NESHAP for Shipbuilding and Ship Repair Facilities - Surface Coating (40 CFR part 63, subpart II) (Renewal)

ICR 202104-2060-001

OMB: 2060-0330

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2021-04-11
Supporting Statement A
2021-04-11
ICR Details
2060-0330 202104-2060-001
Received in OIRA 201802-2060-012
EPA/OAR 1712.11
NESHAP for Shipbuilding and Ship Repair Facilities - Surface Coating (40 CFR part 63, subpart II) (Renewal)
Extension without change of a currently approved collection   No
Regular 05/10/2021
  Requested Previously Approved
36 Months From Approved 05/31/2021
100 112
25,600 28,700
0 0

The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Shipbuilding and Ship Repair Facilities - Surface Coating applies to owners or operators of shipbuilding and ship repair facilities with primer and top -coat applications in manufacturing processes and in ship repair processes. Owners or operators of shipbuilding and ship repair facilities are required to report startup, initial performance test, and retest information. Facilities will also periodically report emission exceedances, changes to equipment, and comply with other requirements of the NESHAP. This information is being collected to assure compliance with 40 CFR Part 63, Subpart II.

US Code: 44 USC 3501 et seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  85 FR 28003 05/12/2020
86 FR 24861 05/10/2021
No

1
IC Title Form No. Form Name
NESHAP for Shipbuilding and Ship Repair Facilities - Surface Coating (40 CFR part 63, subpart II)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 100 112 0 0 -12 0
Annual Time Burden (Hours) 25,600 28,700 0 0 -3,100 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
There is no change in burden on the respondents from the most-recently approved ICR as currently identified in the OMB Inventory of Approved Burdens. This is due to two considerations: 1) the regulations have not changed over the past three years and are not anticipated to change over the next three years; and 2) the growth rate for this industry is very low or non-existent, so there is no significant change in the overall burden. Since there are no changes in the regulatory requirements and there is no significant industry growth, there are also no changes in the capital/startup or operation and maintenance (O&M) costs. There is a decrease in the reported hour burden due to a correction. The previous ICR incorrectly included burden for federal facilities, which has been removed in this request.

$12,700
No
    No
    No
No
No
No
No
Patrick Yellin 202 564-2970

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
05/10/2021


© 2024 OMB.report | Privacy Policy