30-day FRN

30-Day FRN 1-21-22 (2).pdf

Aircraft Services Flight Request

30-day FRN

OMB: 1910-5196

Document [pdf]
Download: pdf | pdf
Federal Register / Vol. 87, No. 14 / Friday, January 21, 2022 / Notices
DEPARTMENT OF ENERGY
Proposed Agency Information
Collection: Aircraft Services—Flight
Request
Bonneville Power
Administration, Department of Energy.
ACTION: Notice of information collection;
request for comments.
AGENCY:

The Bonneville Power
Administration (BPA), Department of
Energy (DOE), invites public comment
on a collection of information that BPA
is developing for submission to the
Office of Management and Budget
(OMB) pursuant to the Paperwork
Reduction Act of 1995.
DATES: Comments regarding this
proposed information collection must
be received on March 14, 2022.
ADDRESSES: Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to www.reginfo.gov/public/do/
PRAMain. Find this particular
information collection by selecting
‘‘Currently under 30-day Review—Open
for Public Comments’’ or by using the
search function.
FOR FURTHER INFORMATION CONTACT:
Requests for additional information or
copies of the information collection
instrument and instructions should be
directed to Attn: Theodore Rydmark,
Privacy Program, or by email at
[email protected] or at 503–230–5253.
SUPPLEMENTARY INFORMATION:
Comments are invited on: (a) Whether
the proposed collection of information
is necessary for the proper performance
of the functions of the agency, including
whether the information shall have
practical utility; (b) the accuracy of the
agency’s estimate of the burden of the
proposed collection of information,
including the validity of the
methodology and assumptions used; (c)
ways to enhance the quality, utility, and
clarity of the information to be
collected; and (d) ways to minimize the
burden of the collection of information
on respondents, including through the
use of automated collection techniques
or other forms of information
technology.
This information collection request
contains:
(1) OMB No.: New;
(2) Information Collection Request
Title: Aircraft Services—Flight Request;
(3) Type of Request: New;
(4) Purpose: This information
collection is associated with BPA’s
management and oversight of personnel
flying on BPA planes and helicopters.

jspears on DSK121TN23PROD with NOTICES1

SUMMARY:

VerDate Sep<11>2014

17:39 Jan 20, 2022

Jkt 256001

Employees, non-employees, contractors,
and the general public complete the
following form: BPA F 4450.01e Flight
Request;
(5) Estimated Number of
Respondents: 650;
(6) Annual Estimated Number of
Responses: 650;
(7) Annual Estimated Number of
Burden Hours: 65;
(8) Annual Estimated Reporting and
Recordkeeping Cost Burden: 2505.43.
Statutory Authority: 42 U.S.C. 7101, et
seq., 41 CFR 301–70.905, 14 CFR
91.103, 14 CFR 91.1027(c)(1–4).
Signing Authority: This document of
the Department of Energy was signed on
January 14, 2022, by Candice D. Palen,
Information Collection Clearance
Manager, Bonneville Power
Administration, pursuant to delegated
authority from the Secretary of Energy.
That document with the original
signature and date is maintained by
DOE. For administrative purposes only,
and in compliance with requirements of
the Office of the Federal Register, the
undersigned DOE Federal Register
Liaison Officer has been authorized to
sign and submit the document in
electronic format for publication, as an
official document of the Department of
Energy. This administrative process in
no way alters the legal effect of this
document upon publication in the
Federal Register.
Signed in Washington, DC, on January 18,
2022.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2022–01144 Filed 1–20–22; 8:45 am]
BILLING CODE 6450–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–38–000]

Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on January 7, 2022,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
1300, Houston, TX 77002–2700 filed in
the above referenced docket a prior
notice pursuant to sections 157.205 and
157.216 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act (NGA),
requesting authorization to abandon one
injection/withdrawal well and
associated pipelines and appurtenances,
located in its Weaver Storage Field in,

PO 00000

Frm 00014

Fmt 4703

Sfmt 4703

3291

Richland County, Ohio. Columbia
proposes to abandon these facilities
under authorities granted by its blanket
certificate issued in Docket No. CP83–
76–000.1 The proposed abandonments
will have no impact on Columbia’s
existing customers or affect Columbia’s
existing storage operations. The
estimated cost for the Project is
approximately $1.75 million, all as more
fully set forth in the request which is on
file with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (http://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
[email protected] or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to David
A. Alonzo, Manager, Project
Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 1300, Houston, Texas,
77002–2700, at (832) 320–5477 or
[email protected].
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,2 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
1 Columbia Gas Transmission Corporation
(predecessor to Columbia Gas Transmission, LLC),
22 FERC 62,029 (1983).
2 18 CFR (Code of Federal Regulations) § 157.9.

E:\FR\FM\21JAN1.SGM

21JAN1


File Typeapplication/pdf
File Modified2022-01-21
File Created2022-01-21

© 2024 OMB.report | Privacy Policy