Methane Challenge Program

Implementation Plan


Partner Name



Current As Of (Date)

     



     

























This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2060-0722). Responses to this collection of information are voluntary 42 USC 7403(g). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The public reporting and recordkeeping burden for this collection of information is estimated to be 37 hours per response. Send comments on the Agency’s need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address.

Methane Challenge Commitments1 - BMP Commitment Option

Source

Start Date

Achievement Year

Onshore Production

Pneumatic Controllers

     

     

Equipment Leaks/Fugitive Emissions

     

     

Liquids Unloading

     

     

Pneumatic Pumps

     

     

Fixed Roof, Atmospheric Pressure Hydrocarbon Liquid Storage Tanks

     

     

Continuous Improvement Source (TBD)

     

     

Continuous Improvement Source (TBD)

     

     

Gathering and Boosting

Pneumatic Controllers

     

     

Equipment Leaks/Fugitive Emissions

     

     

Pneumatic Pumps

     

     

Fixed Roof, Atmospheric Pressure Hydrocarbon Liquid Storage Tanks

     

     

Reciprocating Compressors - Rod Packing Vent

     

     

Centrifugal Compressors - Venting

     

     

Continuous Improvement Source (TBD)

     

     

Continuous Improvement Source (TBD)

     

     

Natural Gas (NG) Processing

Reciprocating Compressors - Rod Packing Vent

     

     

Centrifugal Compressors - Venting

     

     

Continuous Improvement Source (TBD)

     

     

Continuous Improvement Source (TBD)

     

     

NG Transmission & Underground Storage

Reciprocating Compressors - Rod Packing Vent

     

     

Centrifugal Compressors - Venting

     

     

Equipment Leaks (Compressor Blowdown and Isolation Valves)

     

     

Transmission Pipeline Blowdowns between Compressor Stations (Commitment Rate:      ; must be 50% or greater)

     

     

Pneumatic Controllers

     

     

Continuous Improvement Source (TBD)

     

     

Continuous Improvement Source (TBD)

     

     

NG Distribution

M&R Stations/City Gates

     

     

Mains – Cast Iron and Unprotected Steel (Commitment Rate:      )

     

     

Services – Cast Iron and Unprotected Steel

     

     

Distribution Pipeline Blowdowns (Commitment Rate:      ; must be 50% or greater)

     

     

Excavation Damages

     

     

Renewable Natural Gas

     

     

Continuous Improvement Source (TBD)

     

     

Continuous Improvement Source (TBD)

     

     


Methane Challenge Commitments - ONE Future Emissions Intensity Commitment Option

Segment:

     

Intensity Target:

     

Target Year:

     











Milestones/Timeframes for Meeting Commitments

Provide information on steps for achieving commitments such as anticipated rate of progress, key milestones, or other context (e.g., referencing work to be done during the next planned shutdown of a facility).

     




Additional Information/Context (optional)

Use this space, if desired, to provide other information about Program participation, such as plans for expanding Methane Challenge commitments, how historical actions informed Methane Challenge commitments, or other information on how the Program will be implemented.

     





1 Partners may delete unused rows within the table and may duplicate rows and add relevant details as needed (e.g., a corporate parent partner that has different commitments for each LDC can duplicate relevant rows to list the commitments for each LDC).

EPA Form No. 5900-410 Template last updated: 31 March 2021 Page 1

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
AuthorU.S. Environmental Protection Agency
File Modified0000-00-00
File Created2022-07-20

© 2024 OMB.report | Privacy Policy