1744

Federal Register / Vol. 87, No. 8 / Wednesday, January 12, 2022 / Notices

Filed Date: 1/5/22.
Accession Number: 20220105–5170.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–613–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment to Original WMPA, SA No.
6231; Queue No. AG2–392 to be
effective 11/11/2021.
Filed Date: 1/5/22.
Accession Number: 20220105–5161.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–764–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
6273; Queue No. AG2–422 to be
effective 12/7/2021.
Filed Date: 1/5/22.
Accession Number: 20220105–5050.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–765–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Northern Indiana Public Service
Company LLC.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2022–01–05_SA 3765
NIPSCO-Dunns Bridge Energy Storage
E&P (J1333 J1334 J1335) to be effective
1/1/2022.
Filed Date: 1/5/22.
Accession Number: 20220105–5058.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–766–000.
Applicants: Jersey Central Power &
Light Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Jersey Central Power & Light Company
submits tariff filing per 35.13(a)(2)(iii:
JCPL Submits IA No. 5947 to be
effective 3/7/2022.
Filed Date: 1/5/22.
Accession Number: 20220105–5065.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–767–000.
Applicants: Jersey Central Power &
Light Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Jersey Central Power & Light Company
submits tariff filing per 35.13(a)(2)(iii:
JCPL Submits IA No. 5948 to be
effective 3/7/2022.
Filed Date: 1/5/22.
Accession Number: 20220105–5089.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–768–000.
Applicants: Jersey Central Power &
Light Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Jersey Central Power & Light Company

VerDate Sep<11>2014

17:04 Jan 11, 2022

Jkt 256001

submits tariff filing per 35.13(a)(2)(iii:
JCPL Submits IA No. 5946 to be
effective 3/7/2022.
Filed Date: 1/5/22.
Accession Number: 20220105–5100.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–769–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Tippsol (Tipperary Solar) LGIA Filing to
be effective 12/20/2021.
Filed Date: 1/5/22.
Accession Number: 20220105–5104.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–770–000.
Applicants: Duke Energy Indiana,
LLC.
Description: § 205(d) Rate Filing: DEIAmeren—Rate Schedule No. 278—
Construction Agreement to be effective
1/6/2022.
Filed Date: 1/5/22.
Accession Number: 20220105–5108.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–771–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) Rate Filing:
EKPC Fourth Amended and Restated
Interconnection Agreement to be
effective 12/23/2021.
Filed Date: 1/5/22.
Accession Number: 20220105–5125.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–772–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205:
BSM Capacity Accreditation Market
Design to be effective 3/6/2022.
Filed Date: 1/5/22.
Accession Number: 20220105–5146.
Comment Date: 5 p.m. ET 1/26/22.
Docket Numbers: ER22–773–000.
Applicants: Mulligan Solar, LLC.
Description: Baseline eTariff Filing:
Mulligan Solar LLC MBR Application
Filing to be effective 3/7/2022.
Filed Date: 1/5/22.
Accession Number: 20220105–5147.
Comment Date: 5 p.m. ET 1/26/22.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH22–5–000.
Applicants: Starwood Energy Group
Global, L.L.C.
Description: Starwood Energy Group
Global, L.L.C., submits FERC 65–B
Notice of Change in Fact to Waiver
Notification.
Filed Date: 1/4/22.
Accession Number: 20220104–5193.
Comment Date: 5 p.m. ET 1/25/22.
The filings are accessible in the
Commission’s eLibrary system (https://

PO 00000

Frm 00030

Fmt 4703

Sfmt 4703

elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 5, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–00360 Filed 1–11–22; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC22–1–000]

Commission Information Collection
Activities (FERC–725) Comment
Request; Extension
Federal Energy Regulatory
Commission, DOE.
ACTION: Notice of information collection
and request for comments.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection, FERC–
725 (Certification of Electric Reliability
Organization; Procedures for Electric
Reliability Standards), which will be
submitted to the Office of Management
and Budget (OMB) for review. The
Commission issued a 60-day notice on
November 3, 2021 requesting public
comments; no comments were received.
DATES: Comments on the collection of
information are due February 11, 2022.
ADDRESSES: Send written comments on
FERC–725 to OMB through
www.reginfo.gov/public/do/PRAMain.
Attention: Federal Energy Regulatory
Commission Desk Officer. Please
identify the OMB Control Number
(1902–0225) in the subject line of your
comments. Comments should be sent
SUMMARY:

E:\FR\FM\12JAN1.SGM

12JAN1

Federal Register / Vol. 87, No. 8 / Wednesday, January 12, 2022 / Notices

lotter on DSK11XQN23PROD with NOTICES1

within 30 days of publication of this
notice to www.reginfo.gov/public/do/
PRAMain.
Please submit copies of your
comments to the Commission. You may
submit copies of your comments
(identified by Docket No. IC22–1–000)
by one of the following methods:
Electronic filing through http://
www.ferc.gov, is preferred.
• Electronic Filing: Documents must
be filed in acceptable native
applications and print-to-PDF, but not
in scanned or picture format.
• For those unable to file
electronically, comments may be filed
by USPS mail or by hand (including
courier) delivery.
Æ Mail via U.S. Postal Service Only:
Addressed to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (Including Courier) Delivery:
Deliver to: Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Instructions: OMB submissions must
be formatted and filed in accordance
with submission guidelines at
www.reginfo.gov/public/do/PRAMain.
Using the search function under the
‘‘Currently Under Review’’ field, select
Federal Energy Regulatory Commission;
click ‘‘submit,’’ and select ‘‘comment’’
to the right of the subject collection.
FERC submissions must be formatted
and filed in accordance with submission
guidelines at: http://www.ferc.gov. For
user assistance, contact FERC Online
Support by email at ferconlinesupport@
ferc.gov, or by phone at: (866) 208–3676
(toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/ferconline/overview.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], telephone
at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
Title: FERC–725, Certification of
Electric Reliability Organization;
Procedures for Electric Reliability
Standards.
OMB Control No.: 1902–0225.
Type of Request: Three-year extension
of the FERC–725 information collection

VerDate Sep<11>2014

17:04 Jan 11, 2022

Jkt 256001

requirements with no changes to the
current reporting and recordkeeping
requirements.
Abstract: The Commission issued a
60-day notice on November 3, 2021 (86
FR 60626) requesting public comments;
no comments were received.
The FERC–725 contains the following
information collection elements:
Self Assessment and ERO (Electric
Reliability Organization) Application:
The Commission requires the ERO to
submit to FERC a performance
assessment report every five years. The
next assessment is due in 2024. Each
Regional Entity submits a performance
assessment report to the ERO.
Submitting an application to become
the ERO is also part of this collection.1
Reliability Assessments: 18 CFR 39.11
requires the ERO to assess the reliability
and adequacy of the Bulk-Power System
in North America. Subsequently, the
ERO must report to the Commission on
its findings. Regional entities perform
similar assessments within individual
regions. Currently the ERO submits to
FERC three assessments each year: Long
term, winter, and summer. In addition,
the North American Electric Reliability
Corporation (NERC, the Commissionapproved ERO) also submits various
other assessments as needed.
Reliability Standards Development:
Under section 215 of the Federal Power
Act (FPA),2 the ERO is charged with
developing Reliability Standards.
Regional Entities may also develop
regional specific standards and have
standard experts on staff to work with
entities below the regional level.
Reliability Compliance: Reliability
Standards are mandatory and
enforceable upon approval by the
Commission. In addition to the specific
information collection requirements
contained in each standard (cleared
under other information collections),
there are general compliance,
monitoring and enforcement
information collection requirements
1 The Commission does not expect any new ERO
applications to be submitted in the next five years
and is not including any burden for this
requirement in the burden estimate. FERC still
seeks to renew the regulations pertaining to a new
ERO application under this renewal but is
expecting the burden to be zero for the foreseeable
future. 18 CFR 39.3 contains the regulation
pertaining to ERO applications.
2 16 U.S.C. 824o.

PO 00000

Frm 00031

Fmt 4703

Sfmt 4703

1745

imposed on applicable entities. Audits,
spot checks, self-certifications,
exception data submittals, violation
reporting, and mitigation plan
confirmation are included in this area.
Stakeholder Survey: The ERO uses a
stakeholder survey to solicit feedback
from registered entities 3 in preparation
for its five-year self-performance
assessment. The Commission assumes
that the ERO will perform another
survey prior to the 2024 self-assessment.
Other Reporting: This category refers
to all other reporting requirements
imposed on the ERO or regional entities
in order to comply with the
Commission’s regulations. For example,
FERC may require NERC to submit a
special reliability assessment or inquiry.
This category captures these types of
one-time filings required of NERC or the
Regions. The Commission implements
its responsibilities through 18 CFR part
39.
Type of Respondent: Electric
Reliability Organization, Regional
entities, and registered entities. Estimate
of Annual Burden: 4 The Commission
estimates the total annual burden and
cost 5 for this information collection in
the table below. For hourly cost (for
wages and benefits), we estimate that
70% of the time is spent by Electrical
Engineers (code 17–2071, at $72.15/hr.),
20% of the time is spent by Legal (code
23–0000, at $142.25/hr.), and 10% by
Office and Administrative Support
(code 43–0000, at $44.47/hr.). Therefore,
we use the weighted hourly cost (for
wages and benefits) of $83.40 (rounded)
{or [(0.70) * ($72.15/hr.)] + [(0.20) *
$142.25/hr.] + [(0.10) * $44.47/hr.]}.
3 A ‘‘registered entity’’ is an entity that is
registered with the ERO. All Bulk-Power System
owners, operators and users are required to register
with the ERO. Registration is the basis for
determining the Reliability Standards with which
an entity must comply. See http://www.nerc.com/
page.php?cid=3%7C25 for more details.
4 ‘‘Burden’’ is the total time, effort, or financial
resources expended by persons to generate,
maintain, retain, or disclose or provide information
to or for a Federal agency. For further explanation
of what is included in the information collection
burden, refer to Title 5 Code of Federal Regulations
1320.3.
5 Costs (for wages and benefits) are based on wage
figures from the Bureau of Labor Statistics (BLS) for
May 2021 (at https://www.bls.gov/oes/current/
naics2_22.htm) and benefits information (at https://
www.bls.gov/news.release/ecec.nr0.htm).

E:\FR\FM\12JAN1.SGM

12JAN1

1746

Federal Register / Vol. 87, No. 8 / Wednesday, January 12, 2022 / Notices

FERC–725, CERTIFICATION OF ELECTRIC RELIABILITY ORGANIZATION; PROCEDURES FOR ELECTRIC RELIABILITY
STANDARDS
Type of reporting
requirement

Type of respondent

Electric Reliability Organization (ERO).

Annual
number of
responses per
respondent

Total
number of
responses

Average
burden hours &
cost ($) per
response
(rounded)

Estimated total
annual
burden hrs. &
cost ($)
(rounded)

(A)

(B) 6

(A) × (B) = (C)

(D)

(C) × (D)

Self-Assessment ..................

1 ........................

.2

.2

4,160hrs.; $346,950 ...

832 hrs.; $69,390.

Reliability Assessments .......

...........................

5.0

5.0

10,400 hrs.; $867,360

Reliability Compliance ..........

...........................

2

2

Standards Development .......

...........................

1

1

Other Reporting ....................

...........................

1

1

52,000 hrs.;
$4,336,800.
35,360 hrs.;
$2,949,024.
35,360 hrs.;
$2,949,024.
4,160 hrs.; $346,944.

ERO, Sub-Total .............

...............................................

...........................

........................

........................

Regional Entities ...................

Self-Assessment ..................

6 ........................

.2

1.2

Reliability Assessments .......

...........................

1

6

Reliability Compliance ..........

...........................

1

6

Standards Development .......

...........................

1

6

Regional Entities, SubTotal.
Registered Entities ...............

Registered Entities, SubTotal.
Total Burden Hrs.
and Cost.

lotter on DSK11XQN23PROD with NOTICES1

Number of
respondents

113,152 hrs.;
$9,436,877..
4,160 hrs.; $346,944 ..
15,600 hrs.;
$1,301,040.
47,840 hrs.;
$3,989,856.
4,680 hrs.; $390,312 ..

4,992 hrs.;
$416,332.8.
93,600 hrs.;
$7,806,240.
287,040 hrs.;
$23,939,136.
28,080 hrs.;
$2,341,872.
7,280 hrs.; $607,152.

Other Reporting ....................

...........................

1

6

1,040 hrs.; $86,736 ....

...............................................

...........................

........................

........................

Stakeholder Survey ..............

estimated 1,496

.2

299.2

420,992 hrs.;
$35,110,732.6..
8 hrs.; $667.20 ...........

Reliability Compliance ..........

...........................

1

1,496

400 hrs.; $33,360 .......

...............................................

...........................

........................

........................

.....................................

600,793.60 hrs.;
$50,106,186.

...............................................

...........................

........................

........................

.....................................

1,134,938 hrs.;
$94,653,796.

As indicated in the table, there was a
decrease from seven to six in the
number of Regional Entities because the
Florida Reliability Coordinating Council
(FRCC) dissolved in July 2019. Other
changes from previous estimates are
based on new data in the proposed
NERC 2022 Business Plan and Budget to
reflect changes in the number of FTEs
(full-time equivalent employees)
working in applicable areas. Reviewing
the NERC Compliance database, we
determined the number of unique U.S.
entities is 1,496 (compared to the
previous value of 1,409). Lastly, in
several instances, the amount of time an
FTE devotes to a given function may
have been increased or decreased.
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
6 In instances where the number of responses per
respondent is ‘‘1,’’ the Commission Staff thinks that
the actual number of responses varies and cannot
be estimated accurately.

VerDate Sep<11>2014

17,680 hrs.;
$1,474,512.
20,800 hrs.;
$1,734,720.
4,160 hrs.; $346,944 ..

17:04 Jan 11, 2022

Jkt 256001

of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: January 5, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–00353 Filed 1–11–22; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RC11–6–014]

Notice of Filing; North American
Electric Reliability Corporation
Take notice that on November 17,
2021, the North American Electric
Reliability Corporation submitted an
annual report on the Find, Fix, Track
and Compliance Exception programs, in

PO 00000

Frm 00032

Fmt 4703

Sfmt 4703

2,393.6 hrs.;
$199,626.2.
598,400 hrs.;
$49,906,186.

accordance with the Federal Energy
Regulatory Commission’s (Commission)
Orders.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
1 See, North American Electric Reliability Corp.,
138 FERC 61,193 (2012); North American Electric
Reliability Corp., 143 FERC 61,253 (2013); North
American Electric Reliability Corp., 148 FERC
61,214 (2014); North American Electric Reliability
Corp., Docket No. RC11–6–004 (Nov. 13, 2015)
(delegated letter order).

E:\FR\FM\12JAN1.SGM

12JAN1


File Typeapplication/pdf
File Modified2022-01-12
File Created2022-01-12

© 2024 OMB.report | Privacy Policy