Burden Calculation Table

2268t06.xlsx

NESHAP for Paint Stripping and Miscellaneous Surface Coating at Area Sources (40 CFR part 63, subpart HHHHHH) (Renewal)

Burden Calculation Table

OMB: 2060-0607

Document [xlsx]
Download: xlsx | pdf

Overview

Summary Table
Capital and O&M Costs
# Respondents
# Responses Calcs
Respondent Burden
Agency Burden


Sheet 1: Summary Table

Table 1: Summary of Annual Respondent Burden and Cost – NESHAP for Paint Stripping and Miscellaneous Surface Coating at Area Sources (40 CFR Part 63, Subpart HHHHHH) (Renewal)




















Sector Commercial Misc. Surface Coating Government Misc. Surface Coating Paint Stripping Total

Burden Hours 96,000 452 5,520 102,000

Labor Cost $11,400,000 $53,600 $654,000 $12,100,000

Capital and O&M Costs $25,200 $150 $1,800 $27,100

Grand Total $11,400,000 $53,800 $656,000 $12,100,000












2 hrs/response

Sheet 2: Capital and O&M Costs

Capital/Startup vs. Operation and Maintenance (O&M) Costs
Burden Item (A) (B) (C) (D)
Annual O&M Costs per Occurrence Number of Occurrences per Respondent per Year Average Number of Respondents with O&M Total O&M,



(A× B×C)
Miscellaneous Surface Coating
Initial Notification Letter $1 1 25 $25
Notification of Compliance Status $1 1 25 $25
Annual Notification of Changes Report a $3 1 166 $499
Subtotal


$549
Commercial Motor Vehicle and Mobile Equipment Refinishing
Initial Notification Letter $1 1 1,593 $1,593
Notification of Compliance Status $1 1 1,593 $1,593
Annual Notification of Changes Report a $3 1 7,146 $21,439
Subtotal


$24,625
Government Motor Vehicle and Mobile Equipment Refinishing
Annual Notification of Changes Report a $3 1 50 $150
Subtotal


$150
Paint Stripping
Annual Notification of Changes Report a $3 1 600 $1,800
Subtotal


$1,800
TOTALb


$27,100
a This ICR assumes that 20% of existing affected sources submit an annual notification of changes report each year. The remaining existing sources would only retain records.
b Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.




Sheet 3: # Respondents

Number of Respondentsa

Respondents That Submit Reports b Respondents That Do Not Submit Any Reports


(A) (B) (C) (D) (E)
Year Number of New Respondents c Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are No Longer Subject Number of Respondents





(E=A+B+C-D)
Miscellaneous Surface Coating
1 25 166 665 25 831 <--Note to EPA: We have adjusted all of these categories to assume 20% will submit an annual notification of changes report in each year.
2 25 166 665 25 831
3 25 166 665 25 831
Commercial Motor Vehicle and Mobile Equipment Refinishing
1 1,593 7,146 28,585 1,593 35,731
2 1,593 7,146 28,585 1,593 35,731
3 1,593 7,146 28,585 1,593 35,731
Government Motor Vehicle and Mobile Equipment Refinishing
1 0 50 200 0 250
2 0 50 200 0 250
3 0 50 200 0 250
Paint Stripping
1 0 600 2,400 0 3,000 <--Note to EPA: The prior ICR had this split as if 35% of stripping sources would submit reports, and 65% would not, but this was based on the assumption (see comment on p. 11 of SS) that stripping sources don't submit any reports unless they use >one ton of MeCl, which is not accurate. So it was treating it as if 35% of MeCl sources use >one ton, and all of those >one ton sources will submit a report every year, which is also inaccurate since they still only have to submit reports when there is a change. With this in mind, we adjusted this number to use the 20% assumption as well.
2 0 600 2,400 0 3,000
3 0 600 2,400 0 3,000
Average 1,618 7,962 31,850 1,618 39,812
a This ICR assumes a total of 39,812 commercial facilities exist in any given year, and that 1,618 new sources per year will be constructed. This ICR also assumes that existing sources will shut down at a rate equal to that replaced by new sources. Therefore, the total number of affected sources subject to this rule (i.e., 39,312 sources) will not change in any given year.
b This ICR assumes that 20% of existing affected sources submit an annual notification of changes report each year. The remaining existing sources would only retain records.

c New respondents include sources with constructed, reconstructed and modified affected facilities.






Sheet 4: # Responses Calcs

Total Annual Responses
(A)
Information Collection Activity
(B)
Number of Respondents
(C)
Number of Responses
(D)
Number of Existing Respondents That Keep Records But Do Not Submit Reports
(E)
Total Annual Responses
E=(BxC)+D
Miscellaneous Surface Coating
Initial notification letter 25 1 0 25
Notification of compliance status 25 1 0 25
Annual Notification of Changes Report a 166 1 665 831
Subtotal


881
Commercial Motor Vehicle and Mobile Equipment Refinishing
Initial notification letter 1,593 1 0 1,593
Notification of compliance status 1,593 1 0 1,593
Annual Notification of Changes Report a 7,146 1 28,585 35,731
Subtotal


38,917
Government Motor Vehicle and Mobile Equipment Refinishing
Initial notification letter 0 1 0 0
Notification of compliance status 0 1 0 0
Annual Notification of Changes Report a 50 1 200 250
Subtotal


250
Paint Stripping
Initial notification letter 0 1 0 0
Notification of compliance status 0 1 0 0
Annual Notification of Changes Report a 600 1 2,400 3,000
Subtotal


3,000
Total (after rounding)


43,000
a This ICR assumes that 20% of existing affected sources submit an annual notification of changes report each year. The remaining existing sources would only retain records.

Sheet 5: Respondent Burden

Table 1a: Annual Respondent Burden and Cost – Commercial Miscellaneous Surface Coating Operations at Area Sources




























































































































Burden Item A B C D E F G H
TECH $122.66


















































Technical person-hours per occurrence No. of occurrences per respondent per year Technical person-hours per respondent per year (AxB) Respondents per year a Technical hours per year (CxD) Management hours per year (Ex0.05) Clerical hours per year (Ex0.10) Total cost per year ($) b
MGMT $149.84


















































1. Applications Not applicable







CLER $60.88


















































2. Surveys and studies Not applicable




























































3. Reporting requirements





























































A. Familiarization with Regulatory Requirements





























































New sources 5 1 5 1,618 8,090 404.5 809 $1,102,181.60





















































Existing sources 1 1 1 36,562 36,562 1,828.1 3,656 $4,981,206.88





















































B. Required activities Not applicable




























































C. Create information





























































1. Initial notification letter 1 1 1 1,618 1,618 80.9 161.8 $220,436.32





















































2. Notification of compliance status 2 1 2 1,618 3,236 161.8 323.6 $440,872.64





















































3. Annual Notification of Changes Report 2 1 2 7,312 14,625 731.2 1,462.5 $1,992,482.75





















































Reporting Subtotal



73,750 $8,737,180





















































4. Recordkeeping requirements





























































A. Familiarization with Regulatory Requirements Included in 3A




























































B. Plan activities Not applicable




























































C. Implement activities Not applicable




























































D. Develop record system 8 1 8 1,618 12,944 647.2 1,294.4 $1,763,490.56





















































E. Time to record information





























































1. Records of painter certification c 0.25 2.4 0.6 7,312 4,387.4 219.37 438.74 $597,744.83




















































Thanks, see updated footnotes.
2. Records of filter efficiency d 0.25 1 0.25 366 91.41 4.57 9.14 $12,453.02




















































3. Records of spray gun performance e 1.5 1 1.5 0 0 0 0 0




















































4. Records of deviation from rule requirements and corrective actions taken f 1 1 1 1,828 1,828 91.41 182.8 $249,060.34




















































F. Time to train personnel Not applicable




























































G. Time for audits Not applicable




























































Recordkeeping Subtotal



22,139 $2,622,749





















































TOTAL LABOR BURDEN AND COST (rounded) g



96,000 $11,400,000





















































TOTAL CAPITAL AND O&M COST (rounded) g




$25,200





















































GRAND TOTAL (rounded) g




$11,400,000




















































































































Assumptions:





























































a This ICR assumes a total of 36,562 commercial surface coating facilities exist in any given year, and that 1,618 new sources per year will be constructed. These commercial facilities comprise both the miscellaneous surface coating and commercial motor vehicle and mobile equipment refinishing categories. This ICR also assumes that existing sources will shut down at a rate equal to that replaced by new sources. Therefore, the total number of affected sources subject to this rule will not change in any given year.





















































b This ICR uses the following labor rates: $122.66 for technical, $149.84 for managerial, and $60.88 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2020, “Table 2. Civilian workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.





















































