Extracted Text
Contractor’s Certificate of Actual Cost Section 232 U.S. Department of Housing and Urban Development Office of Residential Care Facilities OMB Approval No. 2502-0605 (exp. 03/31/2018) Public reporting burden for this collection of information is estimated to average 8 hours. This includes the time for collecting, reviewing, and reporting the data. The information is being collected to obtain the supportive documentation which must be submitted to HUD for approval, and is necessary to ensure that viable projects are developed and maintained. The Department will use this information to determine if properties meet HUD requirements with respect to development, operation and/or asset management, as well as ensuring the continued marketability of the properties. This agency may not collect this information, and you are not required to complete this form unless it displays a currently valid OMB control number. Warning: Any person who knowingly presents a false, fictitious, or fraudulent statement or claim in a matter within the jurisdiction of the U.S. Department of Housing and Urban Development is subject to criminal penalties, civil liability, and administrative sanctions. Project Name: FHA Project Number: Building Number: Project Address: Borrower Name: Contractor Name: Div. Trade Item Paid in Cash To Be Paid In Cash Total Name of Subcontractor or Payee Line 3 Concrete 1 4 Masonry 2 5 Metals 3 6 Rough Carpentry 4 6 Finish Carpentry 5 7 Waterproofing 6 7 Insulation 7 7 Roofing 8 7 Sheet Metal 9 8 Doors 10 8 Windows 11 8 Glass 12 9 Lath and Plaster 13 9 Drywall 14 9 Tile Work 15 9 Acoustical 16 9 Wood Flooring 17 9 Resilient Flooring 18 9 Painting and Decorating 19 10 Specialties 20 11 Special Equipment 21 11 Cabinets 22 11 Appliances 23 12 Blinds and Shades, Artwork 24 12 Carpets 25 13 Special Construction 26 14 Elevators 27 15 Plumbing and Hot Water 28 15 Heat and Ventilation 29 15 Air Conditioning 30 16 Electrical 31 Subtotal (Structures) 32 Accessory Structures 33 Total (Structures) Div. Trade Item Paid in Cash To be Paid Cash Total Name of Subcontractor or Payee Line 2 Earth Work 35 2 Site Utilities 36 2 Roads and Walks 37 2 Site Improvements 38 2 Lawns and Planting 39 2 Unusual Site Conditions 40 Total (Land Improvements) 41 Total (Structure and Land Improvements) 42 1 General Requirements 43 General Overhead 44 Miscellaneous (Labor and Materials) * 45 Bond Premium 46 Other Fees–Paid by Contractor 47 48 Total Costs 49 * Total purchases of materials and cost of labor amounting to less than $1,000 may be included as a lump sum under miscellaneous materials and labor. Costs exceeding this amount for materials and labor must be allocated to the trade item under which they were expended on HUD-92330-A-ORCF worksheets 3 and 4. Note: If additional space is required for these or other items, append Rider thereto, with references and initial. When more than one subcontractor is performing a trade item, the attached work sheet must be completed giving the information indicated. Itemized Breakdown General Requirements (Job Overhead) Other Fees–Paid by Contractor Item Total Item Total Supervision $ $ Field Engineering Field Office Expense Temporary Facilities Temporary Utilities Cleaning and Rubbish Removal Watchmen Wages Total for General Requirements $ Total $ The undersigned hereby certifies that: (Check One) There has not been and is not now any identity of interest between borrower and/or general contractor on the one hand and any subcontractor, material supplier or equipment lessor on the other. The accompaniment contains a statement fully describing any identities of interest. Identity of Interest is defined as follows: When there is any financial interest of the party of the first part in the party of the second part; when one or more of the officers, directors or stockholders or the part of the first part is also an officer, director or stockholder of the party of the second part; when any officer, director or stockholder of the party of the first part has any financial interest whatsoever in the party of the second part; when the part of the second part advances any funds to the party of the first part; when the party of the second part provides and pays on behalf of the party of the first part the cost of any architectural services or engineering services other than those of a surveyor, general superintendent, or engineer employed by a general contract in connection with its obligations under the construction contract; when the party of the second part takes stock or any interest in the party of the first part as part of the consideration to be paid them; when there exist or come into being any side deals, agreements, contracts or undertakings entered into or contemplated, thereby altering, amending or cancelling any of the required closing documents except as approved by HUD. All amounts shown have been reduced to give effect to the amount(s) of any kickbacks, rebates, adjustments, discounts, or any other devices which had the effect of reducing the actual cost, and all amounts shown above as “to be paid in cash” will be so paid within forty-five (45) days after final endorsement. Note: This certificate must be supported by a certification as to actual cost by an independent Certified Public Accountant or by an independent public accountant as required for Form HUD-93305-ORCF. I hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is true and accurate. Signature: Date: