Download:
pdf |
pdfFederal Register / Vol. 86, No. 181 / Wednesday, September 22, 2021 / Notices
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify
the project name and docket number on
the first page: Enosburg Falls
Hydroelectric Project (P–2905–035).
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. The application is not ready for
environmental analysis at this time.
l. The existing project consists of: (1)
A 195-foot-long, 18.5-foot-high concrete
gravity dam; (2) an impoundment with
a surface area of 121 acres at an
elevation of 386.87 feet National
Geodetic Vertical Datum of 1929 (NGVD
29); (3) a steel headgate structure that
includes three sluice gates; (4) an 80foot-long steel penstock that provides
flow to a 375-kilowatt (kW) semi-Kaplan
turbine-generator unit located in a
powerhouse (Kendall Plant); (5) an
approximately 5-foot-long tailrace that
discharges to the Missisquoi River from
the Kendall Plant; (6) an approximately
210-foot-long headrace canal located
downstream of the headgate structure;
(7) an intake structure, at the
downstream end of the headrace canal,
equipped with a sluice gate and a
trashrack; (8) a powerhouse containing
a 600-kW vertical Kaplan turbinegenerator unit (Village Plant); (9) an
approximately 240-foot-long tailrace
that discharges from the Village Plant to
the Missisquoi River; and (10)
appurtenant facilities. The project
creates an approximately 1,400-footlong bypassed reach of the Missisquoi
River.
The Village voluntarily operates the
project in a run-of-river mode. Article
401 of the current license requires the
Village to: (1) Maintain a minimum flow
of 293 cubic feet per second (cfs) from
April 15–June 15, and 120 cfs from June
16–April 14, or inflow, whichever is
less, from the Kendall Plant to the
bypassed reach; and (2) maintain a yearround minimum flow of 293 cfs or
inflow, whichever is less, from the
Village Plant to the downstream reach of
the Missisquoi River.
The Village proposes to: (1) Continue
operating the project in a run-of-river
mode; (2) provide a year-round
minimum flow of 243 cfs, or inflow,
whichever is less, from the Kendall
Plant to the bypassed reach; (3) develop
VerDate Sep<11>2014
16:44 Sep 21, 2021
Jkt 253001
a recreation management plan for
improving recreation at the project; (4)
release 1 inch of spill over the top of the
project dam crest gates to provide an
aesthetic veil of flow over the dam; (5)
develop an operation compliance
monitoring plan for maintaining
minimum flows, impoundment levels,
and run-of-river operation; and (6)
develop a historic properties
management plan to address and
mitigate project effects on historic
properties.
m. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents via the
internet through the Commission’s
Home Page (http://www.ferc.gov) using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at [email protected] or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
n. You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process.
Commission staff will prepare either
an environmental assessment (EA) or an
Environmental Impact Statement (EIS)
that describes and evaluates the
probable effects, if any, of the licensee’s
proposed action and alternatives. The
EA or EIS will consider environmental
impacts and reasonable alternatives to
the proposed action. The Commission’s
scoping process will help determine the
required level of analysis and satisfy the
NEPA scoping requirements,
irrespective of whether the Commission
prepares an EA or an EIS. At this time,
we do not anticipate holding on-site
scoping meetings. Instead, we are
soliciting written comments and
suggestions on the preliminary list of
issues and alternatives to be addressed
in the NEPA document, as described in
scoping document 1 (SD1), issued
September 15, 2021.
Copies of the SD1 outlining the
subject areas to be addressed in the
NEPA document were distributed to the
parties on the Commission’s mailing list
and the applicant’s distribution list.
Copies of SD1 may be viewed on the
web at http://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
52667
Dated: September 15, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–20460 Filed 9–21–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–253–000.
Applicants:. Bay Tree Solar, LLC.
Description:. Notice of SelfCertification of Exempt Wholesale
Generator Status of Bay Tree Solar, LLC.
Filed Date: 9/16/21.
Accession Number: 20210916–5053.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: EG21–254–000.
Applicants: Bay Tree Lessee, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator status of Bay Tree Lessee,
LLC.
Filed Date: 9/16/21.
Accession Number: 20210916–5058.
Comment Date: 5 p.m. ET 10/7/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–2214–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2021–
09–16_Att X Financial Improvements
and PGIA Compliance Filing to be
effective 12/31/9998.
Filed Date: 9/16/21.
Accession Number: 20210916–5043.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: ER21–2892–000.
Applicants: Prairie Wolf Solar, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 11/14/2021.
Filed Date: 9/15/21.
Accession Number: 20210915–5147.
Comment Date: 5 p.m. ET 10/6/21.
Docket Numbers: ER21–2893–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 6171; Queue
No. AF2–276 to be effective 8/25/2021.
Filed Date: 9/16/21.
Accession Number: 20210916–5015.
Comment Date: 5 pm ET 10/7/21.
Docket Numbers: ER21–2894–000.
Applicants: New York Independent
System Operator, Inc., Niagara Mohawk
Power Corporation.
E:\FR\FM\22SEN1.SGM
22SEN1
52668
Federal Register / Vol. 86, No. 181 / Wednesday, September 22, 2021 / Notices
Description: § 205(d) Rate Filing: New
York Independent System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii):
205 Reimbursement Agreement between
NMPC and NYSEG, SA2649 to be
effective 8/18/2021.
Filed Date: 9/16/21.
Accession Number: 20210916–5050.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: ER21–2895–000.
Applicants: Cedar Springs
Transmission LLC.
Description: Tariff Amendment:
Notice of Cancellation of MBR Tariff of
Cedar Springs Transmission, LLC to be
effective 9/17/2021.
Filed Date: 9/16/21.
Accession Number: 20210916–5072.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: ER21–2896–000.
Applicants: Wheatridge Wind Energy,
LLC.
Description: Tariff Amendment:
Notice of Cancellation of MBR Tariff of
Wheatridge Wind Energy, LLC to be
effective 9/17/2021.
Filed Date: 9/16/21.
Accession Number: 20210916–5074.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: ER21–2897–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Const Agmt Idaho Falls/Sugarmill 46kV
Differential to be effective 11/16/2021.
Filed Date: 9/16/21.
Accession Number: 20210916–5103.
Comment Date: 5 p.m. ET 10/7/21.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF21–1017–000.
Applicants: Bloom Energy
Corporation.
Description: Form 556 of Bloom
Energy Corporation.
Filed Date: 6/21/21.
Accession Number: 20210618–5136.
Comment Date: 5 pm ET 10/7/21.
Docket Numbers: QF21–1246–000.
Applicants: Bloom Energy
Corporation.
Description: Form 556 of Bloom
Energy Corporation [Fairfield].
Filed Date: 9/16/21.
Accession Number: 20210916–5045.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: QF21–1247–000.
Applicants: Bloom Energy
Corporation.
Description: Form 556 of Bloom
Energy Corporation [4501 Colorado
Blvd].
Filed Date: 9/16/21.
Accession Number: 20210916–5060.
Comment Date: 5 p.m. ET 10/7/21.
Take notice that the Commission
received the following electric
reliability filings:
VerDate Sep<11>2014
16:44 Sep 21, 2021
Jkt 253001
Docket Numbers: RD21–6–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of Proposed
Reliability Standards CIP–004–7 and
CIP–011–3 Addressing Bulk Electric
System Cyber System Information
Access Management.
Filed Date: 9/15/21.
Accession Number: 20210915–5199.
Comment Date: 5 p.m. ET 10/6/21.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR20–6–001.
Applicants: North American Electric
Reliability Corporation.
Description: Request of the North
American Electric Reliability
Corporation to expend funds from its
Operating Contingency Reserve to fund
an early termination option of its
Atlanta office lease.
Filed Date: 9/15/21.
Accession Number: 20210915–5195.
Comment Date: 5 pm ET 9/29/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–20492 Filed 9–21–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
Filings Instituting Proceedings
Docket Numbers: RP21–1114–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 9.15.21
Negotiated Rates—Spark Energy Gas,
LLC R–3045–27 to be effective 11/1/
2021.
Filed Date: 9/15/21.
Accession Number: 20210915–5041.
Comment Date: 5 p.m. ET 9/27/21.
Docket Numbers: RP21–1115–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 9.15.21
Negotiated Rates—Spark Energy Gas,
LLC R–3045–28 to be effective 11/1/
2021.
Filed Date: 9/15/21.
Accession Number: 20210915–5043.
Comment Date: 5 p.m. ET 9/27/21.
Docket Numbers: RP21–1116–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 9.15.21
Negotiated Rates—Twin Eagle Resource
Management, LLC R–7300–20 to be
effective 11/1/2021.
Filed Date: 9/15/21.
Accession Number: 20210915–5047.
Comment Date: 5 p.m. ET 9/27/21.
Docket Numbers: RP21–1117–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 9.15.21
Negotiated Rates—Twin Eagle Resource
Management, LLC R–7300–21 to be
effective 11/1/2021.
Filed Date: 9/15/21.
Accession Number: 20210915–5049.
Comment Date: 5 p.m. ET 9/27/21.
Docket Numbers: RP21–1118–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 9.15.21
Negotiated Rates—Uniper Global
Commodities North America LLC R–
7650–04 to be effective 11/1/2021.
Filed Date: 9/15/21.
Accession Number: 20210915–5053.
Comment Date: 5 p.m. ET 9/27/21.
Docket Numbers: RP21–1119–000.
Applicants: Tres Palacios Gas Storage
LLC.
Description: Annual Penalty
Disbursement Report of Tres Palacios
Gas Storage LLC under RP21–1119.
Filed Date: 9/15/21.
Accession Number: 20210915–5093.
Comment Date: 5 p.m. ET 9/27/21.
Docket Numbers: RP21–1120–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 9.16.21
Negotiated Rates—Citadel Energy
Marketing LLC R–7705–08 to be
effective 11/1/2021.
E:\FR\FM\22SEN1.SGM
22SEN1
File Type | application/pdf |
File Modified | 2021-09-22 |
File Created | 2021-09-22 |