification requirements at 40 CFR part
270.
US Code:
42 USC 6901-6992k Name of Law: Resource Conservation &
Recovery Act (RCRA)
The previously approved ICR
estimated an annual respondent burden of 271,137 hours. This
renewal estimates an annual respondent burden of hours, which is a
decrease of 231,379 hours. The reason for this decrease is a
decrease in the size of the universe, from 105 facilities to 36
facilities. This decrease is due partly to closures of boilers in
both permitted and interim status facilities, but is mostly due to
a clean up of the data, because previously there had been
double-counting of facilities as being both permitted and interim
status. The reason for the double-counting was that one facility
could have both permitted boilers and non-permitted boilers (i.e.,
in interim status). Currently, however, there are no boilers in
interim status; they are either permitted or they have been
closed.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.