Burden Calculation Tables

1055t13.xlsx

NSPS for Kraft Pulp Mills (40 CFR Part 60, Subpart BB) (Renewal)

Burden Calculation Tables

OMB: 2060-0021

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1
Table 2
O&M


Sheet 1: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Kraft Pulp Mills (40 CFR Part 60, Subpart BB) (Renewal)














Burden item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year
(C = A x B)
(D)
Respondents per year a
(E)
Technical person- hours per year
(E = C x D)
(F)
Management person hours per year
(E x 0.05)
(G)
Clerical person hours per year
(E x 0.1)
(H)
Total Cost Per year b



1. Applications N/A







Labor Rates
2. Survey and Studies N/A







Management $149.84
3. Reporting requirements








Technical $122.66
A. Familiarization with rule requirements c 1 1 1 97 97 4.9 9.7 $13,215.28
Clerical $60.88
B. Required activities










Initial performance tests d 374 1 374 0 0 0 0 $0


Repeat of performance tests e 374 0.2 74.8 0 0 0 0 $0


C. Gather existing information See 3B









D. Write Report










Notification of construction/ reconstruction 2 1 2 0 0 0 0 $0


Notification of performance test 2 1.2 2.4 0 0 0 0 $0


Notification of actual startup 2 1 2 0 0 0 0 $0


Notification of CMS demonstration 2 1 2 0 0 0 0 $0


Notification of physical changes 2 1 2 0 0 0 0 $0


Notification of opacity or visible emissions observations 2 1 2 0 0 0 0 $0


Report of performance test See 3B









Semiannual report f 8 2 16 97 1,552 77.6 155 $211,444.48


Excess emissions report g 8 2 16 97 1,552 77.6 155 $211,444.48


Subtotal for Reporting Requirements 3,681 $436,104


4. Recordkeeping requirements










A. Familiarization with rule requirements See 3A









B. Plan activities See 3A









C. Implement Activities See 3A









D. Develop record system N/A









E. Time to enter and transmit information










Records of operating parameters h 0.25 365 91.25 97 8,851 443 885 $1,205,894.30


Subtotal for Recordkeeping Requirements 10,179 $1,205,894


Total Labor Burden and Costs (rounded) j



13,900 $1,640,000


Total Capital and O&M Cost (rounded) j






$4,010,000


GRAND TOTAL (rounded) j 13,900 $5,650,000
Responses 388










Hours/response 36
Assumptions:










a We have assumed an average of 97 existing respondents per year over the next three years. No new respondents are anticipated over the next three years.


b This ICR uses the following labor rates: $122.66 (technical), $149.84 (managerial), and $60.88 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2020, “Table 2. Civilian workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” They have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


c We have assumed that each source will re-familiarize with the requirements each year.


d We have assumed that it will take 374 hours for each new respondent to perform the initial performance test.


e We have assumed that 20 percent of respondents would repeat performance test due to failure.


f We have assumed that all respondents will each take eight hours to complete the semiannual report.


g We have assumed that each respondent will take eight hours to two times per year to complete the excess emissions report.


h We have assumed that it will take each respondent 15 minutes per day to record operating parameters.


i Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 2: Table 2

Table 2: Average Annual EPA Burden and Cost - NSPS for Kraft Pulp Mills (40 CFR Part 60, Subpart BB) (Renewal)














Activity (A) (B) (C) (D) (E) (F) (G) (H)


EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year (C=AxB) Plants per year a Technical person- hours per year (E=CxD) Management person-hours per year (Ex0.05) Clerical person-hours per year (Ex0.1) Cost, $ b


Initial performance test (new plant) c 24 1 24 0 0 0 0 $0
Labor Rates
Repeat performance test (new plant) d 24 0.2 4.8 0 0 0 0 $0
Management $69.04
Review reports (new plant)








Technical $51.23
Notification of construction 2 1 2 0 0 0 0 $0
Clerical $27.73
Notification of performance test 2 1.2 2.4 0 0 0 0 $0


Notification of actual startup 0.5 1 0.5 0 0 0 0 $0


Notification of CMS demonstration 0.5 1 0.5 0 0 0 0 $0


Notification of physical/operational changes 0.5 1 0.5 0 0 0 0 $0


Notification of opacity or visible emissions observations 0.5 1 0.5 0 0 0 0 $0


Review test results 8 1.2 9.6 0 0 0 0 $0


Existing plants










Semiannual report and excess emissions report e 4 2 8 97 776 38.8 77.6 $44,585.08


TOTAL (rounded) f 892 $44,600














Assumptions:










a We have assumed an average of 97 existing respondents per year over the next three years. No new respondents are anticipated over the next three years.


b This ICR uses the following labor rates: $51.23 (technical), $69.04 (managerial), and $27.73 (clerical). These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c We have assumed that it will take twenty-four hours for the Agency to observe the initial performance test.


d We have assumed that 20 percent of respondents would repeat performance test due to failure and that it will take twenty-four hours for Agency observation of a repeat of the performance test due to failure.


e We have assumed that it will take the Agency four hours to review the semiannual report and the excess emissions report.


f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 3: O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs


(A) (B) (C) (D) (E) (F) (G)


Continuous Monitoring Device Capital/Startup Cost for One Respondent a Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent a Number of Respondents with O&M Total O&M, (ExF)
CEPCI Index
Opacity monitor $45,695 0 $0 $9,824 97 $952,960
Year Index
TRS monitor $123,375 0 $0 $26,274 97 $2,548,615
2009 521.9
Incinerator temperature monitor $9,824 0 $0 $5,255 97 $509,723
2020 596.2
Scrubber liquid supply pressure monitor $400 0 $0 $0 0 $0


Scrubber liquid flow rate monitor $17,707 0 $0 $0 0 $0


Total

$0

$4,010,000


a Capital/Startup and Annual O&M costs have been updated from 2009 to 2020 using the CEPCI Index.






















Number of Respondents




Respondents That Submit Reports Respondents That Do Not Submit Any Reports






(A) (B) (C) (D) (E)



Year Number of New Respondents a Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents (E=A+B+C-D)



1 0 97 0 0 97



2 0 97 0 0 97



3 0 97 0 0 97



Average 0 97 0 0 97























Total Annual Responses




(A) (B) (C) (D) (E)




Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses E=(BxC)+D




Notification of construction or modification 0 1 0 0




Notification of actual startup 0 1 0 0




Notification of performance test 0 1.2 0 0




Notification of CMS demonstration 0 1 0 0




Notification of physical or operational changes 0 1 0 0




Notification of opacity or visible emission observations 0 1 0 0




Report of performance test 0 1.2 0 0




Semiannual report 97 2 0 194




Excess emissions report 97 2 0 194







Total 388




File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy