pdfFederal Register / Vol. 86, No. 176 / Wednesday, September 15, 2021 / Notices
all laws under which such actions were
taken, including but not limited to:
1. NEPA;
2. Council on Environmental Quality
regulations (1978); 2
3. Fixing America’s Surface
Transportation Act (FAST Act);
4. Department of Transportation Act
of 1966, Section 4(f);
5. Land and Water Conservation Fund
(LWCF) Act of 1965, Section 6(f);
6. Clean Air Act Amendments of
1990;
7. Clean Water Act of 1977 and 1987;
8. Endangered Species Act of 1973;
9. Migratory Bird Treaty Act;
10. National Historic Preservation Act
of 1966, as amended;
11. Executive Order 11990, Protection
of Wetlands;
12. Executive Order 11988,
Floodplain Management;
13. Executive Order 12898, Federal
Actions to Address Environmental
Justice in Minority Populations and
Low-Income Populations;
14. Executive Order 13112, Invasive
Species.
Issued in Washington, DC.
Jamie P. Rennert,
Director, Office of Infrastructure Investment.
[FR Doc. 2021–19914 Filed 9–14–21; 8:45 am]
BILLING CODE 4910–06–P
DEPARTMENT OF TRANSPORTATION
Office of the Secretary
[Docket No. DOT–OST–2021–0104]
Agency Request for Approval of a New
Information Collection(s):
Disadvantaged Business Enterprise
(DBE) Program Requirements
Office of the Secretary,
Department of Transportation.
ACTION: Notice and request for
comments.
AGENCY:
The Department of
Transportation (DOT or Department)
invites public comments about our
intention to request the Office of
Management and Budget’s (OMB)
approval for an information collection
for the Department’s Disadvantaged
Business Enterprise (DBE) program. The
information collected is necessary to
khammond on DSKJM1Z7X2PROD with NOTICES
SUMMARY:
2 The Council on Environmental Quality (CEQ)
issued new regulations on July 14, 2020, effective
September 14, 2020, updating the NEPA
implementing procedures at 40 CFR parts 1500
through 1508. However, this project initiated NEPA
before the effective date and relies on the CEQ
regulations as they existed prior to September 14,
2020. All subsequent citations to the CEQ
regulations in the ROD and Final EIS refer to the
1978 regulations, consistent with 40 CFR 1506.13
(2020) and the preamble at 85 FR 43340.
VerDate Sep<11>2014
17:08 Sep 14, 2021
Jkt 253001
maintain successful implementation of
the DBE program, as it helps ensure that
state and local recipients of DOT funds
carry out the program’s mission of
providing a level playing field for small
businesses owned and controlled by
socially and economically
disadvantaged individuals. We are
required to publish this notice in the
Federal Register by the Paperwork
Reduction Act of 1995 (PRA).
DATES: Written comments should be
submitted by October 15, 2021.
ADDRESSES: You may submit comments
[identified by Docket No. DOT–OST–
2021–0104] through one of the
following methods:
• Federal eRulemaking Portal: http://
www.regulations.gov. Follow the online
instructions for submitting comments.
• Fax: (202) 493–2251.
• Mail or Hand Delivery: Docket
Management Facility, U.S. Department
of Transportation, 1200 New Jersey
Avenue SE, West Building, Room W12–
140, Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through
Friday, except on Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Marc D. Pentino, (202)366–6968,
[email protected] or Aarathi Haig,
[email protected]/Departmental
Office of Civil Rights, Office of the
Secretary, U.S. Department of
Transportation, 1200 New Jersey
Avenue SE, Washington, DC 20590.
SUPPLEMENTARY INFORMATION: To assist
in estimating the potential paperwork
burden of these collections, the
Department reached out to a small
number of stakeholders to gain a general
understanding of how much time they
spend each year responding to these
collections. However, the stakeholder
responses varied so significantly that we
are concerned the responses blur lines
between what aspects of the program are
specifically information collections
versus more general requirements of the
program. To help commenters provide
information that will better allow the
Department to include the appropriate
paperwork burden within this
collection, we offer the following
clarifications. A ‘‘collection of
information’’ is defined as ‘‘the
obtaining, causing to be obtained,
soliciting, or requiring the disclosure to
an agency, requiring the disclosure to an
agency, third parties or the public of
information by or for an agency by
means of identical questions posed to,
or identical reporting, recordkeeping, or
disclosure requirements imposed on,
ten or more persons.’’ 5 CFR
1320.3(c)(1). The activities that
constitute the ‘‘burden’’ associated with
a collection are defined in 5 CFR
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
51439
1320.3(b)(1) as ‘‘the total time, effort, or
financial resources expended by persons
to generate, maintain, retain, or disclose
or provide information to or for a
Federal agency.’’ Importantly, this
burden is not necessarily the same as
the entire regulatory burden for a
program or an aspect of a program. For
example, if a regulation requires an
inspection and the completion of a form
documenting the inspection, the full
regulatory burden would likely include
both actions, while the paperwork
burden would only include the time and
other resources needed to complete the
form.
In addition, the Department believes
certain recordkeeping requirements
have not been adequately accounted for
in the current collection. As stated in 5
CFR 1320(m), ‘‘Recordkeeping
requirement means a requirement
imposed by or for an agency on persons
to maintain specified records, including
a requirement to: (1) Retain such
records; (2) Notify third parties, the
Federal government, or the public of the
existence of such records; (3) Disclose
such records to third parties, the Federal
government, or the public; or (4) Report
to third parties, the Federal government,
or the public regarding such records.’’
Thus, recordkeeping requirements can
attach to records that are not necessarily
covered by the PRA itself if, as in the
DBE program, a requirement exists to
maintain a complete case file. In that
case, as the case file itself is not
standardized, it would not be
considered an information collection
and the burden associated with
developing the file would not be a
paperwork burden. However, the
requirement to keep that case file and,
upon request, submit it to the
Department, would be part of the
paperwork burden.
For purposes of this 30-day notice, we
have included the burden estimates we
received from the small number of
stakeholders we contacted as well as
from the seven comments we received
from the 60-day notice published in the
Federal Register on June 15, 2021. As
noted above, the Department is
concerned that at least several of these
estimates contain burdens associated
with aspects of the program that are not
paperwork burdens. To the extent
feasible, the Department requests that
commenters who provide burden
estimates for aspects of the program
identified below be as specific as
possible, including what amount of time
each task takes and what, if any,
additional costs beyond labor costs (e.g.,
copying, mailing, storage, or other
technology costs) are associated with
each aspect of the collection.
E:\FR\FM\15SEN1.SGM
15SEN1
51440
Federal Register / Vol. 86, No. 176 / Wednesday, September 15, 2021 / Notices
OMB Control Number: N/A.
Title: Disadvantaged Business
Enterprise (DBE) Program Requirements.
Form Numbers: N/A.
Type of Review: Initial Approval of
Existing Information Collection.
khammond on DSKJM1Z7X2PROD with NOTICES
1. Maintain Bidders Lists
Section 26.11 and Appendix B of the
DBE regulation require recipients to
maintain a bidders list. The purpose of
the list is to provide recipients the most
accurate data possible about the
universe of DBE and non-DBE
contractors and subcontractors who seek
to work on federally-assisted contracts.
Recipients use the bidders lists to more
accurately determine the availability of
DBE and non-DBE firms and to measure
the relative availability of ready,
willing, and able DBEs when setting
their overall goals under § 26.45. The
data on a bidders list includes each
firm’s name, address, DBE status, age,
and approximate annual gross receipts.
The annual burden hours we received
from six stakeholder responses ranged
from 3–915 hours. The total estimated
annual cost burden we received from
four stakeholder responses ranged from
$360–$35,000. Although the Department
acknowledges the wide range of
recipients that must comply with this
requirement, it seems unlikely that a
fulltime employee dedicates half of his
or her time each year to this task, as
these lists are only updated three times
per year for each recipient. Thus, the
Department believes that the total
annual burden per recipient is likely
towards the lower end of the estimates
we received.
Respondents: State and local
recipients of DOT funds.
Number of Respondents: 1,198 (592
Federal Aviation Administration (FAA)
recipients, 53 Federal Highway
Administration (FHWA) recipients, 553
Federal Transit Administration (FTA)
recipients).
Frequency: 3 times per year, although
recipients have significant flexibility
under § 26.11 to determine how often
they update their bidders lists.
Number of Responses: 3,594.
Total Annual Burden: 636 hours and
$30,000.
2. Maintaining DBE Directories
Section 26.81(g) requires recipients to
maintain an electronic DBE directory.
Section 26.31 mandates that each
directory listing include the firm’s
address, phone number, and the types of
work the firm has been certified to
perform as a DBE, using the most
specific North American Industry
Classification System (NAICS) code
available to describe each type of work.
VerDate Sep<11>2014
17:08 Sep 14, 2021
Jkt 253001
The primary purpose of the directory is
to show the results of the certification
process, i.e., all firms that the recipient
has certified. Prime contractors use the
information to find potential DBE
subcontractors.
The total annual burden hours we
received from the five stakeholder
responses ranged from 10–1,300 hours.
The total annual cost burden we
received from four stakeholder
responses ranged from $240–$79,800.
As with the above, the Department is
concerned that the high estimate
includes burden beyond the paperwork
requirement of updating and
maintaining the directory, though the
Department believes the lower value of
10 hours may be insufficient for our
larger stakeholders.
The General Contractors Association
of New York (GCANY) commented that
a requirement for recipients to include
a detailed business description of each
DBE in the directories would help prime
contractors to conduct more targeted
and meaningful outreach to DBEs.
GCANY did not give examples of what
additional details should be included
beyond those that recipients already
provide. The trade association American
Road & Transportation Builders
(ARTBA) commented that DBE
directories in their current form should
be improved, but did not provide
specific suggestions.
Respondents: State and local
recipients of DOT funds that perform
DBE certification.
Number of Respondents: 132.
Frequency: Monthly, i.e., 12 times
each year.
Number of Responses: 1,584.
Total Annual Burden: 4,500 hours
and $426,000.
3. Monitoring the Performance of DBE
Program Participants
Section 26.37 requires recipients to
implement monitoring mechanisms to
ensure that all DBE program
participants comply with the
regulation’s requirements. There are two
required mechanisms: (1) Written
certification that recipients have
reviewed contracting records and
monitored work sites in their state for
this purpose, and (2) a running tally of
actual DBE attainments. If a DOT
Operating Administration (OA)
conducts a compliance review or
investigation, it checks to see if the
recipient has the written certifications
and tallies; recipients do not otherwise
submit the information. Recipients
collect the information so they can
confirm at project sites that the DBE to
whom the work was committed is in
fact performing the work.
PO 00000
Frm 00103
Fmt 4703
Sfmt 4703
The total estimated annual burden
hours we received from the six
stakeholder responses ranged from 45–
2000 hours. The total annual cost
burden was calculated based on the
average of four stakeholder responses
ranging from $10,000–$80,000. The
Department believes that it is likely that
the stakeholders who provided the
higher numbers were basing their
response on the substantive monitoring
requirement rather than the paperwork
specific requirements.
In response to the Department’s 60day Federal Register notice, the
Associated General Contractors of Texas
(AGCT) commented that there is much
fluctuation in the amount of time it
takes to report DBE payments, with a
range of 36–2,500 annual hours to
gather and report the necessary data.
AGCT attributes the difficulties
involved to flaws in the Texas DOT’s
DBE management software.
Respondents: State and local
recipients of DOT funds.
Number of Respondents: 1,198 (592
FAA recipients, 53 FHWA recipients,
553 FTA recipients).
Frequency: 36 times each year (3
times per month).
Number of Responses: 43,128.
Total Annual Burden: 28,224 hours
and $42,250.
4. Addressing Overconcentration of
DBEs in Certain Types of Work
Section 26.33 contemplates a
situation in which DBEs in a certain
work type are so prevalent that they
unduly burden the ability of non-DBE
firms to participate in those work types.
If a recipient determines that
overconcentration of DBEs exists in
certain types of work, the recipient must
submit to the appropriate OA the
reasons for the determination and the
measures devised to address it. The
recipient must review and analyze
actual data concerning an
overconcentration allegation to
determine if it supports a finding of
overconcentration. The OA have never
received submittals of
overconcentration determinations from
recipients. ARTBA commented that
overconcentration of DBEs in the
trucking industry is well known and
that better data is needed to inform the
Department, recipients, and others to
develop new DBE firms within
industries where they are needed.
ARTBA did not specify what type(s) of
data might be helpful; thus, the
Department cannot estimate what the
burden impact would be of collecting
additional data.
Respondents: State and local
recipients of DOT funds.
E:\FR\FM\15SEN1.SGM
15SEN1
Federal Register / Vol. 86, No. 176 / Wednesday, September 15, 2021 / Notices
Number of Respondents: 1,198 (592
FAA recipients, 53 FHWA recipients,
553 FTA recipients).
Frequency: Zero.
Number of Responses: Zero.
Total Annual Burden: Zero.
khammond on DSKJM1Z7X2PROD with NOTICES
5. Setting Overall Goals for DBE
Participation in DOT-Assisted
Contracts
Congress carefully considered and
concluded that race-neutral means alone
insufficient to remedy the effects of
discrimination in DOT-assisted
contracting. Thus, § 26.45 mandates
that, in three-year intervals, recipients
set and submit to DOT an overall goal
for DBE participation in DOT-assisted
contracts based on the availability of
DBE firms compared to all firms in each
recipient’s DOT-assisted contracting
market. Recipients must include with
their overall goal submission a
description of the methodology they
used to establish the goal and a
projection of the portions of the overall
goal that they expect to meet through
race-neutral and race-conscious means.
The total annual burden hours below
were calculated based on the average of
six stakeholder responses ranging from
16–500 hours. The total annual cost
burden was calculated based on the
average of four stakeholder responses
ranging from $2,300–$50,000. The
Department notes that the paperworkspecific burden does not apply to all the
work that goes into the goal setting
process, but rather only to those aspects
of that work that is related to the
submission of goals.
Respondents: State and local
recipients of DOT funds.
Number of Respondents: 1,198 (592
FAA recipients, 53 FHWA recipients,
553 FTA recipients).
Frequency: Triennially.
Number of Responses: 1,198.
Total Annual Burden: 47 hours and
$5,400.
6. Analyzing Discrepancies Between
Uniform Report Data and Recipients’
Overall Goals
Section 26.47(c) mandates that if the
awards and commitments shown on a
recipient’s Uniform Report at the end of
any fiscal year are less than the overall
goal applicable to that fiscal year, the
recipient must, in order to be regarded
by the Department as implementing the
DBE program in good faith, (1) analyze
in detail the reasons for the difference
between the overall goal and awards
and commitments in that fiscal year,
and (2) establish specific steps and
milestones to correct the problems the
recipient identified in the analysis and
to enable the recipient to meet fully the
VerDate Sep<11>2014
17:08 Sep 14, 2021
Jkt 253001
goal for the new fiscal year. If the
recipient is a state highway agency, one
of the 50 largest transit authorities as
determined by the FTA, or an
Operational Evolution Partnership Plan
airport or other airport designated by
the FAA, the recipient must submit,
within 90 days of the end of the fiscal
year, an analysis and corrective action
plan to the appropriate OA for approval.
A transit authority or airport not
meeting the criteria of § 26.47(c)(3)(i)
must retain analysis and corrective
actions in its records for three years and
make it available to the FTA or FAA on
request.
The total annual burden hours we
received from seven stakeholder
responses ranged from 3–2,000 hours.
The total annual cost burden was
calculated based on the average of five
stakeholder responses ranging from
$450–$80,000. The Department is
concerned that the higher numbers
account for aspects of the program
beyond the narrow collection in this
requirement.
Respondents: State and local
recipients of DOT funds.
Number of Respondents: 450.
Frequency: Annually or triennially
depending on which OA provided the
funds.
Number of Responses: 450.
Total Annual Burden: 650 hours and
$36,650 per respondent.
7. Requiring Transit Vehicle
Manufacturers (TVMs) To Comply With
the DBE Regulation’s Goal Setting
Requirements
Under § 26.49, FTA funding
recipients must require that each TVM,
as a condition of being authorized to bid
or propose on FTA-assisted transit
vehicle procurements, certify that it has
complied with the regulation’s goal
setting requirements. TVMs must
establish and submit for the FTA’s
approval an annual overall percentage
goal that is narrowly tailored and
specific to its market area. The FTA
reviews the goal setting methodologies
to ensure that they are developed
pursuant to regulatory requirements and
the Department’s official guidance. In
addition to submitting an annual
percentage goal, FTA recipients must
submit, within 30 days of making an
award, the name of the successful
bidder and the total dollar value of the
contract in the manner prescribed in the
grant agreement. Once collected, the
FTA analyzes the information for
oversight purposes. For example, when
the FTA conducts triennial and DBEspecific reviews, FTA contractors check
the TVM Award Report data to make
sure that the information on file with
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
51441
the recipients is accurately reflected on
the report.
The total annual burden hours for
FTA recipients were calculated based
on the average of three stakeholder
responses ranging from 1–40 hours. The
total annual cost burden for FTA
recipients was calculated based on the
average of two stakeholder responses
ranging from $60–$4,000. The total
annual burden hours and cost for TVMs
is the response from one stakeholder.
The Department believes that these
responses are, generally, consistent with
its understanding of the paperwork
burden associated with this
requirement.
Respondents: FTA recipients and
TVMs.
Number of Respondents: 391 (328
FTA recipients; 63 TVMs).
Frequency: FTA recipients each
submit contract award information once
each time they award a contract to a
TVM, i.e., cumulatively 1,255 times
each year. The 63 TVMs each annually
submit one overall percentage goal to
the FTA, i.e., cumulative total of 63
annual submissions.
Number of Responses: 1,255 (1,192
FTA recipient responses and 63 TVM
responses).
Total Annual Burden: 12,020 hours
and $18,880 (11,920 hours and $17,880
for FTA recipients to submit contract
award information; 100 hours and
$1,000 for each TVM to submit one
overall percentage goal submission).
8. Projecting Which Portions of Overall
Goals of DBE Participation Will Be Met
Through Race-Neutral Means and
Which Portions Will Be Met Through
Race-Conscious Means
Section 26.51(c) states that each time
a recipient submits an overall goal for
review by the concerned OA, the
recipient must also submit a projection
of the portion of the goal that the
recipient expects to meet through race
neutral means and the basis for that
projection. The projection is subject to
approval by the concerned OA in
conjunction with its review of the
recipient’s overall goal. Recipients use
the information to determine what
combination of race conscious and race
neutral efforts they should undertake to
meet their overall goal.
The total annual burden hours we
received from six stakeholder responses
ranged from 3–1,387 hours. The total
annual cost burden from four
stakeholder responses ranged from
$360–$100,000. The Department
believes that the higher totals include
programmatic burdens beyond this
specific collection.
E:\FR\FM\15SEN1.SGM
15SEN1
51442
Federal Register / Vol. 86, No. 176 / Wednesday, September 15, 2021 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
Respondents: State and local
recipients of DOT funds.
Number of Respondents: 1,198 (592
FAA recipients, 53 FHWA recipients,
553 FTA recipients).
Frequency: Triennially.
Number of Responses: 1,198.
Total Annual Burden: 171,713 hours
and $9,000.
9. Documenting and Submitting
Evidence of Having Made ‘‘Good Faith
Efforts’’ To Secure DBE Participation in
DOT-Assisted Contracts
Section 26.53(b)(2) and Appendix A
state that in solicitations for DOTassisted contracts for which a contract
goal has been established, a recipient
must require all bidders or offerors to
submit the names and addresses of the
DBE firms that will participate in the
contract, a description of the work that
each DBE will perform, the dollar
amount of the participation of each DBE
firm participating, written
documentation of the bidder/offeror’s
commitment to use a DBE subcontractor
whose participation it submits to meet
a contract goal, and written
confirmation from each listed DBE firm
that it is participating in the contract in
the kind and amount of work provided
in the prime contractor’s commitment. If
the contract goal is not met, the
recipient must require all bidders or
offerors to submit evidence of their
‘‘good faith efforts’’ to achieve DBE
participation on the contract. The
documentation of good faith efforts
must include copies of each DBE and
non-DBE subcontractor quote submitted
to the bidder when a non-DBE
subcontractor was selected over a DBE.
The total annual burden hours below
were calculated based on the average of
five recipient responses ranging from 2–
192 hours. The total annual cost burden
was calculated based on the average of
four stakeholder responses ranging from
$250–$7,300.
The Department acknowledges that
the requirement of submitting ‘‘good
faith efforts’’ documentation imposes a
paperwork burden on prime contractors
as well. It has not been feasible for the
Department to survey prime contractors
to calculate their burden. We request
that prime contractors comment on this
collection and provide hour and cost
burden estimates that are as specific as
possible, especially what amount of
time it takes to prepare and submit
‘‘good faith efforts’’ documentation and
any additional costs beyond labor costs
(e.g., copying, mailing, storage, or other
technology costs). In response to the
Department’s 60-day notice, GCANY
commented that some of its members
have reported spending approximately
VerDate Sep<11>2014
17:08 Sep 14, 2021
Jkt 253001
$10,000–$15,000 per year on newspaper
advertisements that did not result in
DBE interest or participation. GCANY
also responded that on average it takes
four days for one full-time employee to
call 300 DBEs, explaining that one
person can call 15–20 DBEs in one hour,
it takes 15 hours to contact 300 DBEs for
the first round of calls, and then an
additional 10 hours for the second
round of calls. Prime contractor
Milestone Contractors LP commented
that its annual average burdens for
documenting and submitting evidence
of having made good faith efforts is 168
hours and $17,000. Contractor Jonathan
Nolting shared that good faith efforts
documentation takes approximately 1–2
days of multiple employees compiling,
editing, reviewing, and submitting the
required information. ARTBA
commented that that its average annual
burden related to good faith efforts is
168 hours and $17,000, based bidding
on 24 contracts per year.
Respondents: State and local
recipients of DOT funds and prime
contractors.
Number of Respondents: 1,198 (592
FAA recipients, 53 FHWA recipients,
553 FTA recipients).
Frequency: 72 times each year (6
times per month) for state and local
recipients of DOT funds.
Number of Responses: 86,256 (state
and local recipients of DOT funds).
Total Annual Burden: 4,680 hours
and $359,400 for state and local
recipients of DOT funds; approximately
96.5 hours and $15,000 for prime
contractors (based on the comments
described above).
10. Drafting Unified Certification
Program (UCP) Agreements
The DBE program regulation requires
all recipients and sponsors
implementing DBE and Airport
Concession DBE (ACDBE) programs to
establish a UCP in their respective
jurisdictions. In January 2020, DOCR
evaluated the UCP agreements of the 50
states, the District of Columbia, the
Northern Mariana Islands, and Puerto
Rico. DOCR found that over 20 UCP
agreements have errors, have not been
updated to reflect changes to the DBE
regulation made in 2011 and 2014, and
contain significant changes that might
not have been approved by the
Department.
One of the Department’s concerns is
that the UCP agreements and procedures
are posted online and included in
employee training materials, but contain
information that misleads certified and
applicant firms, as well as the recipients
that created the agreements. For
instance, some agreements contain
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
outdated standards (e.g., listing
$750,000 instead of the current $1.32
million personal net worth limit), and/
or inaccurate procedures (e.g., reference
to nonexistent regulatory requirements,
such as DBE certification expiration,
and impermissibly requiring interstate
certification applicants to participate in
telephone interviews).
The total annual burden hours for
UCPs to update their program
agreements were calculated based on
two stakeholder responses ranging from
2–192 hours. The total annual cost
burden was calculated based on the
response of one stakeholder.
Respondents: Unified Certification
Programs.
Number of Respondents: 53.
Frequency: The Department proposes
that this occur every four years. The
Department or OAs may, as part of
compliance activities, recommend or
request the recipient and sponsor to
make changes more frequently if
necessary.
Number of Responses: 53.
Total Annual Burden: 50 hours and
$3,700 per respondent.
11. Evaluating the DBE Certification
Eligibility of Applicant Firms
Recipients must take various steps in
determining an applicant’s eligibility,
such as performing an on-site visit to
the firm’s principal place of business.
Recipients often write a report
documenting the visit and maintain a
copy of it. They send a copy to the
Department if a firm found ineligible
files an appeal.
The total annual burden hours below
were calculated based on the average of
three stakeholder responses ranging
from 240–2000 hours. The total annual
cost burden was calculated based on
one stakeholder response of $80,000.
Respondents: Recipients that perform
DBE certification.
Number of Respondents: 132.
Frequency: 40 per respondent.
Number of Responses: 5,280.
Total Annual Burden: 44,000 hours
and $3.2 million.
12. Maintaining Copies of Written
Denial Letters Sent to Applicant Firms
and Sending Copies to DOT Upon
Request
Under § 26.86(a), when a recipient
denies a certification application of a
firm that is not currently certified by the
UCP of which the recipient is a member,
the recipient must provide the firm a
written denial letter explaining the
reasons for the decision, specifically
referencing the evidence in the record
that supports each reason for the denial.
The recipient must maintain a copy of
E:\FR\FM\15SEN1.SGM
15SEN1
Federal Register / Vol. 86, No. 176 / Wednesday, September 15, 2021 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
the denial letter. If the denied firm
appeals to DOT, the recipient must send
a copy of the letter to DOT. If the firm
requests the documents and other
information on which the denial was
based, the recipient must provide them.
The total annual burden hours below
were calculated based on the average of
three recipient responses within a
narrow range. The total annual cost
burden was calculated based on one
stakeholder response of $7,000. This is
an instance in which the Department
believes that recipients included hours
and costs beyond those attributable to
the paperwork burden. As denial letters
are not standardized, they are not
considered an information collection
and the burden associated with writing
them is not a paperwork burden. The
only paperwork burdens are for
recipients to send electronic copies of
the letters to firms and to the
Department, and maintain a copy of the
letters. Given the relative simplicity of
those tasks, it seems unlikely that they
require 3,360 hours and $210,000.
Respondents: Recipients that perform
DBE certification.
Number of Respondents: 132.
Frequency: 2.5 each month.
Number of Responses: 3,960 per year.
Total Annual Burden: 3,360 hours
and $210,000.
13. Removing the Eligibility of a DBE
Firm
Section 26.87 describes the process
for a recipient to remove a firm’s
certification. If a recipient determines
there is reasonable cause to believe that
a certified firm is no longer eligible for
DBE certification, the recipient must
give the firm a written notice of its
intent to decertify the firm. The notice
must clearly describe the reasons for the
proposed determination and the reasons
for it, with specific references to the
evidence in the record on which each
reason is based. The recipient must offer
the firm, in writing, an opportunity for
an informal hearing at which the firm
may respond to the reasons for the
proposal to remove its eligibility. The
recipient must maintain a verbatim
record/transcript of the hearing. If a
recipient reaches a final decision to
decertify the firm, the recipient must
provide the firm written notice of the
decision and the reasons for it,
including specific references to the
evidence in the record that supports
each reason for the decision. The notice
must inform the firm of the
consequences of the final decision and
explain the process for filing an appeal
with the Department. If the firm appeals
to the Department, the recipient must
provide the Department with a copy of
VerDate Sep<11>2014
17:08 Sep 14, 2021
Jkt 253001
the transcript, and on request, to the
firm.
The information collected during the
decertification process is used in
multiple ways. The decisionmaker
appointed by the recipient uses the
information in the notice of intent to
decertify and any evidence presented
during or after the hearing to make a
final decision on whether the firm
should be decertified. The firm uses the
information in the notice of intent to
decertify to determine what evidence or
arguments it might want to submit at the
informal hearing. The firm uses the
information in the final decision, in
part, to decide whether it wishes to file
an appeal with the Department. If the
firm files an appeal, the Department
uses the information to determine
whether substantial evidence supports
the recipient’s decision to remove the
firm’s certification eligibility.
The total annual burden hours are
based on the average of three
stakeholder responses ranging from 60–
180 hours. The total annual cost is
based on one stakeholder response of
$4,100.
Respondents: Unified Certification
Programs.
Number of Respondents: 38.
Frequency: 53 each year.
Number of Responses: 2,014.
Total Annual Burden: 6,095 hours
and $217,300.
14. Mailing and Maintaining Copies of
Summary Suspension Notices
Under § 26.88 when a recipient
summarily suspends a firm’s DBE
certification, the recipient must
immediately notify the firm of the
suspension by certified mail, return
receipt requested, to the last known
address of the owner(s) of the firm. If
the owner(s) responds to the notice with
information demonstrating that the firm
remains eligible, the recipient must
respond in writing (within 30 days of
receiving the information) and explain
how it intends to proceed.
The total annual burden hours below
were calculated based on the average of
three stakeholder responses ranging
from 12–180 hours. The total annual
cost burden was calculated based on
one response from one stakeholder of
$7,600. This is another instance in
which the Department believes that
recipients included hours and costs
beyond those attributable to the
paperwork burden. Given that, the
hours and cost estimates the Department
received are likely too high. Summary
suspension notices are not standardized
and thus not considered an information
collection. The burden associated with
writing them is not a paperwork burden.
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
51443
The only paperwork burdens are for
recipients to send the notices by
certified mail to firms and maintain an
electronic copy.
Respondents: Recipients that perform
DBE certification.
Number of Respondents: 132.
Frequency: 5 times each year.
Number of Responses: 660.
Total Annual Burden: 420 hours and
$38,000.
15. Sending the Department a Full
Administrative Record When the
Department Gives Notice That a Denied
or Decertified Firm Appeals to the
Department and Maintaining a Copy of
the Record
Under § 26.89(d), recipients must
comply with the Department’s request
to timely (within 20 days of the request)
provide a full administrative record
when the Department gives notice that
a denied or decertified firm has filed an
appeal with the Department.
The total annual burden hours below
were calculated based on the average of
three stakeholder responses ranging
from 2–200 hours. The total annual cost
burden was calculated based on one
response from one stakeholder response
of $7,600.
Respondents: Recipients that perform
DBE certification that have denied or
decertified firms that appeal to the
Department.
Number of Respondents: 50.
Frequency: 3 times each year.
Number of Responses: 150.
Total Annual Burden: 12,600 hours
and $7,600.
16. Providing a Copy of Application
Materials to an Additional State in
Which a Firm Certified in Another
State Applies to Another State for
Certification (Interstate Certification)
Under § 26.85(c), when a firm
currently certified in its home state
(state A) applies to another state (state
B) for DBE certification, state B is
permitted to require the firm to submit
a complete copy of all the materials the
firm submitted to its home state/state A
for initial certification. State B reviews
the information to determine whether
there is ‘‘good cause’’ (a term
specifically described in the interstate
certification rule) to believe that state
A’s certification is not erroneous or
should not apply in its state. The
interstate certification rule describes the
limited circumstances under which
state B could validly make such a
determination.
Respondents: DBE firms applying for
interstate certification.
Number of Respondents: 68.
Frequency: Once.
E:\FR\FM\15SEN1.SGM
15SEN1
51444
Federal Register / Vol. 86, No. 176 / Wednesday, September 15, 2021 / Notices
Number of Responses: 68.
Total Annual Burden: 20 hours and
$2,000.
DEPARTMENT OF TRANSPORTATION
Office of the Secretary
khammond on DSKJM1Z7X2PROD with NOTICES
17. Writing and Submitting Narratives
of Social and Economic Disadvantage
When Applying for DBE Certification
Based on an Individualized Showing of
Disadvantage
The DBE program is intended to be as
inclusive as possible while still
remaining narrowly tailored.
Individuals who are not members of
groups whose members are presumed
socially and economically
disadvantaged may still qualify for DBE
certification. Appendix E of the
regulation states that to demonstrate
their eligibility, these individuals must
submit a narrative describing the
individual’s experiences of social
disadvantage and a separate narrative in
which the individual describes why the
individual is economically
disadvantaged. This information
collection is critical for ensuring that
only fully qualified firms receive DBE
certification.
Respondents: DBE certification
applicants whose owners are not
presumed socially and economically
disadvantaged under the DBE
regulation.
Number of Respondents: 264.
Frequency: Once.
Number of Responses: 264.
Total Annual Burden: 90 hours and
$8,000.
Public Comments Invited: You are
asked to comment on any aspect of this
information collection, including (a)
Whether the proposed collection of
information is necessary for the
Department’s performance; (b) the
accuracy of the estimated burden; (c)
ways for the Department to enhance the
quality, utility and clarity of the
information collection; and (d) ways
that the burden could be minimized
without reducing the quality of the
collected information. The agency will
summarize and/or include your
comments in the request for OMB’s
clearance of this information collection.
Authority: The Paperwork Reduction
Act of 1995; 44 U.S.C. Chapter 35, as
amended; and 49 CFR 1:48.
Issued in Washington, DC on September 8,
2021.
Irene B. Marion,
Director, Departmental Office of Civil Rights,
U.S. Department of Transportation.
[FR Doc. 2021–19940 Filed 9–14–21; 8:45 am]
BILLING CODE 4910–9X–P
VerDate Sep<11>2014
17:08 Sep 14, 2021
Jkt 253001
[Docket No. DOT–OST–2021–0105]
Agency Request for Renewal of a
Previously Approved Information
Collection(s): Disadvantaged Business
Enterprise (DBE) Program Collections
Office of the Secretary,
Department of Transportation.
ACTION: Notice and request for
comments.
AGENCY:
The Department of
Transportation (DOT) invites public
comments about our intention to request
the Office of Management and Budget
(OMB) approval to renew information
collections associated with DOT’s
Disadvantaged Business Enterprise
(DBE) and Airport Concessions DBE
(ACDBE) program. These collections
are: Uniform Report of DBE Awards or
Commitments and Payments, the
Uniform Certification Application
(UCA), Annual Affidavit of No Change,
DOT Personal Net Worth Form, and
Reporting Requirements for Percentages
of DBEs in Various Categories.
DATES: Written comments should be
submitted by October 15, 2021.
ADDRESSES: You may submit comments
[identified by Docket No. DOT–OST–
2021–0105] through one of the
following methods:
• Federal eRulemaking Portal: http://
www.regulations.gov. Follow the online
instructions for submitting comments.
• Fax: 1–202–493–2251.
• Mail or Hand Delivery: Docket
Management Facility, U.S. Department
of Transportation, 1200 New Jersey
Avenue SE, West Building, Room W12–
140, Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through
Friday, except on Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Marc Pentino, (202)366–6968,
[email protected], or Aarathi Haig,
[email protected]/Departmental
Office of Civil Rights, Office of the
Secretary, U.S. Department of
Transportation, 1200 New Jersey
Avenue SE, Washington, DC, 20590
SUPPLEMENTARY INFORMATION: All five
collections were previously approved
under one OMB Control Number to
allow DOT to more efficiently
administer the DBE program. The
information to be collected is necessary
because it helps to ensure that State and
local recipients that let federally funded
contracts carry out their mandated
responsibility to provide a level playing
field for small businesses owned and
controlled by socially and economically
SUMMARY:
PO 00000
Frm 00107
Fmt 4703
Sfmt 4703
disadvantaged individuals. We are
required to publish this notice in the
Federal Register by the Paperwork
Reduction Act of 1995, 44 U.S.C.
Chapter 35, as amended (Pub. L. 104–
13).
OMB Control Number: 2105–0510.
Title: Disadvantaged Business
Enterprise Program Collections.
Form Numbers: Not applicable.
Type of Review: Renewal of an
information collection.
Background: DOT’s DBE program is
mandated by statute, including Section
1101(b) of the Fixing America’s Surface
Transportation Act (FAST Act) (Pub. L.
114–94) and 49 U.S.C. 47113. The
Department’s final regulations
implementing these statutes are 49 CFR
parts 23 and 26. The program is
implemented by recipients of DOT
financial assistance (State highway
agencies, transit authorities, and
airports).
The ‘‘Uniform Report of DBE Awards
or Commitments and Payments’’ is
necessary for the Department to be able
to carry out its oversight
responsibilities. It implements statutory
reporting requirements and 49 CFR
26.11 and 26.47.
The ‘‘Uniform Certification
Application Form’’ is required under 49
CFR 26.83(c)(2) and is necessary for
determining whether a particular firm
qualifies for DBE certification.
The ‘‘Annual Affidavit of No Change’’
is mandated under 49 CFR 26.83(j) and
is necessary to ensure the integrity of
the DBE program that requires DBEs
annually state that they remain eligible
for the program.
The ‘‘Personal Net Worth Form’’ is
necessary to implement the requirement
found in 49 CFR 26.67(a)(2) that a firm
applying for DBE status must certify that
the personal net worth of the
disadvantaged owner(s) on whom the
firm relies for certification eligibility
does not exceed the current limit of
$1.32 million.
The ‘‘Percentages of DBEs in Various
Categories’’ collection is necessary to
implement a long-standing statutory
requirement calling on States to report
annually, a list of small businesses
certified as DBEs that are owned and
controlled by socially and economically
disadvantaged individuals, most
recently included at section
1101(b)(4)(A) and (B) of the FAST Act.
Submission of this information will also
satisfy 49 CFR 26.11(e).
The information collections support
one of DOT’s strategic objectives of
mission efficiency and support. The
collection also helps ensure that State
and local recipients that let federally
funded contracts carry out their
E:\FR\FM\15SEN1.SGM
15SEN1