Download:
pdf |
pdfOMB No. 2060-0347
ENERGY STAR® Application for Certification
80
ENERGY STAR ®
1
Score
ICF Office
Registry Name: ICF Office
Property Type: Office
Gross Floor Area (ft²): 245,750
Built: 2010
2
For Year Ending: Jan 31, 2020
Date Application Becomes Ineligible: See this FAQ for details.
1. The ENERGY STAR Score is based on total source energy. A score of 75 is the minimum to be eligible for the ENERGY STAR.
2. The award is not final until approval is received from EPA or NRCan.
Please use the Licensed Professional’s Guide to the ENERGY STAR ® for Commercial
Buildings for reference in completing this checklist
(http://www.energystar.gov/lpguide).
Property & Contact Information
Property Address
ICF Office
9300 Lee Highway
Fairfax, Virginia 22031
Property Owner
ICF International
9300 Lee Highway
Fairfax, VA 22031
2222222222
Property ID: 10875726
Primary Contact
Kate Rubin
9300 Lee Highway
Fairfax, VA 22031
2222222222
[email protected]
1. Review of Whole Property Characteristics
Basic Property Information
1) Property Name for Registry: ICF Office
Yes
No
Yes
No
Yes
No
Is this the official name to be displayed in the Registry of ENERGY STAR Certified
Buildings and Plants?
If “No”, please specify: _____________________________________
2) Property Type: Office
Is this an accurate description of the primary use of this property?
3) Location:
EPA Form 5900-197
Page 1 of 8
Tracking Number: APP-20200504-0-10875726
Generated On: May 4, 2020
OMB No. 2060-0347
9300 Lee Highway
Fairfax, Virginia 22031
Is this correct and complete?
4) Gross Floor Area: 245,750 ft²
Yes
No
Yes
No
Yes
No
Yes
No
Is value an accurate account of the gross floor area for the property?
5) Average Occupancy (%): 75
Is this occupancy percentage accurate for the entire 12 month period being assessed?
6) Number of Buildings: 1
Does this number accurately represent all structures?
7) Whole Property Verification:
Does this application represent the entire property? If any space or energy use has been
excluded from this property, please describe it in the notes section below.
Notes:
Indoor Environmental Quality
1) Outdoor Air Ventilation
Yes
No
Yes
No
Yes
No
Were measurements and/or calculations taken and recorded under normal building operating
conditions using an allowable method as described in the Licensed Professional’s Guide
which demonstrate this property meets the minimum ventilation rates according to ANSI/
ASHRAE Standard 62?
[NOTE: In the case of an audit of this application, Appendix A: IEQ Measurement Form
from the LP Guide, will be required to be completed and submitted to EPA. Failure to submit
measurements will result in a denial of the application.]
2) Thermal Environmental Conditions
Were measurements taken and recorded per the Licensed Professional’s Guide which
demonstrate this property meets the acceptable thermal environmental conditions according
to ANSI/ASHRAE Standard 55, Thermal Environmental Conditions for Human Occupancy?
[NOTE: In the case of an audit of this application, Appendix A: IEQ Measurement Form
from the LP Guide, will be required to be completed and submitted to EPA. Failure to submit
measurements will result in a denial of the application.]
3) Illumination
Were measurements taken and recorded per the LP Guide which demonstrate this property
meets minimum recommended illumination levels according to the most recent version of the
Illuminating Engineering Society of North America (IESNA) Lighting Handbook?
EPA Form 5900-197
Page 2 of 8
Tracking Number: APP-20200504-0-10875726
Generated On: May 4, 2020
OMB No. 2060-0347
[NOTE: In the case of an audit of this application, Appendix A: IEQ Measurement Form
from the LP Guide, will be required to be completed and submitted to EPA. Failure to submit
measurements will result in a denial of the application.]
Notes:
2. Review of Property Use Details
Office: Office Space - Occupied
1) Gross Floor Area: 195,750 ft²
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Is this the total size, as measured between the outside surface of the exterior walls
of the building(s)? This includes all areas inside the building(s) such as: occupied
tenant areas, common areas, meeting areas, break rooms, restrooms, elevator shafts,
mechanical equipment areas, and storage rooms. Gross Floor Area should not include
interstitial plenum space between floors, which may house pipes and ventilation. Gross
Floor Area is not the same as rentable, but rather includes all area inside the building(s).
Leasable space would be a sub-set of Gross Floor Area. In the case where there is an
atrium, you should count the Gross Floor Area at the base level only. Do not increase
the size to accommodate open atrium space at higher levels. The Gross Floor Area
should not include any exterior spaces such as balconies or exterior loading docks and
driveways.
2) Weekly Operating Hours: 60
Is this the total number of hours per week that the property is occupied by the majority
of the employees? It does not include hours when the HVAC system is starting up or
shutting down, or when property is occupied only by maintenance, security, cleaning
staff, or other support personnel. For properties with a schedule that varies during the
year, use the schedule most often followed.
3) Number of Workers on Main Shift: 520
Is this the total number of workers present during the primary shift? This is not a total
count of workers, but rather a count of workers who are present at the same time. For
example, if there are two daily eight hour shifts of 100 workers each, the Number of
Workers on Main Shift value is 100. Number of Workers on Main Shift may include
employees of the property, sub-contractors who are onsite regularly, and volunteers
who perform regular onsite tasks. Number of Workers should not include visitors to the
buildings such as clients, customers, or patients.
4) Number of Computers: 740
Is this the total number of computers, laptops, and data servers at the property? This
number should not include tablet computers, such as iPads, or any other types of office
equipment.
5) Percent That Can Be Cooled: 100
EPA Form 5900-197
Page 3 of 8
Tracking Number: APP-20200504-0-10875726
Generated On: May 4, 2020
OMB No. 2060-0347
Is this the total percentage of the property that can be cooled by mechanical equipment?
This includes all types of cooling from central air to individual window units.
Notes:
Parking: Parking Use
1) Open Parking Lot Size: 10,000 ft²
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Is this the total area that is lit and used for parking vehicles? Open Parking Lot Size
refers specifically to open area, which may include small shading covers but does not
include any full structures with roofs. Parking lot size may include the area of parking
spots, lanes, and driveways.
2) Partially Enclosed Parking Garage Size: 0 ft²
Is this the total area of parking structures that are partially enclosed? This includes
parking garages where each level is covered at the top, but the walls are partially or fully
open.
3) Completely Enclosed Parking Garage: 0 ft²
Is this the total area of parking structures that are completely enclosed on all four sides
and have a roof? This includes underground parking or fully enclosed parking on the first
few stories of a building.
4) Supplemental Heating: No
Is this the correct answer to whether your parking garage has Supplemental Heating,
which is a heating system to pre-heat ventilation air and/or maintain a minimum
temperature during winter months?
Notes:
Office: Office Space - Vacant
1) Gross Floor Area: 50,000 ft²
Is this the total size, as measured between the outside surface of the exterior walls
of the building(s)? This includes all areas inside the building(s) such as: occupied
EPA Form 5900-197
Page 4 of 8
Tracking Number: APP-20200504-0-10875726
Generated On: May 4, 2020
OMB No. 2060-0347
tenant areas, common areas, meeting areas, break rooms, restrooms, elevator shafts,
mechanical equipment areas, and storage rooms. Gross Floor Area should not include
interstitial plenum space between floors, which may house pipes and ventilation. Gross
Floor Area is not the same as rentable, but rather includes all area inside the building(s).
Leasable space would be a sub-set of Gross Floor Area. In the case where there is an
atrium, you should count the Gross Floor Area at the base level only. Do not increase
the size to accommodate open atrium space at higher levels. The Gross Floor Area
should not include any exterior spaces such as balconies or exterior loading docks and
driveways.
