30-day notice (published)

FERC-725S 30-day notice (published).pdf

FERC-725S Mandatory Reliability Standards: Emergency Preparedness and Operations (EOP) Reliability Standards

30-day notice (published)

OMB: 1902-0270

Document [pdf]
Download: pdf | pdf
Federal Register / Vol. 86, No. 16 / Wednesday, January 27, 2021 / Notices
l. With this notice, we are designating
Northern States as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act,
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. Northern States filed a PreApplication Document (PAD); including
a proposed process plan and schedule
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website (http://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support at
[email protected], (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No 2417.
Pursuant to 18 CFR 16.20, each
application for a subsequent license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by November 30, 2023.
p. Register online at http://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: January 21, 2021.
Kimberly D. Bose,
Secretary.

Applicants: Columbia Gas of
Maryland, Inc.
Description: Tariff filing per
284.123(b),(e)/: CMD Tariff Rates Jan 1
2021 to be effective 1/1/2021.
Filed Date: 1/19/2021.
Accession Number: 20210119–5060.
Comments/Protests Due: 5 p.m. ET 2/
9/2021.
Docket Numbers: RP21–391–000.
Applicants: Stagecoach Pipeline &
Storage Company LLC.
Description: § 4(d) Rate Filing:
Stagecoach Pipeline & Storage Company
LLC—Filing of Negotiated Rate
Amendment to be effective 12/1/2020.
Filed Date: 1/19/21.
Accession Number: 20210119–5000.
Comments Due: 5 p.m. ET 2/1/21.
Docket Numbers: RP21–392–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing: DPEs—
PSNC (SET) to be effective 2/19/2021.
Filed Date: 1/19/21.
Accession Number: 20210119–5010.
Comments Due: 5 p.m. ET 2/1/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 21, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–01758 Filed 1–26–21; 8:45 am]

[FR Doc. 2021–01778 Filed 1–26–21; 8:45 am]

BILLING CODE 6717–01–P

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

khammond on DSKJM1Z7X2PROD with NOTICES

DEPARTMENT OF ENERGY

Federal Energy Regulatory
Commission

Federal Energy Regulatory
Commission

[Docket No. IC21–6–000]

Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: PR21–17–000.

VerDate Sep<11>2014

17:04 Jan 26, 2021

Jkt 253001

Commission Information Collection
Activities (FERC–725S); Comment
Request; Extension
Federal Energy Regulatory
Commission.

AGENCY:

PO 00000

Frm 00047

Fmt 4703

Sfmt 4703

7289

Notice of information collection
and request for comments.

ACTION:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection FERC–
725S (Emergency Preparedness and
Operations (EOP) Reliability Standards)
and submitting the information
collection to the Office of Management
and Budget (OMB) for review. Any
interested person may file comments
directly with OMB and should address
a copy of those comments to the
Commission as explained below.
DATES: Comments on the collection of
information are due February 26, 2021.
ADDRESSES: You may submit comments
(identified by Docket No. IC21–6–000)
by one of the following methods:
• eFiling at Commission’s Website:
http://www.ferc.gov.
• U.S. Postal Service Mail: Persons
unable to file electronically may mail
similar pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
• Effective 7/1/2020, delivery of
filings other than by eFiling or the U.S.
Postal Service should be delivered to
Federal Energy Regulatory Commission,
Office of the Secretary, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov. For user assistance,
contact FERC Online Support by email
at [email protected], or by
phone at (866) 208–3676 (toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], telephone
at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
Title: FERC–725S, Emergency
Preparedness and Operations (EOP)
Reliability Standards.
OMB Control No.: 1902–0270.
Type of Request: Three-year approval
of the FERC–725S information
collection requirements with no changes
to the current reporting requirements.
Abstract: The Electricity
Modernization Act of 2005, which is
Title XII of the Energy Policy Act of
2005 (EPAct 2005), added a new section
SUMMARY:

E:\FR\FM\27JAN1.SGM

27JAN1

7290

Federal Register / Vol. 86, No. 16 / Wednesday, January 27, 2021 / Notices

215 to the Federal Power Act (FPA).1
FPA section 215 requires a Commissioncertified Electric Reliability
Organization (ERO) to develop
mandatory and enforceable Reliability
Standards, subject to Commission
review and approval. Section 215 of the
FPA requires a Commission-certified
ERO to develop mandatory and
enforceable Reliability Standards,
subject to Commission review and
approval. In 2006, the Commission
certified North American Electric
Reliability Corporation (NERC) as the
ERO pursuant to section 215 of the FPA.
FERC–725S consists of Emergency
Preparedness and Operations (EOP)
Reliability Standards, EOP–004–4
(Event Reporting), EOP–005–3 (System
Restoration from Blackstart Resources),
EOP–006–3 (System Restoration
Coordination), EOP–008–2 (Loss of
Control Center Functionality), EOP–
010–1 (Geomagnetic Disturbance
Operations), and EOP–011–1
(Emergency Operations). These

Reliability Standards enhance reliability
by:
(1) Providing accurate reporting of
events to NERC’s event analysis group
to analyze the impact on the reliability
of the bulk electric system (Reliability
Standard EOP–004–4).
(2) delineating the roles and
responsibilities of entities that support
system restoration from blackstart
resources which generate power without
the support of the bulk electric system
(Reliability Standard EOP–005–3).
(3) clarifying the procedures and
coordination requirements for reliability
coordinator personnel to execute system
restoration processes (Reliability
Standard EOP–006–3).
(4) refining the required elements of
an operating plan used to continue
reliable operations of the bulk electric
system in the event that primary control
center functionality is lost (Reliability
Standard EOP–008–2).
(5) addressing the effects of operating
Emergencies by ensuring each
Transmission Operator and Balancing
Authority has developed Operating

Plan(s) to mitigate operating
Emergencies, and that those plans are
coordinated within a Reliability
Coordinator Area (EOP–010–1).
(6) streamlining the requirements for
Emergency operations of the Bulk
Electric System. Attachment 1, which is
incorporated into Requirements R2 and
R6, provides the process and
descriptions of the levels used by the
Reliability Coordinator when
communicating the condition of a
Balancing Authority that is experiencing
an Energy Emergency (EOP–011–1).
The 60-day notice was published on
November 18, 2020 (85 FR 73477), and
no comments were received.
Type of Respondents: Public utilities
subject to the FPA.
Estimate of Annual Burden 2 and
cost: 3 With the exception of
adjustments due to the Commission’s
recent experience with this information
collection, the Commission estimates
there will be no changes in the annual
public reporting burden for the FERC–
735S, as follows:

FERC–725S
Reliability standard and associated requirement

Number of
respondents 4

Annual
number of
responses per
respondent

Total number
of responses

Average burden &
cost per response

Total annual burden
& total annual cost

Cost per
respondent
($)

(1)

(2)

(1) * (2) = (3)

(4)

(3) * (4) = (5)

(5) ÷ (1)

EOP–010–1 .............................

181

1

181

EOP–011–1 .............................

12

1

12

280

1

280

473

........................

........................

EOP–004–4, EOP–005–3,
EOP–006–3, EOP–008–2.

khammond on DSKJM1Z7X2PROD with NOTICES

Total EOP ........................

Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
1 16 U.S.C. 824o. The approved Reliability
Standards are available on the Commission’s
eLibrary document retrieval system on the NERC
website, www.nerc.com.
2 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide

VerDate Sep<11>2014

17:04 Jan 26, 2021

Jkt 253001

20 hrs.; $1,660 ......
1,500 hrs.;
$124,500.
250.58 hrs.;
$20,798.
................................

of automated collection techniques or
other forms of information technology.
Dated: January 21, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.

3,620 hrs.;
$300,460.
18,000 hrs.;
$1,494,000.
70,162.4 hrs.;
$5,234,440.
91,782 hrs.;
$7,028,900.

$1,660
124,500
20,798
........................

FEDERAL COMMUNICATIONS
COMMISSION
[OMB 3060–0645; FRS 17379]

[FR Doc. 2021–01756 Filed 1–26–21; 8:45 am]
BILLING CODE 6717–01–P

Information Collection Being Reviewed
by the Federal Communications
Commission
Federal Communications
Commission.
ACTION: Notice and request for
comments.
AGENCY:

As part of its continuing effort
to reduce paperwork burdens, and as

SUMMARY:

information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, refer to 5 Code of Federal
Regulations 1320.3.
3 Commission staff estimates that the industry’s
skill set and cost (for wages and benefits) for FERC–
725S are approximately the same as the

PO 00000

Frm 00048

Fmt 4703

Sfmt 4703

Commission’s average cost. The FERC 2020 average
salary plus benefits for one FERC full-time
equivalent (FTE) is $172,329/year (or $83.00/hour).
4 The number of respondents is based on NERC
compliance registration information as of October 2,
2020.

E:\FR\FM\27JAN1.SGM

27JAN1


File Typeapplication/pdf
File Modified2021-01-26
File Created2021-01-27

© 2024 OMB.report | Privacy Policy