Plan Approval & Records for Tank, Passenger, Cargo & Miscellaneous Vessels, Mobile Offshore Drilling Units, Nautical Schools, Oceanographic VSLS & Electrical Engineering

Plan Approval & Records for Tank, Passenger, Cargo & Miscellaneous Vessels, Mobile Offshore Drilling Units, Nautical Schools, Oceanographic VSLS & Electrical Engineering

1625-0038_Inst_r5_2021-cvc

Plan Approval & Records for Tank, Passenger, Cargo & Miscellaneous Vessels, Mobile Offshore Drilling Units, Nautical Schools, Oceanographic VSLS & Electrical Engineering

OMB: 1625-0038

Document [docx]
Download: docx | pdf

U.S. DEPARTMENT OF

HOMELAND SECURITY

U.S. COAST GUARD

Plan Approval and Records for Tank, Passenger, Cargo and Miscellaneous Vessels, Mobile Offshore Drilling Units, Nautical School Vessels and Oceanographic Research Vessels –- 46 CFR Subchapters D, H, I, I-A, R and U

OMB No. 1625-0038

Exp: 09/30/2022


Who must comply?

Shipyards, designers and manufacturers (aka applicants) of certain vessels.

What is this collection about?

This information collection requires an applicant to submit plans, technical information and operating manuals to the Coast Guard (CG).

Where do I find the requirements for this information?

Title 46 CFR, is available at—https://www.eCFR.gov, select TITLE 46 – SHIPPING, and follow to the appropriate subchapter.

When must information be submitted to the Coast Guard?

Information must be submitted to the CG prior to construction or modification of vessel.

How is the information submitted?

In writing or electronically via e-mail. Information may be submitted to the CG Officer in Charge, Marine Inspection (OCMI) at the local Sector Office, or the CG Marine Safety Center (MSC). Contact info for CG OCMIs can be found at—https://www.uscg.mil/Units/Organization/. For details on submitting information to the CG MSC, go tohttps://www.dco.uscg.mil/msc.

What happens when complete information is received?

Once all required information has been provided and the CG approves it, you will be notified in writing.

For additional information, contact--

Your local CG Sector Office or the CG MSC.


An agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a valid OMB control number.

The Coast Guard estimates that the average burden per response for this report is—about 1 hour for an MSC plan submission, and about 1 hour for an ACS plan submission. You may submit any comments concerning the accuracy of this burden estimate or any suggestions for reducing the burden to: Commandant (CG-CVC), U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr Ave SE, Washington, DC 20593-7501 or Office of Management and Budget, Paperwork Reduction Project (1625-0038), Washington, DC 20503.

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File Title1625-0093 Facilities Transferring Oil or Hazardous Materials in Bulk -- Letter of Intent and Operations Manual http://law
Authorsarabdeep.kaur
File Modified0000-00-00
File Created2022-10-06

© 2024 OMB.report | Privacy Policy