Hole Size |
Size/Grade |
Wt. (#ft.) |
Top (MD) |
Bottom (MD) |
Stage Cementer Depth |
No. of Sks. & Type of Cement |
Slurry Vol. (BBL) |
Cement Top* |
Amount Pulled |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24. Tubing Record
Size |
Dept Set (MD) |
Packer Dept (MD) |
Size |
Depth Set (MD) |
Packer Depth ( |
MD) |
|
Siz |
e |
Depth Set (MD) |
Packer Depth (MD) |
||
|
|
|
|
|
|
|
|
|
|
|
|
||
25. Producing Intervals |
|
|
26. Perforation Record |
|
|
|
|
||||||
Formation |
|
Top |
Bottom |
Perforated Interval |
Size |
|
No. Holes |
|
Perf. Status |
||||
A) |
|
|
|
|
|
|
|
|
|
||||
B) |
|
|
|
|
|
|
|
|
|
||||
C) |
|
|
|
|
|
|
|
|
|
||||
D) |
|
|
|
|
|
|
|
|
|
Acid, Fracture, Treatment, Cement Squeeze, Post hydraulic fracturing chemical disclosures on FracFocus.org when required by state or federal regulation
Depth Interval |
Amount, Type of Material and Date of Chemical Disclosure upload on FracFocus.org as applicable |
|
|
|
|
|
|
|
|
Production - Interval A
Date First Produced |
Test Date |
Hours Tested |
Test Production
|
Oil BBL |
Gas MCF |
Water BBL |
Oil Gravity Corr. API. |
Gas Gravity |
Production Method |
Choke Size |
Tbg. Press. Flwg. SI |
Csg. Press. |
24 Hr. Rate
|
Oil BBL |
Gas MCF |
Water BBL |
Gas/Oil Ratio |
Well Status |
|
28a. Production - Interval B
Date First Produced |
Test Date |
Hours Tested |
Test Production
|
Oil BBL |
Gas MCF |
Water BBL |
Oil Gravity Corr. API. |
Gas Gravity |
Production Method |
Choke Size |
Tbg. Press. Flwg. SI |
Csg. Press. |
24 Hr. Rate
|
Oil BBL |
Gas MCF |
Water BBL |
Gas/Oil Ratio |
Well Status |
*(See instructions and spaces for additional data on page 2)
28b. Production - Interval C
Date First Produced |
Test Date |
Hours Tested |
Test Production
|
Oil BBL |
Gas MCF |
Water BBL |
Oil Gravity Corr. API. |
Gas Gravity |
Production Method |
Choke Size |
Tbg. Press. Flwg. SI |
Csg. Press. |
24 Hr. Rate
|
Oil BBL |
Gas MCF |
Water BBL |
Gas/Oil Ratio |
Well Status |
|
28c. Production - Interval D
Date First Produced |
Test Date |
Hours Tested |
Test Production
|
Oil BBL |
Gas MCF |
Water BBL |
Oil Gravity Corr. API. |
Gas Gravity |
Production Method |
Choke Size |
Tbg. Press. Flwg. SI |
Csg. Press. |
24 Hr. Rate
|
Oil BBL |
Gas MCF |
Water BBL |
Gas/Oil Ratio |
Well Status |
|
Disposition of Gas (Solid, used for fuel, vented, etc.)
30. Summary of Porous Zones (Include Aquifers): Show all important zones of porosity and contents thereof: Cored intervals and all drill-stem tests, including depth interval tested, cushion used, time tool open, flowing and shut-in pressures and recoveries. |
31. Formation (Log) Markers |
|
|||
Formation |
Top |
Bottom |
Descriptions, Contents, etc. |
Name |
Top |
Meas. Depth |
|||||
|
|
|
|
|
|
32. Additional remarks (include plugging procedure).
Title 18 U.S C. Section 1001 and Title 43 U.S C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.
(Continued on page 3) (Form 3160-4, page 2)
GENERAL: This form is designed for submitting a complete and correct well completion/recompletion report and log on all types of wells on Federal and Indian leases to a Federal agency, pursuant to applicable Federal laws and regulations. Any necessary special instructions concerning the use of this form and the number of copies to be submitted, particularly with regard to local, area, or regional procedures and practices, either are shown below or will be issued by, or may be obtained from, the local Federal office. If not filed prior to the time this summary record is submitted, copies of all currently available logs (drillers, geologists, sample and core analysis, and all types electric), formation and pressure tests, and directional surveys, should be attached hereto, to the extent required by applicable Federal laws and regulations. All attachments should be listed on this form, see item 33.
ITEM 4: Locations on Federal or Indian land should be described in accordance with Federal requirements. Consult local Federal office for specific instructions.
ITEM 17: Indicate which reported elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments.
ITEM 23: Show how reported top(s) of cement were determined, i.e. circulated (CIR), or calculated (CAL), or cement bond log (CBL), or temperature survey (TS).
The Privacy Act of 1974 and the regulation in 43 CFR 2.48 (d) provide that you be furnished the following information in connection with information required by this application.
AUTHORITY: 30 U.S.C. 181 et seq., 351 et seq., 25 U.S.C. et seq.; 43 CFR 3160.
PRINCIPAL PURPOSE: The information is to be used to evaluate the actual operations performed in the drilling, completing and testing of a well on a Federal or Indian lease.
ROUTINE USES: (1) Evaluate the equipment and procedures used during the drilling and completing/recompleting of a well. (2) The review of geologic zones and formation encountered during drilling. (3) Analyze future applications to drill in light of data obtained and methods used. (4)(5) Information from the record and/or the record will be transferred to appropriate Federal, State, local or foreign agencies, when relevant to civil, criminal or regulatory investigations or prosecutions.
EFFECT OF NOT PROVIDING INFORMATION: Filing of this report and disclosure of the information is mandatory once a well drilled on a Federal or Indian lease is completed/recompleted.
The Paperwork Reduction Act of 1995 requires us to inform you that:
The BLM collects this information to allow evaluation of the technical, safety, and environmental factors involved with drilling and completing/recompleting wells on Federal and Indian oil and gas leases.
This information will be used to analyze operations and to compare equipment and procedures actually used with those proposed and approved.
Response to this request is mandatory only if the operator elects to initiate drilling and completing/recompleting operations on an oil and gas lease.
The BLM would like you to know that you do not have to respond to this or any other Federal agency-sponsored information collection unless it displays a currently valid OMB control number.
BURDEN HOURS STATEMENT: Public reporting burden for this form is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the form. Direct comments regarding the burden estimate or any other aspect of this form to U.S. Department of the Interior, Bureau of Land Management (1004-0137), Bureau Information Collection Clearance Officer (WO-630), 1849 C Street, N.W., Mail Stop 401 LS, Washington, D.C.
20240.
(Form 3160-4, page 3)
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
File Title | BLM Form 3160-4 |
Subject | Electronic Form Created: 08/05/2019 |
Author | NPC, Inc. |
File Modified | 0000-00-00 |
File Created | 2022-05-24 |