c Assumes that each facility has 2.4 painters, on average. A record of the certification must be kept for each painter at the facility, and entering the record for each painter is expected to take 15 minutes. Certifications are good for 5-years and it is assumed that each year, 20 percent of the painters will need to have their records updated. However, for new sources, all painters need their records entered into the system.
<--Note to EPA: These assumptions are based on similar assumptions from final rule ICR.



















































d Assumes 1% of affected sources will opt to test the filter effieciency of filters that are not polyester fiber or fiberglass. If a source opts to test the efficiency of a filter, it is assumed that the filter manufacturer would perform the test, and the burden on the source would only be the time to record and file the efficiency of this filter based on the results of the manufacturer's test.
<--Note to EPA: These assumptions are based on similar assumptions from final rule ICR.



















































e Only sources without an HVLP gun are required to maintain records on the testing of non-HVLP type spray guns. It is assumed that no source will opt for a testing of their spray gun, and all sources with non-HVLP type spray guns will purchase new guns in response to the rule before the effective date and there are no recordkeeping costs associated with this requirement.
<--Note to EPA: These assumptions are based on similar assumptions from final rule ICR.



















































f The number of sources expected to record a deviation for the rule requirements is based on the assumption of a 95 percent compliance rate. Approximately 5 percent of the estimated 36,652 sources that are required to be in compliance with the rule in any given year are expected to have some type of violation of the proposed work practices.
<--Note to EPA: These assumptions are based on similar assumptions from final rule ICR.



















































g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.




























































































































Table 1b: Annual Respondent Burden and Cost – Government-owned Miscellaneous Surface Coating Operations at Area Sources




























































































































Burden Item A B C D E F G H





















































Technical person-hours per occurrence No. of occurrences per respondent per year Technical person-hours per respondent per year (AxB) Respondents per year a Technical hours per year (CxD) Management hours per year (Ex0.05) Clerical hours per year (Ex0.10) Total cost per year ($) b





















































1. Applications Not applicable




























































2. Surveys and studies Not applicable




























































3. Reporting requirements





























































A. Familiarization with Regulatory Requirements 1 1 1 250 250 13 25 $34,060.00





















































B. Required activities Not applicable




























































C. Create information





























































1. Initial notification letter 1 1 1 0 0 0 0 0





















































2. Notification of compliance status 2 1 2 0 0 0 0 0





















































3. Annual Notification of Changes Report 2 1 2 50 100 5 10 $13,624.00





















































Reporting Subtotal



403 $47,684





















































4. Recordkeeping requirements





























































A. Familiarization with Regulatory Requirements Included in 3A




























































B. Plan activities Not applicable




























































C. Implement activities Not applicable




























































D. Develop record system 8 1 8 0 0 0 0 0





















































E. Time to record information





























































1. Records of painter certification c 0.25 2.4 0.6 50 30.00 1.50 3.00 $4,087.20





















































2. Records of filter efficiency d 0.25 1 0.25 3 0.63 0.03 0.06 $85.15





















































3. Records of spray gun performance e 1.5 1 1.5 0 0 0 0 0





















































4. Records of deviation from rule requirements and corrective actions taken f 1 1 1 13 12.50 0.63 1.25 $1,703.00





















































F. Time to train personnel Not applicable




























































G. Time for audits Not applicable




























































Recordkeeping Subtotal



50 $5,875





















































TOTAL LABOR BURDEN AND COST (rounded) g



452 $53,600





















































TOTAL CAPITAL AND O&M COST (rounded) g




$150





















































GRAND TOTAL (rounded) g




$53,800





















































Assumptions:





























































a EPA estimates a total of 250 existing, government-owned paint shops by assuming one shop per county for counties with a population greater than 240,000. This ICR assumes no new, government-owned paint shops will open over the three-year ICR period.





















































b This ICR uses the following labor rates: $122.66 for technical, $149.84 for managerial, and $60.88 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2020, “Table 2. Civilian workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.





















































c Assumes that each facility has 2.4 painters, on average. A record of the certification must be kept for each painter at the facility, and entering the record for each painter is expected to take 15 minutes. Certifications are good for 5-years and it is assumed that each year, 20 percent of the painters will need to have their records updated.
<--Note to EPA: These assumptions are based on similar assumptions from final rule ICR.



















































d Assumes 1% of affected sources will opt to test the filter effieciency of filters that are not polyester fiber or fiberglass. If a source opts to test the efficiency of a filter it is assumed that the filter manufacturer would perform the test and the burden on the source would only be the time to record and file the efficiency of this filter based on the results of the manufacturer's test.
<--Note to EPA: These assumptions are based on similar assumptions from final rule ICR.



















































e Only sources without an HVLP gun are required to maintain records on the testing of non-HVLP type spray guns. It is assumed that no source will opt for a testing of their spray gun, and all sources with non-HVLP type spray guns will purchase new guns in response to the rule before the effective date and there are no recordkeeping costs associated with this requirement.
<--Note to EPA: These assumptions are based on similar assumptions from final rule ICR.



















































f The number of sources expected to record a deviation for the rule requirements is based on the assumption of a 95 percent compliance rate. Approximately 5 percent of the estimated 250 sources that are required to be in compliance with the rule in any given year are expected to have some type of violation of the proposed work practices.
<--Note to EPA: These assumptions are based on similar assumptions from final rule ICR.



















































g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.




























































































































Table 1c: Annual Respondent Burden and Cost – Paint Stripping Operations at Area Sources




























































































































Burden Item A B C D E F G H





















































Technical person-hours per occurrence No. of occurrences per respondent per year Technical person-hours per respondent per year (AxB) Respondents per year a Technical hours per year (CxD) Management hours per year (Ex0.05) Clerical hours per year (Ex0.10) Total cost per year ($) b





















































1. Applications Not applicable




























































2. Surveys and studies Not applicable




























































3. Reporting requirements





























































A. Familiarization with Regulatory Requirements 1 1 1 3,000 3,000 150 300 $408,720.00





















































B. Process/Review information 2 0 0 0 0 0 0 0





















































C. Create information





























































1. Initial notification letter 1 0 0 0 0 0 0 0





















































2. Notification of compliance status 1 0 0 0 0 0 0 0





















































3. Annual Notification of Changes Report 1 1 1 600 600 30.0 60 $81,744.00





















































Reporting Subtotal



4,140 $490,464





















































4. Recordkeeping requirements





























































A. Familiarization with Regulatory Requirements Included in 3A




























































B. Plan activities 8 0 0 0 0 0 0 0





















































C. Implement activities





























































1. Train personnel 8 0 0 0 0 0 0 0





















































2. Update plan 2 1 2 600 1,200 60 120 $163,488.00





















































D. Time to record information 1 0 0 600 0 0 0 0





















































Recordkeeping Subtotal



1,380 $163,488





















































TOTAL LABOR BURDEN AND COST (rounded)c



5,520 $654,000





















































TOTAL CAPITAL AND O&M COST (rounded)c




$1,800





















































GRAND TOTAL (rounded)c




$656,000





















































Assumptions:





























































a This ICR assumes a total of 3,000 paint stripping facilities exist in any given year. EPA estimates 600 of these facilities will need to submit an annual notification of changes report each year due to changes occurring after the most recent report or notification, such as changes to the MeCl minimization plan or adoption of a minimization plan due to use of more than one ton of MeCl in a calendar year.





















































b This ICR uses the following labor rates: $122.66 for technical, $149.84 for managerial, and $60.88 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2020, “Table 2. Civilian workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.





















































c Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






























































Sheet 6: Agency Burden

Table 2: Average Annual EPA Burden and Cost – NESHAP for Paint Stripping and Miscellaneous Surface Coating at Area Sources (40 CFR Part 63, Subpart HHHHHH) (Renewal)






















Burden Item A B C D E F G H
TECH $51.23
Technical person-hours per occurrence No. of occurrences per respondent per year Technical person-hours per respondent per year (AxB) Respondents per year Technical hours per year (CxD) Management hours per year (Ex0.05) Clerical hours per year (Ex0.10) Total cost per year ($) a
MGMT $69.04
Applications Not applicable







CLER $27.73
Required activities Not applicable









Create information Not applicable









Gather information Not applicable









Report reviews Not applicable









Initial notification letter 0.5 1 0.5 1,618 809 40.45 80.9 $46,481.10


Notification of compliance status 0.5 1 0.5 1,618 809 40.45 80.9 $46,481.10


Annual Notification of Changes Report 0.5 1 0.5 7,962 3,981 199.06 398.1 $228,739.85


TOTAL ANNUAL BURDEN AND COST (ROUNDED)b



6,440 $322,000


Assumptions:










a. This ICR uses the following labor rates: $51.23 for technical, $69.04 for managerial, and $27.73 for clerical labor. These rates are from the Office of Personnel Management (OPM) 2021 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


b Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.










File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy