Number of Respondents | |||||
Respondents That Submit Reports | Respondents That Do Not Submit Any Reports | ||||
(A) | (B) | (C) | (D) | (E) | |
Year | Number of New Respondents | Number of Existing Respondents | Number of Existing Respondents that keep records but do not submit reports | Number of Existing Respondents That Are Also New Respondents | Number of Respondents |
(E=A+B+C-D) | |||||
1 | 1 | 19 | 0 | 1 | 19 |
2 | 1 | 19 | 0 | 1 | 19 |
3 | 1 | 19 | 0 | 1 | 19 |
Average | 1 | 19 | 0 | 1 | 19 |
Total Annual Responses | ||||
(A) Information Collection Activity |
(B) Number of Respondents |
(C) Number of Responses |
(D) Number of Existing Respondents That Keep Records But Do Not Submit Reports |
(E) Total Annual Responses E=(BxC)+D |
Notification of construction/reconstruction | 0 | 1 | 0 | 0 |
Notification of applicability | 0 | 1 | 0 | 0 |
Notification of anticipated startup | 0 | 1 | 0 | 0 |
Notification of actual startup | 0 | 1 | 0 | 0 |
Notification of process changes | 1 | 1 | 0 | 1 |
Pre-compliance plan | 1 | 1 | 0 | 1 |
Notification of initial performance test | 1 | 1 | 0 | 1 |
Notification of initial CMS performance evaluation | 1 | 1 | 0 | 1 |
CMS evaluation with performance test | 0.9 | 1 | 0 | 0.9 |
CMS evaluation without performance test | 0.1 | 1 | 0 | 0.1 |
Semiannual report | 17 | 2 | 0 | 34 |
Quarterly report | 2 | 4 | 0 | 8 |
Emissions averaging plan | 2 | 1 | 0 | 2 |
Total | 49 |
Table 1: Annual Respondent Burden and Cost – NESHAP for Pesticide Active Ingredient Production (40 CFR Part 63, Subpart MMM) (Renewal) | |||||||||||
Burden item | A | B | C | D | E | F | G | H | TECH | $122.20 | |
Person-hours per occurrence |
Annual occurrences per respondent |
Person-hours per respondent per year (AxB) |
Respondents per year a |
Technical hours per year (CxD) |
Management hours per year (Ex0.05) | Clerical hours per year (Ex0.10) |
Annual Cost ($) b |
MGMT | $153.55 | ||
1. Applications | N/A | CLER | $61.51 | ||||||||
2. Surveys and studies | N/A | ||||||||||
3. Reporting requirements | |||||||||||
A. Familiarization with Regulatory Requirements | 2 | 1 | 2 | 19 | 38 | 2 | 4 | $5,169.08 | Source Type | No. | |
B. Required activities | Existing | 19 | |||||||||
Performance evaluation test (CMS certification) | 13 | 6 | 78 | 1 | 78 | 4 | 8 | $10,610 | Modified | 0 | |
C. Create information | See 3B | New | 1 | ||||||||
D. Gather existing information | See 3E | ||||||||||
E. Write report | |||||||||||
Notification and application of construction/reconstruction c | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of applicability c | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of anticipated startup c | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of actual startup c | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of process changes d | 8 | 1 | 8 | 1 | 8 | 0.4 | 0.8 | $1,088.23 | |||
Pre-compliance report c | 40 | 1 | 40 | 1 | 40 | 2 | 4 | $5,441 | |||
Notification of initial performance test c | 2 | 1 | 2 | 1 | 2 | 0 | 0 | $272 | |||
Notification of initial CMS performance evaluation c | 2 | 1 | 2 | 1 | 2 | 0 | 0 | $272 | |||
CMS evaluation with performance test c, e | 80 | 1 | 80 | 0.9 | 72 | 4 | 7 | $9,794 | |||
CMS evaluation without performance test c, f | 120 | 1 | 120 | 0.1 | 12 | 1 | 1 | $1,632 | |||
Periodic reporting | |||||||||||
Semiannual report g | 8 | 2 | 16 | 17 | 272 | 13.6 | 27.2 | $36,999.75 | |||
Quarterly report h | 24 | 4 | 96 | 2 | 192 | 9.6 | 19.2 | $26,117.47 | |||
Emissions averaging plan i | 40 | 1 | 40 | 2 | 80 | 4 | 8 | $10,882.28 | |||
PRD reportingk | 5.5 | 2 | 11 | 19 | 209 | 10.5 | 20.9 | $28,429.96 | |||
LDAR reportingk | 94 | 2 | 188 | 19 | 3,572 | 178.6 | 357.2 | $485,893.80 | |||
Subtotal for Reporting Requirements | 5,264 | $622,602 | |||||||||
4. Recordkeeping requirements | |||||||||||
A. Familiarization with Regulatory Requirements | See 3A | ||||||||||
B. Plan activities | N/A | ||||||||||
C. Implement activities | N/A | ||||||||||
D. Develop record system c | 40 | 1 | 40 | 1 | 40 | 2 | 4 | $5,441 | |||
E. Develop QA/QC plan for CMS c | 40 | 1 | 40 | 1 | 40 | 2 | 4 | $5,441 | |||
F. Time to enter information | |||||||||||
Records of excess emissions | 1.5 | 52 | 78 | 1 | 78 | 4 | 8 | $10,610 | |||
Records of CMS data | |||||||||||
Record continuously monitored parameters j | 1 | 320 | 320 | 19 | 6,080 | 304 | 608 | $827,053.28 | |||
Enter/verify information for periodic report | 16 | 2 | 32 | 19 | 608 | 30.4 | 60.8 | $82,705.33 | |||
G. CMS calibration c | 48 | 1 | 48 | 1 | 48 | 2 | 5 | $6,529 | |||
H. Train personnel c | 40 | 1 | 40 | 1 | 40 | 2 | 4 | $5,441 | |||
I. Audits | N/A | ||||||||||
Subtotal for Recordkeeping Requirements | 7,974 | $943,000 | |||||||||
TOTAL ANNUAL BURDEN AND COST (ROUNDED)l | 13,200 | $1,570,000 | |||||||||
TOTAL CAPITAL AND O&M COST (rounded)l | $339,000 | ||||||||||
GRAND TOTAL (rounded)l | $1,910,000 | ||||||||||
269 hrs/resp | |||||||||||
a On average, EPA estimates 19 existing sources will be subject to the NESHAP. No new sources will become subject to the standard over the three-year period of this ICR. | |||||||||||
b This ICR uses the following labor rates: $122.20 (technical), $153.55 (managerial), and $61.51 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2021, “Table 2. Civilian workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” They have been increased by 110 percent to account for the benefit packages available to those employed by private industry. | |||||||||||
c Applies to new or reconstructed sources only. However, based on comments received from Corteva, we assume one existing source per year will install a new process unit and would be required to conduct certain activities, including submit an updated pre-compliance report, notifications of initial performance test or performance evaluation, update record management systems, and develop of a QA/QC plan for CMS. | |||||||||||
d EPA assumes 5 percent of existing facilities (19 x 0.05 = 1, after rounding) will implement process changes. | |||||||||||
e EPA assumes 90 percent of new sources will comply by conducting performance testing. | |||||||||||
f EPA assumes 10 percent of new sources will comply by submitting engineering calculations, designing calculations, and CMS performance evaluation results. | |||||||||||
g EPA assumes 90 percent of sources (19 x 0.9 = 17, after rounding) will have no exceedances and periods of noncompliance; therefore, they will submit periodic reports on a semiannual basis. | |||||||||||
h EPA assumes 10 percent of sources (19 x 0.1 = 2, after rounding) will have exceedances and periods of noncompliance; therefore, they will submit periodic reports on a quarterly basis. | |||||||||||
i EPA assumes 10 percent of existing sources will comply with emissions averaging requirements. New sources are not allowed to use emissions averaging. | |||||||||||
j EPA assumes it will take 1 hour, 320 times per year, to record continuously monitored parameter data. | |||||||||||
k Pressure Relief Device (PRD) reporting and Leak Detection and Repair (LDAR) reporting are submitted with the semiannual report. | |||||||||||
l Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Table 2: Average Annual EPA Burden and Cost – NESHAP for Pesticide Active Ingredient Production (40 CFR Part 63, Subpart MMM) (Renewal) | |||||||||||
Burden item | A | B | C | D | E | F | G | H | TECH | $51.23 | |
EPA person-hours per occurrence |
Annual occurrences per respondent |
EPA person-hours per respondent per year (AxB) |
Respondents per year a |
Technical hours per year (CxD) |
Management hours per year (Ex0.05) |
Clerical hours per year (Ex0.10) |
Annual cost ($) b |
MGMT | $69.04 | ||
Initial performance test | 40 | 1 | 40 | 1 | 40 | 2 | 4 | $2,298 | CLER | $27.73 | |
Repeat performance test c | 40 | 1 | 40 | 0.2 | 8 | 0 | 1 | $460 | |||
Performance evaluation test (CMS certification) d | 2 | 6 | 12 | 0.1 | 1 | 0 | 0 | $69 | |||
Report review | |||||||||||
Notification of construction/reconstruction | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of applicability | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of anticipated startup | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of actual startup | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of process changes e | 8 | 1 | 8 | 1 | 8 | 0.4 | 0.8 | $459.64 | |||
Pre-compliance plan | 4 | 1 | 4 | 1 | 4 | 0 | 0 | $230 | |||
Notification of initial performance test | 2 | 1 | 2 | 1 | 2 | 0 | 0 | $115 | |||
Notification of initial CMS performance evaluation | 2 | 1 | 2 | 1 | 2 | 0 | 0 | $115 | |||
CMS evaluation with performance test f | 40 | 1 | 40 | 0.9 | 36 | 2 | 4 | $2,068 | |||
CMS evaluation without performance test g | 40 | 1 | 40 | 0.1 | 4 | 0 | 0 | $230 | |||
Semiannual report h | 2 | 2 | 4 | 17 | 68 | 3.4 | 6.8 | $3,906.94 | |||
Quarterly report i | 8 | 4 | 32 | 2 | 64 | 3.2 | 6.4 | $3,677.12 | |||
Emissions averaging plan j | 20 | 1 | 20 | 2 | 40 | 2 | 4 | $2,298.20 | |||
TOTAL ANNUAL BURDEN AND COST (ROUNDED)k | 319 | $15,900 | |||||||||
a On average, EPA estimates 19 existing sources will be subject to the NESHAP. No new sources will become subject to the standard over the three-year period of this ICR. However, based on comments received from Corteva, we assume one existing source per year will install a new process unit. | |||||||||||
b This ICR uses the following labor rates: $51.23 (technical), $69.04 (managerial), and $27.73 (clerical). These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. | |||||||||||
c EPA assumes five percent of new sources will repeat performance testing. | |||||||||||
d EPA assumes Agency personnel will attend ten percent of evaluation tests. | |||||||||||
e EPA assumes 5 percent of existing facilities (19 x 0.05 = 1, after rounding) will implement process changes. | |||||||||||
f EPA assumes 90 percent of new sources will comply by conducting performance testing. | |||||||||||
g EPA assumes 10 percent of new sources will comply by submitting engineering calculations, designing calculations, and CMS performance evaluation results. | |||||||||||
h EPA assumes 90 percent of sources (19 x 0.9 = 17, after rounding) will have no exceedances and periods of noncompliance; therefore, they will submit periodic reports on a semiannual basis. | |||||||||||
i EPA assumes 10 percent of sources (19 x 0.1 = 2, after rounding) will have exceedances and periods of noncompliance; therefore, they will submit periodic reports on a quarterly basis. | |||||||||||
j EPA assumes 10 percent of existing sources will comply with emissions averaging requirements. New sources are not allowed to use emissions averaging. | |||||||||||
k Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | ||
Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents a | Total Capital/Startup Cost, (B X C) | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, | ||
(E X F) | ||||||||
PRD Electronic Indicators b | $11,632 | 1 | $11,632 | $2,825 | 19 | $53,675 | ||
Performance Tests | $52,200 | 1 | $52,200 | $0 | 0 | $0 | ||
Process Vents CMSc | $15,920 | 1 | $15,920 | $1,220 | 19 | $23,180 | ||
Wastewater CMSd | $10,690 | 1 | $10,690 | $9,038 | 19 | $171,722 | ||
Total (rounded) | $90,400 | $249,000 | $339,000 | |||||
a On average, EPA estimates 19 existing sources will be subject to the NESHAP and no new sources will become subject to the standard over the three-year period of this ICR. However, based on comments received from Corteva, we assume one existing source per year will install a new process unit. | ||||||||
b Based on comments received from Corteva, we assume a cost of $2,825 annually per respondent for annual PRD monitoring. | ||||||||
c Based on comments received from Corteva, we assume approximately 10 hours of technical labor for programming time, correct instrumentation, and calibrations, or $1,220 per respondent annually. | ||||||||
d Based on comments received from Corteva, we assume a cost of $9,038 annually per respondent for calibration and maintenance for the treatment device and associated control devices and operating parameters. |
File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |