Download:
pdf |
pdfRenewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
OMB Control No. ####-####
Expires MM/DD/YYYY
The RFS2 Production Outlook Report is required for registered RIN generating renewable fuel
producers and importers to provide expected renewable fuel production or imports at each
registered and planned facility, pursuant to §80.1449.
The report is used to submit renewable fuel volume production and import expectations, and
RIN generation expectations. Parties are required to provide renewable fuel volumes and RINs
on separate rows of this report. Parties may only report one D code, feedstock, biointermediate,
and fuel type per row.
Renewable fuel producers who are not registered and accepted with the RFS2 program may
choose to submit the information contained in this report on a voluntary basis.
Reports indicating zero projected production value are required to be filed for any registered RIN
generator.
This report is due annually on June 1.
The following fields have been updated:
• All fields are required to be filled in.
• All fields have been updated to reflect that the information must be reported for both VOL
and
RIN submissions.
• Field 6: Company/Entity ID: Any company who is not registered and accepted with the
RFS2 program who is choosing to submit the RFS0901 on a voluntary basis must enter
a company ID of 9999.
• Field 13: Feedstocks: All feedstocks and biointermediates must be reported on
separate rows of this report, regardless of the D code.
• Fields 16 through 27: Projected renewable fuel production or RIN generation for the
month is required.
• Fields 28 through 31: Projected renewable fuel production or RIN generation total for
the year is required.
Note: If a code has been introduced after the last revision date on this form, please refer to
the EMTS Reporting Codes and Fuel Pathways for the correct code (e.g. approval of petition
under 40 CFR
80.1415). This document can be found on the EMTS Documents webpage:
https://www.epa.gov/fuels-registration-reporting-and-compliance-help/reporting-codesand-fuel-pathways-epa-moderated
Please check the RFS reporting web site for updated instructions and templates:
https://www.epa.gov/fuels-registration-reporting-and-compliance-help/reporting-fuelprograms
EPA Form 5900-572
Page 1 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
1.
Field Name
Report Form ID
Units
OMB Control No. ####-####
Expires MM/DD/YYYY
Field Formats, Codes, & Special Instructions
AAAAAAA; Character.
RFS0902: Form ID for the RFS2 Production Outlook
Report
2.
Report Type
A; Character. Indicate whether this is the original
report or a resubmission. Submit only one Original
report, submit any corrections or updates as
Resubmission(s):
O: Original
R: Resubmission
3.
CBI
A; Character. Specify if the data contained
within the report is being claimed as Confidential
Business Information (CBI) under 40 CFR Part
2, subpart B:
Y: Confidential Business Information
N: Non-Confidential Business Information
4.
Report Date
MM/DD/YYYY; Date. Enter the date the
original or resubmitted report is submitted.
5.
Report Year
YYYY; Character. Indicate the compliance period
(year) of the report.
6.
Company/Entity
ID
9999; Number. Enter the four-digit, EPAassigned company/entity ID.
####: The four digit EPA-assigned company ID.
9999: Any renewable fuel producer who is not
currently registered and accepted with the RFS2
program who is voluntarily submitting the
RFS0901.
7.
Company Name
AAAAAAA…; Character (125 Max). The
reporting party’s name (Your company name).
EPA Form 5900-572
Page 2 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
8.
Field Name
Facility ID
Units
OMB Control No. ####-####
Expires MM/DD/YYYY
Field Formats, Codes, & Special Instructions
99999; Number. Producers and Importers who
generate RINs must reference individual facility ID
numbers. Please include all preceding zeros in five
digit facility ID numbers.
#####: The five digit EPA-assigned facility ID.
99999: If facility is unregistered and/or still in
planning stage.
9.
Report Information
Type
AAA; Character. Indicate the report information type
for the specific row of data:
VOL: Volume Information
RIN: RIN quantity Information
Note: Parties are required to provide renewable
fuel volumes and RINs on separate rows of the
report.
10.
Fuel D Code
AA; Character. Indicate the Fuel D Code. Only one
D code may be entered per row.
3: Cellulosic biofuel
4: Biomass-based diesel
5: Advanced biofuel
6: Renewable fuel
7: Cellulosic diesel
NA: At least one of the following:
• Not an approved pathway or does not appear in
Table 1 in 40 CFR 80.1426- No D Code assigned;
• Volume Exceeds Baseline and does not
qualify for a D code; or
• VOL entered in line 9
Note: If VOL entered in line 9, enter
11.
Fuel Type
999; Number. Indicate code corresponding to the Fuel
Type. Only one Fuel Type may be entered per row.
Note: This field is required for both “VOL” and
“RIN”.
EPA Form 5900-572
Page 3 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
12.
Field Name
Other Fuel Type
Description
Units
OMB Control No. ####-####
Expires MM/DD/YYYY
Field Formats, Codes, & Special Instructions
AAAA…; Character (125 max). If “888” is listed in
line 11, enter a description of the fuel type. If not
applicable, enter
“NA.”Note: This field is required for both “VOL” and
“RIN”.
13.
Feedstock(s) and
Biointermediates
14.
Other Feedstock
or Biointermediate
Description
999; Number. Indicate code(s) corresponding to the
feedstock(s) for fuel. Each feedstock and
biointermediate must be entered on a separate row,
regardless of the D code.
AAAA…; Character (125 max). If feedstock or
biointermediate is not listed and “888” is listed in line
14, enter a description of the feedstock or
biointermediate. If not applicable, enter “NA.”
Note: This field is required for both “VOL” and
“RIN”.
15.
Production
Process
16.
Next Calendar
January
Production/
Generation
(Current
year+1)
999; Number: Indicate code corresponding to the
Production Process. Only one Production Process
may be entered per row.
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in January of the next calendar
year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
EPA Form 5900-572
Page 4 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
17.
Field Name
Next Calendar
February
Production/
Generation
(Current
year+1)
OMB Control No. ####-####
Expires MM/DD/YYYY
Units
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in February of the next
calendar year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”
18.
Next Calendar
March
Production/
Generation
(Current year+1)
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in March of the next calendar
year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
EPA Form 5900-572
Page 5 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
19.
Field Name
Next Calendar
April
Production/
Generation
(Current
year+1)
OMB Control No. ####-####
Expires MM/DD/YYYY
Units
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in April of the next calendar year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
20.
Next Calendar
May Production/
Generation
(Current year+1)
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in May of the next calendar year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
EPA Form 5900-572
Page 6 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
21.
Field Name
Next Calendar
June
Production/
Generation
(Current
year+1)
OMB Control No. ####-####
Expires MM/DD/YYYY
Units
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in June of the next calendar year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
22.
Next Calendar
July Production/
Generation
(Current year+1)
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in July of the next calendar year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
EPA Form 5900-572
Page 7 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
Field Name
No.
23. Next Calendar
August
Production/
Generation
(Current year+1)
OMB Control No. ####-####
Expires MM/DD/YYYY
Units
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in August of the next calendar
year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
24.
Next Calendar
September
Production/
Generation
(Current
year+1)
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in September of the next
calendar year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
EPA Form 5900-572
Page 8 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
25.
Field Name
Next Calendar
October
Production/
Generation
(Current
year+1)
OMB Control No. ####-####
Expires MM/DD/YYYY
Units
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in October of the next calendar
year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
26.
Next Calendar
November
Production/
Generation
(Current
year+1)
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in November of the next
calendar year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
EPA Form 5900-572
Page 9 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
27.
Field Name
Next Calendar
December
Production/
Generation
(Current
year+1)
OMB Control No. ####-####
Expires MM/DD/YYYY
Units
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the volume of renewable
Gallons or
fuel expected to be produced or imported, or RIN
RINs
generation expected, in December of the next
calendar year.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the month, in gallons.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the month.
This field is required for both “VOL” and “RIN”.
28.
Production/
Generation for
the Second
Future Calendar
Year (Current
year+2)
99999999; Number. Indicate the total volume of
Gallons or
renewable fuel expected to be produced or imported,
RINs
or
RIN generation expected.
Note: If VOL entered in line 9, indicate the total
volume of renewable fuel expected to be produced or
imported for the second future calendar year.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the
second future calendar year.
This field is required for both “VOL” and “RIN”.
EPA Form 5900-572
Page 10 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
29.
Field Name
Production/
Generation for
the Third Future
Calendar Year
(Current year+3)
OMB Control No. ####-####
Expires MM/DD/YYYY
Units
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the total volume of
Gallons or
renewable fuel expected to be produced or imported,
RINs
or
RIN generation expected.
Note: If VOL entered in line 9, indicate the total
volume of renewable fuel expected to be produced or
imported for the third future calendar year.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the third future calendar year.
This field is required for both “VOL” and “RIN”.
30.
Production/
Generation for
the Fourth Future
Calendar Year
(Current year+4)
99999999; Number. Indicate the total volume of
Gallons or
renewable fuel expected to be produced or imported,
RINs
or
RIN generation expected.
Note: If VOL entered in line 9, indicate the total
volume of renewable fuel expected to be produced or
imported for the fourth future calendar year.
If RIN entered in line 9, indicate the RIN quantity
expected to be generated by the producer or importer
for the fourth future calendar year.
This field is required for both “VOL” and “RIN”.
31.
Production/
Generation for
the Fifth Future
Calendar Year
(Current year+5)
99999999; Number. Indicate the total volume of
Gallons or
renewable fuel expected to be produced or imported,
RINs
or
RIN generation expected.
Note: If VOL entered in line 9, indicate the volume
of renewable fuel expected to be produced or
imported for the fifth future calendar year.
If RIN entered in line 9, indicate the total RIN
quantity expected to be generated by the producer or
importer for the fifth future calendar year.
This field is required for both “VOL” and “RIN”.
EPA Form 5900-572
Page 11 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
32.
Field Name
Planned
Expansion Date
Units
OMB Control No. ####-####
Expires MM/DD/YYYY
Field Formats, Codes, & Special Instructions
MM/DD/YYYY; Date. Please enter the projected
date of any planned facility expansion in the next five
(5) calendar years. If an expansion is unknown or not
yet planned, enter “NA”.
Note: If “RIN” entered in line 9, enter
“NA”. This field is required for both
“VOL” and “RIN”.
33.
Strategic Planning
Date
MM/DD/YYYY; Date. Please enter in the projected
date of any current strategic planning for any planned
new construction or expansion in the next five (5)
calendar years. If a potential strategic planning date
is unknown or not yet planned, enter “NA”.
Note: If “RIN” entered in line 9, enter
“NA”. This field is required for both
“VOL” and “RIN”.
Description: Strategic planning occurs once upper
management has determined that a regulation will
affect a facility—it is at this stage that upper
management decides on a response to the regulation
that will position the company most advantageously
relative to its competitors. Input may include orderof-magnitude estimates of what compliance costs
could be; or, how the bottom line may be affected if
the decision is made not to comply and to instead
shift product into other markets. Specific planning
begins once management determines that,
strategically, compliance will be necessary and will
require the expenditure of significant capital. The
decision to hire an outside engineering firm may be
made at this time. The length of time required for
this stage varies by facility or company, depending on
size, complexity, and the number of facilities. It is
nearly impossible to precisely project how much time
a specific refinery may need to complete this stage.
EPA Form 5900-572
Page 12 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
34.
Field Name
Planning/
Front-end
engineering
Date
Units
OMB Control No. ####-####
Expires MM/DD/YYYY
Field Formats, Codes, & Special Instructions
MM/DD/YYYY; Date. Please enter the projected
date of any planning and front-end engineering that
has taken place or will take place for any planned
new construction or expansion in the next five (5)
calendar years. If planning/front-end engineering is
unknown or not yet planned, enter “NA”.
Note: If “RIN” entered in line 9, enter
“NA”. This field is required for both
“VOL” and “RIN”.
Description: Accurate and complete information is
gathered during this stage so that preliminary
process engineering work can proceed; and initial
contacts made with technology vendors to find the
best, least expensive technology options. Detailed
engineering cannot begin until this stage is mostly
complete. The length of time required for this stage
varies by facility.
35.
Detailed
Engineering/
Permitting
Date
MM/DD/YYYY; Date. Please enter the projected
date of any detailed engineering and permitting that
has taken place or will take place for any planned
new construction or expansion in the next five (5)
calendar years. If detailed engineering/permitting is
unknown or not yet planned, enter “NA”.
Note: If “RIN” entered in line 9, enter
“NA”. This field is required for both
“VOL” and “RIN”.
Description: Detailed engineering usually overlaps
with the preceding and the following stages, and
includes construction planning and procuring
contracts (since actual construction cannot be
started until construction permits are issued).
EPA Form 5900-572
Page 13 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
36.
Field Name
Procurement/
Construction
Date
Units
OMB Control No. ####-####
Expires MM/DD/YYYY
Field Formats, Codes, & Special Instructions
MM/DD/YYYY; Date. Please enter the projected
date of any procurement and construction that has
taken place or will take place for any planned new
construction or expansion in the next five (5)
calendar years. If a procurement/ construction date is
unknown or not yet planned, enter “NA”.
Note: If “RIN” entered in line 9, enter
“NA”. This field is required for both
37.
Commissioning/
Start-up Date
“VOL” and “RIN”.
Description: This stage necessarily overlaps with the
preceding stage. Procurement includes purchasing
MM/DD/YYYY; Date. Please enter the projected
date of any commissioning and start-up that has
taken place or will take place for any planned
expansion or new construction in the next five (5)
calendar years. If a commissioning/start-up date is
unknown or not yet planned, enter “NA”.
Note: If “RIN” entered in line 9, enter
“NA”. This field is required for both
“VOL” and “RIN”.
Description: Depending on the complexity of the
project,
commissioning and startup usually happen together.
A critical part of commissioning and startup is the
Occupational Safety and Health Administration’s
(OSHA) “Process Hazard Analysis”, a very
complicated and time consuming, multi-part
procedure that must be completed and signed-off on
before startup can proceed. For this, accurate, final
construction and as-built drawings, including
complete piping and instrument diagrams, must be
completed.
EPA Form 5900-572
Page 14 of 15
Renewable Fuel Standard (RFS2) Report Instructions
RFS2 Production Outlook Report
Report Form ID: RFS0902
Field
No.
38.
Field Name
Capital
Commitments
Units
OMB Control No. ####-####
Expires MM/DD/YYYY
Field Formats, Codes, & Special Instructions
AAAAAAA…; Character (1000 max). Please enter
in a short narrative of all capital commitments for
any planned expansion or new facility. If no
additional information, enter “NA”.
Note: If “RIN” entered in line 9, enter
“NA”. This field is required for both
“VOL” and “RIN”.
39.
Additional
Comments/
Description
AAAAAAA…; Character (1000 max). Please enter
in any additional comments or planned expansion or
construction description. If no additional comments,
enter
“NA”.
Note: If “RIN” entered in line 9, enter “NA”.
Sample report line:
RFS0902,O,Y,03/21/2012, 2013,1234,”Sample Company Inc”, 23456, RIN, 20, NA, 210,
NA,180, 4, 1,15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000,
15000, 180000,180000,180000,180000,NA,NA,NA,NA,NA,NA, NA
RFS0902,O,Y,03/21/2012, 2013,1234,”Sample Company Inc”, 23456, VOL, 20, NA, 210,
NA,180, 4, 1, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000,
15000, 180000, 180000,180000,180000,NA,NA,NA,NA,NA,NA, NA
Paperwork Reduction Act Statement
This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et
seq. (OMB Control No. ####-####). Responses to this collection of information are mandatory (40 CFR
part 1090). An agency may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number. The public reporting and
recordkeeping burden for this collection of information is estimated to range from one to two hours s per
response. Send comments on the Agency’s need for this information, the accuracy of the provided burden
estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division
Director, U.S. Environmental Protection Agency (2821T), 1200 Pennsylvania Ave., NW, Washington, D.C.
20460. Include the OMB control number in any correspondence. Do not send the completed form to this
address.
EPA Form 5900-572
Page 15 of 15
File Type | application/pdf |
File Title | Microsoft Word - rfs0902.docx |
Author | blarson |
File Modified | 2021-11-19 |
File Created | 2021-09-22 |