60-day Notice (published)

FERC-512 60-day Notice (published).pdf

FERC-512, Preliminary Permit

60-day Notice (published)

OMB: 1902-0073

Document [pdf]
Download: pdf | pdf
jbell on DSKJLSW7X2PROD with NOTICES

Federal Register / Vol. 86, No. 6 / Monday, January 11, 2021 / Notices
Filed Date: 1/5/21.
Accession Number: 20210105–5014.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–802–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Evergy Companies Name Changes—
Westar Energy Formula Rate to be
effective 4/1/2021.
Filed Date: 1/5/21.
Accession Number: 20210105–5015.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–803–000.
Applicants: Springfield Power, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession filing to be
effective 1/16/2019.
Filed Date: 1/5/21.
Accession Number: 20210105–5017.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–804–000.
Applicants: DG Whitefield LLC.
Description: § 205(d) Rate Filing:
Notice of Succession filing to be
effective 1/6/2021.
Filed Date: 1/5/21.
Accession Number: 20210105–5018.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–805–000.
Applicants: Black Hills Power, Inc.
Description: § 205(d) Rate Filing:
BHP—BH Wyoming GDEMA Revised
Schedule B to be effective 3/7/2021.
Filed Date: 1/5/21.
Accession Number: 20210105–5029.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–806–000.
Applicants: Black Hills Power, Inc.
Description: § 205(d) Rate Filing:
BHP—BHCE GDEMA Revised Schedule
B to be effective 3/7/2021.
Filed Date: 1/5/21.
Accession Number: 20210105–5030.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–807–000.
Applicants: Black Hills Power, Inc.
Description: § 205(d) Rate Filing:
BHP—CLFP GDEMA Revised Schedule
B to be effective 3/7/2021.
Filed Date: 1/5/21.
Accession Number: 20210105–5031.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–808–000.
Applicants: Black Hills Power, Inc.
Description: § 205(d) Rate Filing:
BHP—Gillette GDEMA Revised
Schedule B to be effective 3/7/2021.
Filed Date: 1/5/21.
Accession Number: 20210105–5032.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–809–000.
Applicants: Black Hills Power, Inc.
Description: § 205(d) Rate Filing:
BHP—MDU GDEMA Revised Schedule
B to be effective 3/7/2021.
Filed Date: 1/5/21.

VerDate Sep<11>2014

22:36 Jan 08, 2021

Jkt 253001

Accession Number: 20210105–5033.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–810–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–01–05_SA 3289 Termination of
Sugar River Wind—ATC GIA (J584) to
be effective 12/28/2020.
Filed Date: 1/5/21.
Accession Number: 20210105–5035.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–811–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–01–05_SA 3362 Termination of
ATC-Quilt Block Wind Farm II GIA
(J807) to be effective 8/24/2020.
Filed Date: 1/5/21.
Accession Number: 20210105–5036.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–812–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–01–05_SA 3496 Termination of
ATC-Shullsburg Wind Farm GIA (J819)
to be effective 8/24/2020.
Filed Date: 1/5/21.
Accession Number: 20210105–5037.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–813–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–01–05_SA 3363 Termination of
ATC-Marathon Wind Farm GIA (J821) to
be effective 8/24/2020.
Filed Date: 1/5/21.
Accession Number: 20210105–5038.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–814–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–01–05_SA 3106 Termination of
Dodge County Wind-SMMPA Substitute
GIA (J441) to be effective 12/26/2019.
Filed Date: 1/5/21.
Accession Number: 20210105–5039.
Comments Due: 5 p.m. ET 1/26/21.
Docket Numbers: ER21–815–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Filing of Service Agreement No. 726 to
be effective 12/30/2020.
Filed Date: 1/5/21.
Accession Number: 20210105–5040.
Comments Due: 5 p.m. ET 1/26/21.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES21–21–000;
ES21–22–000; ES21–23–000; ES21–24–
000.

PO 00000

Frm 00041

Fmt 4703

Sfmt 4703

1957

Applicants: Transource Maryland,
LLC, Transource Missouri, LLC,
Transource Pennsylvania, LLC,
Transource West Virginia, LLC.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities for
Transource Maryland, LLC, et al.
Filed Date: 1/4/21.
Accession Number: 20210104–5299.
Comments Due: 5 p.m. ET 1/25/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 5, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021–00260 Filed 1–8–21; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC21–8–000]

Commission Information Collection
Activities (FERC–512); Comment
Request; Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on a renewal of
currently approved information
collection, FERC–512 (Preliminary
Permit).

SUMMARY:

Comments on the collection of
information are due March 12, 2021.

DATES:

E:\FR\FM\11JAN1.SGM

11JAN1

1958

Federal Register / Vol. 86, No. 6 / Monday, January 11, 2021 / Notices

You may submit comments
(identified by Docket No. IC21–8–000)
by one of the following methods:
• eFiling at Commission’s Website:
http://www.ferc.gov.
• U.S. Postal Service Mail: Persons
unable to file electronically may mail
similar pleadings to the Federal Energy
Regulatory Commission, Office of the
Secretary, 888 First Street NE,
Washington, DC 20426.
• Delivery of filings other than by
eFiling or the U.S. Postal Service should
be delivered to Federal Energy
Regulatory Commission, Office of the
Secretary, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov. For user assistance,
contact FERC Online Support by email
at [email protected], or by
phone at (866) 208–3676 (toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], telephone
at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
Title: FERC–512, Preliminary Permit.
OMB Control No.: 1902–0073.
ADDRESSES:

Type of Request: Three-year approval
of the FERC–512 information collection
requirements, with no changes to the
current reporting requirements.
Abstract: The Commission regulates
nonfederal hydropower projects on
navigable waters and federal lands
pursuant to the Federal Power Act
(FPA).1 The FERC–512 is an application
for a preliminary permit or to extend a
preliminary permit term. Preliminary
permits, issued for up to four years,
preserve the right of permit holders to
have first priority in applying for a
license for a project being studied, but
do not authorize construction of any
facilities. Nor does a preliminary permit
allow the use of eminent domain to
acquire lands for the project. The
preliminary permits are issued pursuant
to sections 4(f), 5, and 7 of the FPA.
Preliminary permits may be extended
one time for up to four additional years,
pursuant to section 5 of the FPA. The
purpose of obtaining a preliminary
permit is to maintain priority status for
an application for a license while the
applicant conducts site examinations
and surveys to prepare maps, plans,
specifications, and estimates. This
period of time also provides the
applicant with the opportunity to
conduct engineering, economic, and
environmental feasibility studies in
addition to making the financial
arrangements for funding the

construction of the project. No other
application for a preliminary permit or
application for license submitted by
another party can be accepted during
the permit term. The application for a
preliminary permit is used by
Commission staff to assess the scope of
the proposed project, the technology to
be used, and jurisdictional aspects of
the project. The staff assessment
includes a review of the proposed hydro
development for conflicts with other
permits or existing projects and public
notice of the application to solicit
public and agency comments. The
application for a one-time extension, up
to four years, of a preliminary permit is
used by Commission staff to determine
if a permittee has met the 2018 Water
Infrastructure Act’s good faith and
reasonable diligence standard. An
application for a preliminary permit
includes an initial statement and three
numbered exhibits, per 18 CFR 4.81.
The initial statement includes
information on the applicant, the
project, the requested term of the
permit, affected political jurisdictions,
and a verification of the facts.
Type of Respondents: Business or
other for-profit and not for-profit
institutions.
Estimate of Annual Burden 2and
Cost: 3 The Commission estimates as
shown below in the table:

jbell on DSKJLSW7X2PROD with NOTICES

FERC–512—(PRELIMINARY PERMIT)
Number of
respondents

Annual
number of
responses per
respondent

Total number
of responses

Average burden
hours & cost per
response

Total annual
burden hours &
total annual cost

Average
annual cost
per
respondent

(1)

(2)

(1)*(2)=(3)

(4)

(3)*(4)=(5)

(5)÷(1)

Annual Reporting and Recordkeeping

50

1

50

24 hrs.; $1,992

1,200 hrs.;
$99,600.

$1,992

TOTAL FERC–512 .....................

50

1

50

24 hrs.; $1,992

1,200 hrs.;
$99,600.

$1,992

Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
1 16

U.S.C. 791a–825r (2012).
is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
2 Burden

VerDate Sep<11>2014

22:36 Jan 08, 2021

Jkt 253001

and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: January 5, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P

explanation of what is included in the information
collection burden, refer to 5 Code of Federal
Regulations 1320.3.
3 Commission staff estimates that the industry’s
skill set and cost (for wages and benefits) for FERC–

Frm 00042

Fmt 4703

Sfmt 4703

Federal Energy Regulatory
Commission
[Docket No. RC11–6–011]

North American Electric Reliability
Corporation; Notice of Filing

[FR Doc. 2021–00262 Filed 1–8–21; 8:45 am]

PO 00000

DEPARTMENT OF ENERGY

Take notice that on December 30,
2020, the North American Electric
Reliability Corporation submitted an
512 are approximately the same as the
Commission’s average cost. The FERC 2020 average
salary plus benefits for one FERC full-time
equivalent (FTE) is $172,329/year (or $83.00/hour).

E:\FR\FM\11JAN1.SGM

11JAN1


File Typeapplication/pdf
File Modified2021-01-09
File Created2021-01-09

© 2024 OMB.report | Privacy Policy