Burden Calculation Tables

0663t14.0.xlsx

NSPS for Beverage Can Surface Coating (40 CFR part 60, subpart WW) (Renewal)

Burden Calculation Tables

OMB: 2060-0001

Document [xlsx]
Download: xlsx | pdf

Overview

Industry
Agency
Capital and O&M


Sheet 1: Industry

Burden item (A)
Person-hours per occurrence
(B)
No. of occurrence per respondent per year
(C)
Person-hours per respondent per year
(C = A x B)
(D) Respondents per yeara (E)
Technical person-hours per year
(E = C x D)
(F)
Management person-hours per year
(E x 0.05)
(G)
Clerical person hours per year
(E x 0.1)
(H)
Cost b $

Respondent Rates
(Source: United States Department of Labor, Bureau of Labor Statistics, September 2020, “Table 2. Civilian Workers, by occupational and industry group.”)
1. Applications N/A







Labor Type Total Compensation ($/hr) Loaded Rate (Rate + 110%rate)
2. Survey and Studies N/A







Mgmt. $71.35 $149.84
3. Reporting Requirements








Tech. $58.41 $122.66
A. Familiarization with regulatory requirements 1 1 1 46 46 2.3 4.6 $6,267.07
Cler. $28.99 $60.88
B. Required activities











i. Initial Performance Test 60 1 60 0 0 0 0 $0



ii. Repeat Performance Test c 60 0.2 12 0 0 0 0 $0



C. Gather Existing Information 3B










D. Write report











i. Notification of construction/ reconstruction 2 1 2 0 0 0 0 $0



ii. Notification of initial performance test 2 1.2 2.4 0 0 0 0 $0



iii. Notification of actual startup 2 1 2 0 0 0 0 $0



iv. Report of performance test 3B










v. Semiannual report d 8 2 16 46 736 36.8 73.6 $100,273.12



vi. Excess emissions report d 5 0.5 2.5 46 115 5.75 11.5 $15,667.67



Subtotal for Reporting Requirements



1,032 $122,208



4. Recordkeeping Requirements











A. Familiarization with regulatory requirements 3A










B. Plan activities 3B










C. Implement activities (Monthly Performance Test) 1 12 12 46 552 27.6 55.2 $75,204.84



D. Develop record system N/A










i. Records of operating parameter e 0.25 250 62.5 46 2875 143.75 287.5 $391,691.87



Subtotal for Recordkeeping Requirements



3,941 $466,897



TOTAL LABOR BURDEN AND COSTS (rounded): f



4,970 $589,000



TOTAL CAPITAL AND O&M COST (rounded): f






$97,000
43 hr/resp
GRAND TOTAL (rounded): f






$686,000
















Assumptions:
























a Assumes an average of 46 affected facilities, with no new plants coming online.



b This ICR uses the following labor rates: $122.66 (technical), $149.84 (managerial), and $60.88 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2020, “Table 2. Civilian workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” They have been increased by 110 percent to account for the benefit packages available to those employed by private industry.



c Assumed 20% rate of failed performance tests.



d Each plant files an excess emission report every other year and a semiannual report twice a year.



e Assume operation 250 days per year as specified in the NSPS review document.



f Totals have been rounded to 3 significant values. Figures may not add exactly due to rounding.




Sheet 2: Agency

Activity (A)
EPA person-hours per occurrence
(B)
No. of occurrences per plant per year
(C)
EPA person-hours per plant per year
(C = A x B)
(D)
Plants per year a
(E)
Technical person-hours per year
(E = C x D)
(F)
Management person-hours per year
(E x 0.05)
(G)
Clerical person-hours per year
(E x 0.1)
(H)
Cost b $

Agency Rates
Source: Office of Personnel Management (OPM), 2021 General Schedule
1. Initial Performance Test 23 1 23 0 0 0 0 $0

Hourly Mean Wage With Fringe & Overhead
2. Repeat Performance Test c 23 1 23 0 0 0 0 $0
(GS- 12, step 1) - Tech. 32.02 $51.23
3. Report Review








(GS- 13, step 5) - Mgmt. 43.15 $69.04
A. New Plants








(GS-6, step 3) - Cler. 17.33 $27.73
i. Noification of Construction 2 1 2 0 0 0 0 $0



ii. Notification of Initial Startup 0.5 1 0.5 0 0 0 0 $0



iii. Notification of Actual Startup 0.5 1 0.5 0 0 0 0 $0



iv. Notification of Initial Test 0.5 1.2 0.6 0 0 0 0 $0



v. Review Test Results 8 1.2 9.6 0 0 0 0 $0



B. Existing Plants











i. Semiannual Reports 2 2 4 46 184 9.2 18.4 $10,572.05



ii. Excess Emissions Reports 2 0.5 1 46 46 2.3 4.6 $2,643.01



TOTAL (rounded): d



265 $13,200
















Assumptions:
























a Assumes an average of 46 affected facilities, with no new plants coming online.



b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: $69.04 Managerial rate (GS-13, Step 5, $43.15 x 1.6), $51.23 Technical rate (GS-12, Step 1, $32.02 x 1.6), and $27.73 Clerical rate (GS-6, Step 3, $17.33 x 1.6). These rates are from the Office of Personnel Management (OPM) 2021 General Schedule, which excludes locality rates of pay.



c Assumed 20% rate of failed performance tests.



d Totals have been rounded to 3 significant values. Figures may not add exactly due to rounding.




Sheet 3: Capital and O&M

6(b)(iii) Capital/Startup vs. Operation and Maintenance (O&M) Costs





Capital/Startup vs. Operation and Maintenance (O&M) Costs
(A)
Continuous Monitoring Device
(B)
Capital/Startup Cost for One Respondent
(C)
Number of New Respondents
(D)
Total Capital/ Startup Cost, (B X C)
(E)
Annual O&M Costs for One Respondent
(F)
Number of Respondents with O&M
(G)
Total O&M,
(E X F)
Temperature $8,000 0 $0 $2,100 46 $96,600
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy