NSPS for Onshore Natural Gas Processing Plants (40 CFR part 60, subparts KKK and LLL) (Renewal)

burden tables

OMB: 2060-0120

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1a
Table 1b
Table 2a
Table 2b
Respondents_O&M


Sheet 1: Table 1a

Table 1a: Annual Respondent Burden and Cost - NSPS for Onshore Natural Gas Processing Plants (40 CFR Part 60, Subpart KKK)














Burden Item (A)
Person- hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person- hours per respondent per year (AxB)
(D) Respondents per yeara (E) Technical person- hours per year
(CxD)
(F)
Management person-hours per year (Ex0.05)
(G)
Clerical person-hours per year
(Ex0.1)
(H)
Cost b



1. Applications N/A







Labor Rates
2. Survey and Studies N/A







Managerial $148.45
3. Reporting requirements







Technical $121.46
A. Familiarization with Regulatory Requirements 1 1 1 345 345 17 35 $46,542.40
Clerical $60.23
B. Required activities










Notification of construction/reconstruction c 2 1 2 0 0 0 0 $0


Notification of modification 8 1 8 0 0 0 0 $0


Notification of anticipated startup c 2 1 2 0 0 0 0 $0


Notification of actual startup c 2 1 2 0 0 0 0 $0


Notification of electing to comply with alternative standards for valves c 8 1 8 0 0 0 0 $0


Notification of initial performance test c 2 1 2 0 0 0 0 $0


Affirmative defense 30 1 30 0 0 0 0 $0


Semiannual reports d 8 2 16 345 5,520 276 552 $744,678.36


C. Create Information










Initial performance test c N/A









D. Gather existing information N/A









E. Write report See 3B









Reporting Subtotal



6,745 $791,221


4. Recordkeeping requirements










A. Familiarization with Regulatory Requirements See 4C









B. Plan activities See 4C









C. Implement activities See 3E









Filing and maintaining records e 80 1 80 345 27,600 1380 2,760 $3,723,391.80


Startup, shutdown, or malfunction 80 1 80 0 0 0 0 $0


Recalibrate monitors 4 12 48 345 16,560 828 1,656 $2,234,035.08


Method 21 performance evaluation 2 2 4 345 1,380 69 138 $186,169.59


D. Develop record system See 4C









E. Time to enter information See 4C









F. Train personnel See 4C









G. Audits N/A









Recordkeeping Subtotal



52,371 $6,143,596


Total Labor Burden and Costs (Rounded) f



59,100 $6,930,000


Total Capital and O&M Costs (Rounded) f






$0


Grand Total (Rounded) f



59,100 $6,930,000












93 hrs/response
Assumptions:










a We have assumed that the average number of existing respondents that will be subject to Subpart KKK will be 345. This estimated average accounts for modified facilities after August 2, 2016 subject to Subpart KKK that will become subject to 40 CFR Part 60, Subpart OOOOa and therefore, would no longer report under these rules.


b This ICR uses the following labor rates: $148.45 per hour for Executive, Administrative, and Managerial labor; $121.46 per hour for Technical labor, and $60.23 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, March 2020, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


c New respondents will be subject to 40 CFR Part 60, Subpart OOOOa.


d We have assumed that each existing respondent will take 8 hours, two times per year to write semiannual reports.


e We have assumed that each existing respondent will take 80 hours to file and maintain records.


f Totals are rounded to three significant figures. Figures may not add exactly due to rounding.



Sheet 2: Table 1b

Table 1b: Annual Respondent Burden and Cost - NSPS for Onshore Natural Gas Processing Plants (40 CFR Part 60, Subpart LLL)














Burden Item (A)
Person- hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person- hours per respondent per year (AxB)
(D) Respondents per yeara (E)
Technical person- hours per year
(CxD)
(F) Management person-hours per year
(Ex0.05)
(G)
Clerical person-hours per year
(Ex0.1)
(H)
Cost b



1. Applications N/A







Labor Rates
2. Survey and Studies N/A







Managerial $148.45
3. Reporting requirements







Technical $121.46
A. Familiarization with Regulatory Requirements 1 1 1 17 17 0.9 1.7 $2,293.39
Clerical $60.23
B. Required activities










Initial performance test c 60 1 60 0 0 0 0 $0


Repeat performance test 60 0.2 12 0 0 0 0 $0


Demonstration of CEMS 80 0.2 16 0 0 0 0 $0


Repeat Demonstration of CEMS 80 0.2 16 0 0 0 0 $0


C. Create Information See 3B









D. Gather existing information See 3B









E. Write report










Notification of construction/reconstruction c 2 1 2 0 0 0 0 $0


Notification of modification c 2 1 2 0 0 0 0 $0


Notification of anticipated startup c 2 1 2 0 0 0 0 $0


Notification of actual startup c 2 1 2 0 0 0 0 $0


Notification of initial performance test c 2 1 2 0 0 0 0 $0


Notification of CMS demonstration c 2 1 2 0 0 0 0 $0


CMS demonstration See 3B









Semiannual report d 40 2 80 17 1,360 68 136 $183,471.48


Reporting Subtotal



1,584 $185,765


4. Recordkeeping requirements










A. Familiarization with Regulatory Requirements See 3A









B. Plan activities N/A









C. Implement activities N/A









D. Develop record system e 40 1 40 0 0 0 0 $0


E. Time to enter information










Records of startup, shutdown, or malfunction 1.5 12 18 0 0 0 0 $0


Records of continuous recording 0.5 700 350 17 5,950 298 595 $802,687.73


Records of capacity data 2 1 2 3 6 0.3 0.6 $809.43


F. Train personnel N/A









G. Audits N/A









Recordkeeping Subtotal



6,849 $803,497


Total Labor Burden and Costs (Rounded) f



8,430 $989,000


Total Capital and O&M Costs (Rounded) f






$68,400


Grand Total (Rounded) f



8,430 $1,060,000














Assumptions:










a We have assumed that the average number of existing respondents that will be subject to subpart LLL will be 17. This estimated average accounts for modified facilities after August 2, 2016 subject to Subpart LLL that will become subject to 40 CFR Part 60, Subpart OOOOa and therefore, would no longer report under these rules.


b This ICR uses the following labor rates: $148.45 per hour for Executive, Administrative, and Managerial labor; $121.46 per hour for Technical labor, and $60.23 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, March 2020, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


c New respondents will be subject to 40 CFR Part 60, Subpart OOOOa.


d We have assumed that each existing respondent will take 40 hours, two times per year to write semiannual reports.


e We have assumed that each existing respondent will take 40 hours to develop record system. New respondents will be subject to 40 CFR Part 60, Subpart OOOOa recordkeeping requirements. However, Subpart LLL sources that have modified would need to track capacity data during the year it modified.


f Totals are rounded to three significant figures. Figures may not add exactly due to rounding.



Sheet 3: Table 2a

Table 2a: Average Annual EPA Burden and Cost - NSPS for Onshore Natural Gas Production (40 CFR Part 60, Subpart KKK) (Renewal)






















Activity (A)
EPA person- hours per occurrence
(B)
No. of occurrences per plant per year
(C)
EPA person- hours per plant per year
(AxB)
(D)
Plants per year a
(E)
Technical person- hours per year
(CxD)
(F)
Management person-hours per year
(Ex0.05)
(G)
Clerical person-hours per year
(Ex0.1)
(H)
Cost b



Notification of construction/reconstruction c 2 1 2 0 0 0 0 $0
Labor Rates
Review notification of modification c 2 1 2 0 0 0 0 $0
Managerial $68.37
Review notification of anticipated startup c 2 1 2 0 0 0 0 $0
Technical $50.72
Review notification of actual startup c 2 1 2 0 0 0 0 $0
Clerical $27.46
Notification of demonstration of CEMS c 2 1 2 0 0 0 0 $0


Review initial CEMS demonstration report c 2 1 2 0 0 0 0 $0


Review notification of performance test c 2 1 2 0 0 0 0 $0


Review results of performance test c 2 1 2 0 0 0 0 $0


Review semiannual reports d 8 2 16 345 5,520 276 552 $314,002.44


TOTAL (Rounded) e



6,350 $314,000














Assumptions:










a We have assumed that the average number of existing respondents that will be subject to Subpart KKK will be 345. This estimated average accounts for modified facilities after August 2, 2016 subject to Subpart KKK will become subject to 40 CFR Part 60, Subpart OOOOa and therefore, would no longer report under these rules.


b The cost is based on the following labor rate which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses. Managerial rates of $68.37 (GS-13, Step 5, $42.73 × 1.6), Technical rate of $50.72 (GS-12, Step 1, $31.70 × 1.6), and Clerical rate of $27.46 (GS-6, Step 3, $17.16 × 1.6). These rates are from the Office of Personnel Management (OPM), 2020 General Schedule, which excludes locality, rates of pay.


c New respondents will become subject to 40 CFR Part 60, Subpart OOOOa.


d We have assumed that it will take each existing respondent eight hours, two times per year to review semiannual reports.


e Totals are rounded to three significant figures. Figures may not add exactly due to rounding.



Sheet 4: Table 2b

Table 2b: Average Annual EPA Burden and Cost - NSPS for Onshore Natural Gas Processing Plants (40 CFR Part 60, Subpart LLL) (Renewal)














Activity (A)
EPA person- hours per occurrence
(B)
No. of occurrences per plant per year
(C)
EPA person- hours per plant per year
(AxB)
(D)
Plants per year a
(E)
Technical person- hours per year
(CxD)
(F)
Management person-hours per year
(Ex0.05)
(G)
Clerical person-hours per year
(Ex0.1)
(H)
Cost b



Review notification of construction/reconstruction c 2 1 2 0 0 0 0 $0
Labor Rates
Review notification of modification c 2 1 2 0 0 0 0 $0
Managerial $68.37
Review notification of anticipated startup c 2 1 2 0 0 0 0 $0
Technical $50.72
Review notification of actual startup c 2 1 2 0 0 0 0 $0
Clerical $27.46
Review notification of demonstration of CEMS c 2 1 2 0 0 0 0 $0


Review of CEMS demonstration report c 2 1 2 0 0 0 0 $0


Review notification of initial performance test c 2 1 2 0 0 0 0 $0


Review of semiannual reports d 8 2 16 17 272 14 27 $15,472.58


Review results of performance test c 2 1 2 0 0 0 0 $0


TOTAL (Rounded) e



313 $15,500














Assumptions:










a We have assumed that the average number of existing respondents that will be subject to Subpart LLL will be 17. This estimated average accounts for modified facilities after August 2, 2016 subject to Subpart LLL will become subject to 40 CFR Part 60, Subpart OOOOa and therefore, would no longer report under these rules.


b The cost is based on the following labor rate which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses. Managerial rates of $68.37 (GS-13, Step 5, $42.73 × 1.6), Technical rate of $50.72 (GS-12, Step 1, $31.70 × 1.6), and Clerical rate of $27.46 (GS-6, Step 3, $17.16 × 1.6). These rates are from the Office of Personnel Management (OPM), 2020 General Schedule, which excludes locality, rates of pay.


c New respondents will become subject to 40 CFR Part 60, Subpart OOOOa.


d We have assumed that it will take each existing respondent eight hours, two times per year to review semiannual reports.


e Totals are rounded to three significant figures. Figures may not add exactly due to rounding.



Sheet 5: Respondents_O&M




Capital/Startup vs. Operation and Maintenance (O&M) Costs





Number of Respondents

(A) (B) (C) (D) (E) (F) (G)






Respondents That Submit Reports Respondents That Do Not Submit Any Reports



Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost,
(B X C)
Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M,
(E X F)






Year (A)
Number of Existing Respondents that would now report under Subpart OOOOa a
(B)
Number of Existing Respondents
(C)
Number of Existing Respondents that keep records but do not submit reports
(D)
Number of Existing Respondents That Are Also New Respondents
(E)
Number of Respondents
(E= B+C-A-D)


SO2 CEM, control outlet (only for subpart LLL) $73,000 0 $0 $17,100 4 $68,400





Subpart KKK

Assumptions:











1 27 399 0 0 372

a Costs reflect installation and maintenance of an in-situ SO2 CEM after the control device and assume installation occurred during the construction of the facility.





2 27 372 0 0 345

b We expect 4 existing facilities to have annual O&M costs for monitoring under subpart LLL.





3 27 345 0 0 318














Average 27 372 0 0 345









Total Annual Responses
Subpart LLL b









(A) (B) (C) (D) (E)
1 3 20 3 0 20









Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses
E=(BxC)+D
2 3 17 3 0 17









Subpart KKK
3 3 14 3 0 14









Semiannual reports 345 2 N/A 690
Average 3 17 3 0 17









Subtotal for Subpart KKK


690
Total c



362









Subpart LLL
















Semiannual report 17 2 N/A 34
Assumptions:









Subtotal for Subpart LLL


34
a We expect 27 of the existing facilities subject to Subpart KKK to undergo modifications in each year, which would indicate these facilities would report under Subpart OOOOa and no longer report under Subpart KKK. For Subpart LLL, we expect three facilities to perform a modification and report under Subpart OOOOa.









TOTAL


724
b Affected facilities with design capacities of less than two long tons per day (LT/D) of hydrogen sulfide (H2S) in the acid gas, expressed as sulfur, have no reporting requirements pursuant to Subpart LLL. Three respondents have sources capacities below this threshold.














c This is the total average of existing respondents subject to both Subparts KKK and LLL.

























































Summary




















Hours Labor $ Capital $ Total $















Table 1a 59,100 $6,930,000 0 $6,930,000















Table 1b 8,430 $989,000 68400 $1,060,000















Total 67,530 $7,919,000 68,400 $7,990,000















Table 2a 6,350 $314,000 0 $314,000















Table 2b 313 $15,500 0 $15,500















Total 6,663 $330,000 0 $330,000