FERC-725L 60-day notice (issued)

FERC-725L 60 day notice issued.DOCX

FERC-725L (Mandatory Reliability Standards for the Bulk-Power System: MOD Reliability Standards) (RD20-4)

FERC-725L 60-day notice (issued)

OMB: 1902-0261

Document [docx]
Download: docx | pdf

UNITED STATES OF AMERICA

FEDERAL ENERGY REGULATORY COMMISSION


[Docket No. IC21-13-000]


COMMISSION INFORMATION COLLECTION ACTIVITIES (FERC-725L);

COMMENT REQUEST; EXTENSION


(April 2, 2021)


AGENCY: Federal Energy Regulatory Commission.


ACTION: Notice of information collection and request for comments.

SUMMARY: In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 USC 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC 725L (Mandatory Reliability Standards for the Bulk-Power System: MOD Reliability Standards).

DATES: Comments on the collection of information are due [INSERT DATE 60 days after date of publication in the Federal Register].

ADDRESSES: You may submit copies of your comments (identified by Docket No. IC21-13-000) by one of the following methods:

Electronic filing through http://www.ferc.gov, is preferred.

  • Electronic Filing: Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format.

  • For those unable to file electronically, comments may be filed by USPS mail or by hand (including courier) delivery:

    • Mail via U.S. Postal Service Only: Addressed to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street, N.E., Washington, DC 20426.

    • Hand (including courier) delivery: Deliver to: Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852.

Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov. For user assistance, contact FERC Online Support by e-mail at [email protected], or by phone at (866) 208-3676 (toll-free).

Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov.

FOR FURTHER INFORMATION : Ellen Brown may be reached by e-mail at [email protected], telephone at (202) 502-8663.

SUPPLEMENTARY INFORMATION:

Title: FERC-725L, Mandatory Reliability Standards for the Bulk-Power System: MOD Reliability Standards

OMB Control No.: 1902-0261

Type of Request: Three-year extension of the FERC-725L information collection requirements with no changes to the reporting requirements.

Abstract: MOD Reliability Standards ensure that generators remain in operation during specified voltage and frequency excursions, properly coordinate protective relays and generator voltage regulator controls, and ensure that generator models accurately reflect the generator’s capabilities and equipment performance.

On May 30, 2013, the North American Electric Reliability Corporation (NERC) filed a petition explaining that the reliability of the Bulk-Power System benefits from “good quality simulation models of power system equipment,”1 and that “model validation ensures the proper performance of the control systems and validates the computer models used for stability analysis.” NERC further stated that the Reliability Standards will enhance reliability because the tests performed to obtain model data may reveal latent defects that could cause “inappropriate unit response during system disturbances.”1 Subsequently, on March 20, 2014,1 the Commission approved Reliability Standards MOD-025-2, MOD-026-1, and MOD-027-1. These Standards were intended to address generator verifications needed to support Bulk-Power System reliability that would also ensure that accurate data is verified and made available for planning simulations.2

On May 1, 2014,3 the Commission approved Reliability Standards MOD-032-1 and MOD-033-2. These Standards were to address “system-level modeling data and validation requirements necessary for developing planning models and the Interconnection-wide cases that are integral to analyzing the reliability of the Bulk-Power System”.

MOD-025-2, MOD-026-1, MOD-027-1, MOD-031-3, MOD-032-1 and MOD-033-2 are all currently approved within the FERC-725L information collection. The reporting requirements associated with each standard will not change as a result of this extension request.

Type of Respondents: NERC-registered entities including generator owners, transmission planners, planning authorities, balancing authorities, resource planners, transmission service providers, reliability coordinators, and transmission operators.4

Estimate of Annual Burden5: The Commission estimates the annual public reporting burden6 and cost for the information collection as:

RD20-4:

  • Elimination of the burden associated with the load-serving entity (LSE) function in Requirement R1 of proposed Reliability Standard MOD-031-3.7 The NERC petition states as the load-serving entity is no longer a NERC registration category, NERC proposes to remove this entity from the applicability section of proposed Reliability Standard MOD-031-3 and remove reference to this entity in Requirement R1, Part 1.1, where it is listed as an “Applicable Entity” for purposes of Requirements R2 and R4.8

Additionally, NERC proposes to strike the term “Planning Authority” from the applicability section of the standard and the explanatory text that follows. The preferred terminology for the responsible entity that coordinates and integrates transmission facilities and service plans, resource plans, and protection systems is “Planning Coordinator.”9 This is a terminology change and will not result in a change in burden.

  • Modification of the term “Planning Authority” to “Planning Coordinator” in proposed Reliability Standard MOD-033-2.10 In the petition, NERC proposes to strike the term “Planning Authority” from the applicability section of the standard and the explanatory text that follows. The proposed change is intended to promote consistent use of “Planning Coordinator” throughout the Reliability Standards.11 This is a terminology change and will not result in a change in burden.

  • Reliability Standard MOD-031-3 (Demand and Energy Data)

  • Reliability Standard MOD-033-2 (Steady-State and Dynamic System Model Validation)



Proposed Changes to Burden Due to Docket No. RD20-4-000

Adjustments and Clarifications[1]

Reliability Standard & Requirements

No. of Respondents & Type of Entity

(1)

Annual No. of Responses per Respondent

(2)

Annual No. of Responses

(1)*(2)=(3)

Average Burden Hrs. Per Response

(4)

Total Annual Burden Hours

(3)*(4)=(5)


RD20-4 Net Changes to FERC-725L, OMB Control No. 1902-0261

MOD-031-3 (Demand and Energy Data)

Develop summary in accordance w/ R1, Subparts 1.5.4 and 1.5.5.—program decrease & adjustment / clarification12

-561 (DP, LSE, TP & BA)

1

-561

8 hrs.

-4,488 hrs.

MOD-031-3 (Demand and Energy Data) Develop data request in accordance w/ R1 and R3

& Evidence Retention—adjustment / clarification13

113 (PC & BA)

1

113

8 hrs.

904 hrs.

MOD-031-3 (Demand and Energy Data) Develop and provide data in accordance w/ R2 and R4

& Evidence Retention—adjustment / clarification36

381 (TP, BA & DP)

1

381

8 hrs.

3,048 hrs.

MOD-033-2 (Steady-State Dynamic System Model Validation)

R2

Data Submittal [for R2]—adjustment

-14 (RC & TOP) 14

1

-14

8 hrs.

-112 hrs.;

MOD-033-2 (Steady-State Dynamic System Model Validation),R1-R2, Evidence Retention, adjustment

-14 (PC, RC & TOP) 15

1

-14

1 hr.

-14 hrs.

Net Changes for FERC-725L due to RD20-4



-95 (net reduction)


-662 hrs.;

(net reduction)


MOD-025-2 (Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability)


Number of Respondents16
(1)

Annual Number of Responses per Respondent

(2)

Total Number of Responses (1)*(2)=(3)

Average Burden & Cost Per Response

(4)

Total Annual Burden Hours & Total Annual Cost

(3)*(4)=(5)

Cost per Respondent

($)

(5)÷(1)

Attachment 2

1003 (GO)


1

1003

6 hrs.;

$502.0217

6,018 hrs.;

$503,526.06

$502.02


Evidence Retention

1003

(GO)

1

1003

1 hr.;

$34.7918

1003 hrs.;

$34,894.07

$34.79

TOTAL


7,021 hrs.;

$538,420.07



MOD-026-1 (Verification of Models and Data for Generator Excitation Control System or Plant Volt/Variance Control Functions)


Number of Respondents
(1)

Annual Number of Responses per Respondent

(2)

Total Number of Responses (1)*(2)=(3)

Average Burden & Cost Per Response

(4)

Total Annual Burden Hours & Total Annual Cost

(3)*(4)=(5)

Cost per Respondent

($)

(5)÷(1)

Instructions for obtaining excitation control system or plant voltage/variance control function model

201

(TP)

1

201

8 hrs.;

$669.365

1,608 hrs.;

$134,541.36

$669.36

Documentation on generator verification

501

(GO)i


1

501

8 hrs.;

$669.365

4,008 hrs.;

$335,349.36

$669.36


Evidence Retention

668

(GO and TOP)

1

668

1 hr.;

$34.796

668 hrs.;

$23,239.72

$34.79

TOTAL


6,284 hrs.;

$493,130.44



MOD-027-1 (Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions)


Number of Respondents
(1)

Annual Number of Responses per Respondent

(2)

Total Number of Responses (1)*(2)=(3)

Average Burden & Cost Per Response

(4)

Total Annual Burden Hours & Total Annual Cost

(3)*(4)=(5)

Cost per Respondent

($)

(5)÷(1)

Instructions for obtaining excitation control system or plant voltage/variance control function model

201

(TP)

1

201

8 hrs.;

$669.365

1,608 hrs.;

$134,541.36

$669.36

Documentation on generator verification

501

(GO)19


1

501

8 hrs.;

$669.365

4,008 hrs.;

$335,349.36

$669.36


Evidence Retention

668

(GO and TP)

1

668

1 hr.;

$34.796

668 hrs.;

$23,239.72

$34.79

TOTAL


6,284 hrs.;

$493,130.44



MOD-031-3 (formerly MOD-031-2) (Demand and Energy Data), included in FERC-725L

Reliability Standard MOD-031-3

Number and Type of Respondents
(1)

Annual Number of Responses per Respondent (2)

Total Number of Responses

(1)*(2)=(3)

Avg. Burden & Cost Per Response20

(4)

Total Annual Burden Hours & Total Annual Cost

(3)*(4)=(5)

Cost per Respondent

(5)÷(1)

(On-going) Develop summary in accordance with Requirement R1, Subparts 1.5.4 and 1.5.5.


616

(DP, TP and/or BA)

1

616

8 hrs.;

$561.52

4,928 hrs.;
$345,896.32

$561.52

MOD-031-3 Net Changes in RD20-4 (in the first table above)



-67


-536 hrs.;

$37,621.84


New Total for MOD-031-3 for Renewal



549


4,392 hrs.;

$308,274.48



MOD-032-1 (Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions)


Number of Respondents
(1)

Annual Number of Responses per Respondent

(2)

Total Number of Responses (1)*(2)=(3)

Average Burden & Cost Per Response

(4)

Total Annual Burden Hours & Total Annual Cost

(3)*(4)=(5)

Cost per Respondent

($)

(5)÷(1)

Data Submittal

1,418

(BA, GO, PA/PC, RP, TO, TP, and TSP)


1

1,418

8 hrs.;

$561.5220

11,344 hrs.;

$796,235.36

$561.52


Evidence Retention

1,418

(BA, GO, PA/PC, RP, TO, TP, and TSP)


1

1,418

1 hr.;

$34.796

1,418 hrs.;

$49,332.22

$34.79

TOTAL


12,762 hrs.;

$998,484.70



MOD-033-2 (formerly MOD-033-1) (Steady-State and Dynamics System Model Validation)


Number of Respondents
(1)

Annual Number of Responses per Respondent

(2)

Total Number of Responses (1)*(2)=(3)

Average Burden & Cost Per Response

(4)

Total Annual Burden Hours & Total Annual Cost

(3)*(4)=(5)

Cost per Respondent

($)

(5)÷(1)

Data Submittal

178

(RC and TOP)


1

178

8 hrs.;

$669.367

1,424 hrs.;

$119,146.08

$669.36


Evidence Retention

243

(PA/PC, RC, and TOP)

1

243

1 hr.;

$34.796

243 hrs.;

$8,453.97

$34.79

MOD-033-2 Net Changes in RD20-4 (in the first table above)



-28


-126



New Total for MOD-033-2 Renewal



393


1,541 hrs.;

$128,935.47



The total annual estimated burden and cost for the FERC-725L information collection is 38,724 hours and $2,960,375.60 respectively.

Comments: Comments are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the

collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.



Kimberly D. Bose,

Secretary.



1 Final Rule in Docket No. RM13-16-000

2 NERC Petition for Approval of Five Proposed Reliability Standards MOD-025-2, MOD-026-1, MOD-027-1, PRC-019-1, and PRC-024-1 submitted to FERC on 5/30/2013.

3 Order in Docket No. RD14-5-000

4 In subsequent portions of this notice, the following acronyms will be used:

PA = Planning Authority, GO = Generator Owner, TP = Transmission Planner, BA = Balancing Authority, RP = Resource Planner, TSP = Transmission Service Provider, RC = Reliability Coordinator, TOP = Transmission Operator.

5 “Burden” is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3.

6 Each of the five MOD standards in the FERC-725L information collection previously contained “one-time” components to their respondent burden. These one-time burden categories consisted primarily of activities related to establishing industry practices and developing data validation procedures tailored toward these reliability standards and their reporting requirements. None of the one-time burdens apply any longer, so they are being removed from the FERC-725L information collection.

7 The burden associated with the current version of this standard, MOD-031-2, is included in FERC-725L.


10 The burden associated with the current version of this standard, MOD-033-1, is included in FERC-725L.

[1][1] The adjustments, due to normal industry fluctuations, are based on figures in the NERC registry as of April 10, 2020.


12 The estimates reflect a program decrease of 63 de-registered LSEs (and corresponding program decrease of 504 hrs.) related to Docket No. RD20-4-000, and an adjustment/clarification (decrease) of 498 DPs, TPs, and BAs (and corresponding decrease of 3,984 hrs.), not related to Docket No. RD20-4-000. The updated number of 381 DPs, TPs and BAs is listed in a new row clarifying their applicability with Requirements R2 and R4. Requirement R2 requires applicable entities to develop and provide data pursuant with Requirement R1.

13 The 113 PCs and BAs were originally estimated in FERC-725A due to Order No. 693. However, the estimates and descriptions were not clearly spelled out, so we are clarifying them. [Some of this burden may still be in FERC-725A (and double counted temporarily).]

14 The estimate is changing to 174 (from 188) due to normal industry fluctuation.

15 The estimate is changing to 188 (from 194) due to normal industry fluctuation.

16 The number of respondents for MOD-025-2/ MOD-026-1/ MOD-027-1/ MOD-31-3/ MOD-032-/ MOD-033-2 are from the NERC compliance registry February 5, 2021.

17 This wage figure uses the average hourly wage (plus benefits) for electrical engineers (Occupation Code: 17-2071, $70.19/hour) and managers (Occupation Code: 11-0000, $97.15/hour) obtained from the Bureau of Labor Statistics (BLS) (from https://www.bls.gov/oes/current/naics2_22.htm). The average used the following calculation: [$70.19/hour + $97.15/hour] ÷ 2 = $83.67/hour.

18 The estimate uses the hourly average wage (plus benefits) for file clerks obtained from the Bureau of Labor Statistics: $34.79/hour (BLS Occupation Code: 43-4071).

19 It is estimated that the applicable numbers of generator owner respondents used to calculate the public reporting burden for these standards MOD-026-1, MOD-027- 1, MOD-032-1 and MOD-033-1 is half of total numbers of GO (501=1003/2) due to the higher applicability threshold for those Reliability Standards.

20 The estimate uses the average hourly wage (plus benefits) of $70.19/hour for electrical engineers (Occupation Code: 17-2071) from the Bureau of Labor Statistics.

i

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File Modified0000-00-00
File Created2021-06-15

© 2024 OMB.report | Privacy Policy