5900-254 Partner Response Form Disputable

EPA's ENERGY STAR Product Labeling (Renewal)

Partner_Response_Form_Disputable (1).xlsm

Partner Response Forms (PRFs)

OMB: 2060-0528

Document [xlsx]
Download: xlsx | pdf




OMB Control No. 2060-0528




Expiration Date: 1/31/2022
Partner Response Form
Instructions
1. Yellow fields are required. If any are blank, EPA will reject your submittal.
2. If you do not include a representative signature at the bottom of this form, EPA will reject your submittal.
3. Select Option A or Option B below, and complete all of the corresponding sections.

• Option A, Submitting Product Control Measures: Complete Sections I, II, III, V, and VI. Check here if selecting Option A:
• Option B, Disputing the pending disqualification: Complete Sections I, II, IV,V, and VI. Check here if selecting Option B:
4. Click on each field for additional instructions.
Save your completed form as "Testing Failure_[Company Name]_[EPA Case Number]" and submit it to [email protected]. EPA will review your submittal, and notify you once the form is approved or if additional information is necessary.


Section I: Product and Shipping Information (Option A or B)
Partner Name
(company):

Date Last Manufactured:

EPA Case Number
(from EPA letter):

Date of Last
Sales Shipment
(labeled units):


Original Equipment Manufacturer (OEM):
Recipient of Last
Sales Shipment
(labeled units):


Test Failure
Notification Date:

Destination of Last
Sales Shipment
(labeled units):


Tested Unit's Brand Name:
Units Shipped
in Last 6 months
(labeled units):


Model's ENERGY STAR Product Category:
Total Units Manufactured
(labeled units):


Disqualified Model Number
(from EPA letter):

Is the model promoted by an energy efficiency program and/or utility? (If yes, provide name[s])



Section II: Contact Information (Option A or B)
Point of Contact
at Your Company:

Original Equipment Manufacturer (OEM):

Title:
OEM Contact:

Email:
Title:

Phone:
Email:

Additional Contacts?
Phone:

Name (Email)









Section III: Certification of Product Control Measures (PCM) (Option A)
Only complete this section if submitting product control measures. If disputing the pending disqualification, proceed to
Section IV.

For the model numbers in Sections I and V, the company named in the Partner Name field of Section I is undertaking the following measures. Note: If you seek to deviate from the proposed measures after EPA has approved them, you must notify EPA prior to making any changes.
1) Inform your distribution chain that the model(s) is/are not ENERGY STAR certified:
EPA requires that you notify all downstream parties to whom you directly sold the model(s) as ENERGY STAR certified in the last two years, including all distributors, online and in-store retailers, consumers, and other affected organizations (e.g., utilities), that the model(s) is/are no longer ENERGY STAR certified. Specifically, the following statement must be included in all communications: "This product failed verification testing and has been disqualified from ENERGY STAR." Use the table below to submit a list of these entities. If you need additional rows, submit with this form a supplementary document listing the additional organizations contacted. Enter "N/A" for any unused rows.

Organization Name: Organization Type: Proposed or Actual Completion Date:
e.g., Big Box Store e.g., National Retailer e.g., 3/15/12







































CFL and ILL products only: If the distribution chain you've listed above includes one or more of the product retailers identified in EPA's testing failure email to your organization, you must include the EPA-provided contact(s) for that/those retailer(s) as part of your downstream notice that the model(s) is/are no longer ENERGY STAR certified. By checking the box at right, you indicate you have or will contact the applicable contact(s) by the completion date(s) listed above.




2) Remove the ENERGY STAR mark from all: Applicable? Proposed or Actual Completion Date: Number of Units:

a) Affected Units:
(within your control)






Applicable? Proposed or Actual Completion Date: Number of Units:

b) Unit Packaging:
(within your control)






Applicable? Proposed or Actual Completion Date: URL of Modified Website:

c) Website References to Model(s):





Applicable? Proposed or Actual Completion Date: Example of Modified Marketing Material:

d) Marketing Materials:
(e.g., spec sheets)







Section IV: Dispute Disqualification (Option B)
Complete this section if disputing the pending disqualification.
If you wish to dispute the test results, you must identify all grounds for dispute using this form. EPA will conduct a technical review of all dispute information submitted by the date specified in the testing failure letter you received, and determine whether to maintain the product(s) as certified. Please note that all bases for disputes must be raised within the comment period in order for EPA to consider that information. All comments should be included in the dispute section of the partner response form linked above, and additional attachments may be included with that submittal. All partners submitting a dispute may request a conference call with EPA to discuss the testing failure and basis for testing dispute.

Check here if you would like to schedule a conference call with EPA to discuss your submittal:



Basis of Dispute:





EPA Determination:
(For EPA use only)







Section V, Part 1: Additional Model Numbers (Option A or B)
If submitting for windows, doors, and skylights products, proceed directly to Section V, Part 2
Use this section for affected family models. Fill out a new form for any models requiring different actions or estimated completion dates from those entered in Section III.
Additional Model #:
Units Shipped in Last
6 Months:

Date of Last Sales Shipment:

Additional Model #:
Units Shipped in Last
6 Months:

Date of Last Sales Shipment:

Additional Model #:
Units Shipped in Last
6 Months:

Date of Last Sales Shipment:

Additional Model #:
Units Shipped in Last
6 Months:

Date of Last Sales Shipment:



Section V, Part 2: Affected Product Options (Option A or B)
Complete this section only if submitting for windows, doors, and skylights products
Use this section to identify all affected product options within the product line of the model number entered in Section I.
Identify affected product options of failed model(s)
List the National Fenestration Rating Council (NFRC) Certified Products Directory (CPD) number for any product options qualified on the same basis as the product that failed testing. For example, affected product options may be grouped with or otherwise share components or other product features with the product that failed testing, and as a result of the issue(s) identified during verification testing, the affected product options would also fail to meet the ENERGY STAR requirements. Any affected product options you elect to identify below will need to be reviewed and confirmed by NFRC prior to EPA review of your submittal. Please include with your response a written confirmation letter from an NFRC representative.

If you need additional rows, submit with this form a supplementary document listing the additional affected product options. Enter "N/A" for any unused rows. If no additional product options are affected by this failure, provide an explanation in Section VI.

Product Line Number: CPD # of Affected Product Option: Explanation: (optional)
























































Section VI (optional): Additional Comments (Option A or B)
Use this section to provide EPA with relevant information not included elsewhere in this form.















Representative Signature
As a representative of this company, I hereby certify on its behalf as to the actions taken or to be taken by it, as described above. Failure to implement these actions as indicated, or to inaccurately certify as completed, may result in partnership suspension or termination, or the loss of other ENERGY STAR program benefits. I understand that intentionally submitting false information to the U.S. government is a criminal violation of the False Statements Act, Title 18 U.S.C. section 1001.

Name (First & Last) Date I agree to the above statement














EPA Form No. 5900-254

























































File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy