Document
Biannual Report of PTC System Performance
ICR 202012-2130-003 · OMB 2130-0553 · Object 107313901.
This document may belong to an older filing. More recent activity for OMB 2130-0553:
Document Viewer [xlsx]
Document Metadata
| File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
|---|---|
| File Title | Biannual Report of PTC System Performance |
| Author | Pelczar, Zachary |
| Last Modified By | Calc |
| File Modified | 2020-12-18 |
| File Created | 2026-08-13 |
| Conversion State | complete |
Extracted Text
[Proposed] Form FRA F 6180.152 OMB Control No. 2130-0553 Biannual Report of Positive Train Control (PTC) System Performance Public reporting burden for this information collection is estimated to average 12 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. According to the Paperwork Reduction Act of 1995, a federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply with, a collection of information unless it displays a currently valid OMB control number. The valid OMB control number for this information collection is 2130-0553. All responses to this collection of information are mandatory. Send comments regarding this burden estimate or any other aspect of this collection, including suggestions for reducing this burden, to FRA's Information Collection Clearance Officer via e-mail ([email protected]) or telephone (202-493-0440). In any comments, please reference OMB Control No. 2130-0553, Docket No. FRA-2019-0075, and Regulation Identifier No. 2130-AC75. OMB Approval Granted XX/XX/XXXX OMB Approval Expires XX/XX/XXXX Form Instructions for the Biannual Report of PTC System Performance (Form FRA F See 49 CFR § 236.1029(h) for the complete list of regulatory requirements for railroads' Biannual Reports of PTC System Pe Reporting Deadlines Under 49 CFR § 236.1029(h) - Host Railroads: Each host railroad subject to 49 U.S.C. § 20157 or 49 CFR part 236, subpart I, shall electronically submit a 6180.152) to FRA by the following due dates: July 31 (covering the period from January 1 to June 30), and January 31 (cov calendar year). See 49 CFR § 236.1029(h)(3). - Tenant Railroads: Each tenant railroad that operates on a host railroad’s PTC-governed main line(s), unless the tenant ra 236.1006(b)(4) or (5), shall submit the information required under 49 CFR § 236.1029(h)(1) and (2) to each applicable host January 1 to June 30) and by January 15 (for the report covering the period from July 1 to December 31 of the prior calend General Instructions 1. There are three (3) sheets in this Excel file that must be populated with data for a valid submission: Form Information, D 2. Railroad names should be consistently referenced throughout this form. 3. The data in sheets "Data (1 of 2)" and "Data (2 of 2)" should correspond with each other. For example, if PTC-governed enforcements during the reporting period on "Segment1" and "Segment2," those events should be reported in "Data (1 of of 2)." See the sheets labeled "Sample Data" in this Excel file for an example of a proper submission. Form Information Instructions Reporting Railroad Name: Reporting Period: Confidentiality Requested, If Any: Data (1 of 2) Instructions This sheet contains the required performance-related data. RailroadName TrackSegment SubsystemOrComponent EventTypeCode TotalEvents Data (2 of 2) Instructions This sheet contains operational data to normalize the frequency of performance-related events and help determine the ra RailroadName TrackSegment TotalScheduledInitializations TotalTrainsOperated TotalTrainMiles Submission Instructions When finished updating the Excel file with the data associated with the reporting period, save the file. Submit the completed, saved Excel file electronically to FRA, via FRA's Secure Information Repository (https://sir.fra.dot.go [Proposed] Form FRA F 6180.152 OMB Control No. 2130-0553 r the Biannual Report of PTC System Performance (Form FRA F 6180.152) he complete list of regulatory requirements for railroads' Biannual Reports of PTC System Performance (Form FRA F 6180.152). 9 CFR § 236.1029(h) ilroad subject to 49 U.S.C. § 20157 or 49 CFR part 236, subpart I, shall electronically submit a Biannual Report of PTC System Performance wing due dates: July 31 (covering the period from January 1 to June 30), and January 31 (covering the period from July 1 to December 31 o 36.1029(h)(3). nt railroad that operates on a host railroad’s PTC-governed main line(s), unless the tenant railroad is currently subject to an exception und bmit the information required under 49 CFR § 236.1029(h)(1) and (2) to each applicable host railroad by July 15 (for the report covering th anuary 15 (for the report covering the period from July 1 to December 31 of the prior calendar year). See 49 CFR § 236.1029 n this Excel file that must be populated with data for a valid submission: Form Information, Data (1 of 2), and Data (2 of 2). onsistently referenced throughout this form. of 2)" and "Data (2 of 2)" should correspond with each other. For example, if PTC-governed "Tenant1" experienced PTC-related failures or rting period on "Segment1" and "Segment2," those events should be reported in "Data (1 of 2)," and the scale of operations should be rep "Sample Data" in this Excel file for an example of a proper submission. s Enter the name of the host railroad submitting this form. Select the applicable reporting period from the dropdown menu. Indicate here if the reporting railroad requests partial or full confidentiality of the form data under 49 CFR § 209.11, or write "N ed performance-related data. Enter the railroad name for each event. This list should include the host railroad and any tenant railroad that experienced any related events (including initialization failures, cut outs, malfunctions, and intended enforcements) during the reporting period Enter the PTC-governed track segment (e.g., territory, subdivision, district, main line, branch, or corridor), as it appears in the r Implementation Plan. Use the following values to identify the sources or causes of the initialization failures, cut outs, and malfunctions: - Locomotive Subsystem - Wayside Subsystem - Communications Subsystem - Back Office Subsystem - Non-PTC Component Use the following codes to represent the types of performance-related events that occurred during the reporting period: I = Initialization Failures C = Cut Outs M = Malfunctions E = Intended enforcements by the PTC system and any other instances in which the PTC system prevented an accident or incid Enter the total number of each type of performance-related event that occurred during the reporting period, separated by rail segment. al data to normalize the frequency of performance-related events and help determine the rate at which they occur. This list shall include the host railroad and any tenant railroad that experienced a performance-related event during the repor Enter the PTC-governed track segments (e.g., territory, subdivision, district, main line, branch, or corridor), as it appears in the Implementation Plan. Enter the total number of scheduled attempts at PTC system initialization during the reporting period for each host railroad an railroad, separated by track segment. Enter the total number of PTC-governed trains operated during the reporting period for each host railroad and tenant railroad track segment. Enter the total number of PTC-governed train miles during the reporting period for each host railroad and tenant railroad, sep segment xcel file with the data associated with the reporting period, save the file. Excel file electronically to FRA, via FRA's Secure Information Repository (https://sir.fra.dot.gov) or another designated location. Reporting Railroad Name: Reporting Period: Confidentiality Requested, If Any: Provide a statement justifying the request for nondisclosure and referring to the specific legal authority claimed*: Summary of any actions the host railroad and its tenant railroads are taking to continually improve the performance and reliability of the PTC system: *If a railroad requests partial or full confidentiality of this form, the railroad must also satisfy the other requiremen the requirements under § 209.11(d) regarding labeling, redactions, and multiple versions, if applicable. [Proposed] Form FRA F 6180.152 OMB Control No. 2130-0553 or full confidentiality of this form, the railroad must also satisfy the other requirements under 49 CFR § 209.11, including .11(d) regarding labeling, redactions, and multiple versions, if applicable. RailroadName TrackSegment SubsystemOrComponent EventTypeCode TotalEvents RailroadName TrackSegment TotalScheduledInitializations TotalTrainsOperated TotalTrainMiles EventType I Label Initialization Failure C Cut Out M Malfunction E Intended Enforcement Description Any instance when a PTC system fails to activate on a locomotive or train, unless the PTC system successfully activates during a subsequent attempt in the same location or before entering PTC territory. For the types of PTC systems that do not initialize by design, a failed departure test is considered an initialization failure for purposes of the reporting requirement under § 236.1029(h), unless the PTC system successfully passes the departure test during a subsequent attempt in the same location or before entering PTC territory. Any disabling of a PTC system, subsystem, or component en route, including when the PTC system cuts out on its own or a person cuts out the system, unless the cut out was necessary to exit PTC-governed territory and enter non-PTC territory. Any instance when a PTC system, subsystem, or component fails to perform the functions mandated under 49 U.S.C. 20157(i)(5), 49 CFR part 236, subpart I, or the applicable host railroad’s PTC Safety Plan. Any intended enforcements by the PTC system and any other instances in which the PTC system prevented an accident or incident. RailroadName Host1 Host1 Host1 Host1 Host1 Host1 Host1 Host1 Host1 Host1 Host1 Tenant1 Tenant1 Tenant1 Tenant1 Tenant2 Tenant2 Tenant2 TrackSegment Segment1 Segment1 Segment1 Segment1 Segment1 Segment1 Segment1 Segment2 Segment2 Segment2 Segment2 Segment1 Segment1 Segment2 Segment2 Segment1 Segment1 Segment1 SubsystemOrComponent Locomotive Subsystem Locomotive Subsystem N/A - Intended Enforcement Communications Subsystem Wayside Subsystem Back Office Subsystem Non-PTC Component Locomotive Subsystem Communications Subsystem Communications Subsystem Non-PTC Component Locomotive Subsystem Back Office Subsystem Locomotive Subsystem N/A - Intended Enforcement Locomotive Subsystem Back Office Subsystem Non-PTC Component EventTypeCode I C E M M C C M I M I I C I E I C M TotalEvents 20 15 4 42 12 4 2 12 45 37 4 18 15 3 4 6 3 10 RailroadName Host1 Host1 Tenant1 Tenant1 Tenant2 TrackSegment Segment1 Segment2 Segment1 Segment2 Segment1 TotalScheduledInitializations TotalTrainsOperated TotalTrainMiles 15000 7040 800100 14000 6800 720200 1000 750 50000 800 600 45000 500 350 15000