Information Collection Request

30 CFR 250, Subpart L, Oil and Gas Production Measurement, Surface Commingling, and Security

ICR 202201-1014-002 · OMB 1014-0002 · Received in OIRA

Forms and Documents

Forms and supporting documents for this ICR
DocumentTypeStatusAvailability
1014-0002 30-Day FRN published [87 FR 56978] exp. 10-17-22.pdf Supplementary Document Uploaded 2022-09-16 Missing upstream
1014-0002 60-day FRN published 3.29.22 [87 FR 18036] exp. 5.31.22.pdf Supplementary Document Uploaded 2022-09-02 Missing upstream
eCFR __ 30 CFR Part 250 Subpart L -- Oil and Gas Production Measurement, Surface Commingling, and Security.pdf Supplementary Document Uploaded 2022-09-02 Repair queued
1014-0002-SS-2022.docx Supporting Statement A Uploaded 2022-09-02 Available

IC Document Collections

Information collection document groups
IC IDCollectionTypeStatusForm
221640 250.1205(b)(3), (4) Seal Records - M&R Modified
221639 250.1204(b)(3) Well Test Data - M&R Modified
221638 250.1203(f)(4) Measurement Records - M&R Modified
221637 250.1202(k)(5) Meter Proving Reports - M&R Modified
221636 250.1202(e)(6) Master Meter Calibration Report - M&R Modified
221635 250.1205(a)(4) Report Security Problems - SC Modified
221634 250.1205(a)(2) Post Signs at Tanks - SC Modified
221633 250.1204(a)(2) Production Volume/Fractional Analysis - SC Modified
221632 250.1203(f)(5) Measuring Records - GM Modified
221631 250.1203(e)(1) Gas Processing Plant Records- GM Modified
221630 250.1203(c)(4),(5) Retention of Gas Meter Calibration Reports - GM Modified
221629 250.1203(c)(4),(5) Submittals of Gas Meter Calibration Reports - GM Modified
221628 250.1203(c)(1) - Gas Calibration Schedule - GM Modified
221625 250.1203(b)(6), (8), (9) Gas Quality & Volume Statement - GM Modified
221619 250.1202(i)(3) Retention of Inventory Tank Calibration Chart - LHM Modified
221616 250.1202(i)(3) Submittal of Inventory Tank Calibration Chart - LHM Modified
221615 250.1202(i)(2) - Royalty Tank Calibration Chart - LHM Modified
221613 250.1202(f)(2) - Mechanical-displacement & Tank Prover Calibration Report - LHM Modified
221612 250.1202(d)(5) - Royalty Meter Proving Report - LHM Modified
221611 250.1202(d)(1),(d)(4),(k)(9);1204(b)(1) Well Testing Request - LHM Modified
221609 250.1202(d)(1),(d)(4).(k)(9); 1204(b)(1) Proving Request - LHM Modified
221608 250.1202(c)(4) - Run Ticket - LHM Modified
221607 250.1202(a)(4) - Pipeline Condensate Volumes - LHM Modified
221606 250.1202 - Meter Status - LHM Modified
221605 250.1202-1204 Complex Application - LHM Modified
221604 250.1202-1204 Simple Application - LHM Modified

ICR Details

Reginfo record details
table that charts list comparision
  Requested Previously Approved
36 Months From Approved 02/28/2023
104,291 104,291
38,986 38,986
255,643 219,765





table that charts list of burden
  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 104,291 104,291 0 0 0 0
Annual Time Burden (Hours) 38,986 38,986 0 0 0 0
Annual Cost Burden (Dollars) 255,643 219,765 0 35,878 0 0


Reginfo record details
  No