18 Cfr 4.70

18 CFR 4.70.docx

FERC-500, (Proposed Rule in RM20-21-000) Application for License/Relicense for Water Projects with More than 10 Megawatt (MW) Capacity

18 CFR 4.70

OMB: 1902-0058

Document [docx]
Download: docx | pdf

Electronic Code of Federal Regulations (eCFR) Page 1 of 1

ELECTRONIC CODE OF FEDERAL REGULATIONS

e-CFR data is current as of May 19, 2021

Title 18Chapter ISubchapter BPart 4Subpart H → §4.70

Title 18: Conservation of Power and Water Resources

PART 4—LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF

PROJECT COSTS

Subpart H—Application for License for Transmission Line Only

Shape1

§4.70 Applicability.

This subpart applies to any application for license issued solely for a transmission line that transmits power from a licensed water power project to the point of junction with the distribution system or with the interconnected primary transmission system.

[Order 184, 46 FR 55942, Nov. 13, 1981, as amended by Order 2002, 68 FR 51120, Aug.

25, 2003; 68 FR 61742, Oct. 30, 2003] Need assistance?

https://www.ecfr.gov/cgi-bin/text-idx?SID=af806083b65205d2aeaa18ae475d429a&mc=tr... 5/21/2021

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File Titlehttps://www.ecfr.gov/cgi-bin/text-idx?SID=af806083b65205d2aeaa1
Authorjnsed34
File Modified0000-00-00
File Created2021-06-16

© 2024 OMB.report | Privacy Policy