2) Weekly Operating Hours: 40
Yes
No
Yes
No
Yes
No
Yes
No
Is this the total number of hours per week that the property is occupied by the majority
of the employees? It does not include hours when the HVAC system is starting up or
shutting down, or when property is occupied only by maintenance, security, cleaning
staff, or other support personnel. For properties with a schedule that varies during the
year, use the schedule most often followed.
3) Number of Workers on Main Shift: 0
Is this the total number of workers present during the primary shift? This is not a total
count of workers, but rather a count of workers who are present at the same time. For
example, if there are two daily eight hour shifts of 100 workers each, the Number of
Workers on Main Shift value is 100. Number of Workers on Main Shift may include
employees of the property, sub-contractors who are onsite regularly, and volunteers
who perform regular onsite tasks. Number of Workers should not include visitors to the
buildings such as clients, customers, or patients.
4) Number of Computers: 0
Is this the total number of computers, laptops, and data servers at the property? This
number should not include tablet computers, such as iPads, or any other types of office
equipment.
5) Percent That Can Be Cooled: 100
Is this the total percentage of the property that can be cooled by mechanical equipment?
This includes all types of cooling from central air to individual window units.
Notes:
3. Review of Energy Consumption
Data Overview
Site Energy Use Summary
Electric - Grid (kBtu)
Total Energy (kBtu)
Energy Intensity
Site (kBtu/ft²)
Source (kBtu/ft²)
EPA Form 5900-197
10,692,118 (100%)
10,692,118
43.5
121.8
National Median Comparison
National Median Site EUI (kBtu/ft²)
National Median Source EUI (kBtu/ft²)
% Diff from National Median Source
EUI
69.1
193.4
-37%
Emissions (based on site energy use)
Page 5 of 8
Tracking Number: APP-20200504-0-10875726
Generated On: May 4, 2020
OMB No. 2060-0347
Greenhouse Gas Emissions (Metric
Tons CO2e)
1,151.5
Power Generation Plant or Distribution Utility:
Virginia Electric & Power Co
Note: All values are annualized to a 12-month period. Source Energy includes energy used in generation and transmission to enable an equitable assessment.
Summary of All Associated Energy Meters
The following meters are associated with the property, meaning that they are added together to get the total energy use for the
property. Please see additional tables in this checklist for the exact meter consumption values. Note: please review all meter
entries, making note of any unusual entries, and, if they are correct, provide a manual note to explain.
Meter Name
Fuel Type
Start Date
End Date
Associated With:
Electric Grid Meter
Electric - Grid
01/01/2010
In Use
ICF Office
Total Energy Use
Yes
No
Yes
No
Yes
No
Do the meters shown above account for the total energy use of this property during the
reporting period of this application?
Additional Fuels
Do the meters above include all fuel types at the property? That is, no additional fuels such as
district steam, generator fuel oil have been excluded.
On-Site Solar and Wind Energy
Are all on-site solar and wind installations reported in this list (if present)? All on-site systems
must be reported.
Notes:
Electric - Grid Meter: Electric Grid Meter (kWh (thousand Watt-hours))
Associated With: ICF Office
Start Date
End Date
Usage
Green Power?
01/05/2019
02/05/2019
300,200
No
02/05/2019
03/05/2019
30,500
No
EPA Form 5900-197
Page 6 of 8
Tracking Number: APP-20200504-0-10875726
Generated On: May 4, 2020
OMB No. 2060-0347
Start Date
End Date
Usage
Green Power?
03/05/2019
04/05/2019
257,420
No
04/05/2019
05/05/2019
250,950
No
05/05/2019
06/05/2019
258,450
No
06/05/2019
07/05/2019
310,000
No
07/05/2019
08/05/2019
310,200
No
08/05/2019
09/05/2019
305,360
No
09/05/2019
10/05/2019
294,500
No
10/05/2019
11/05/2019
263,200
No
11/05/2019
12/05/2019
260,840
No
12/05/2019
01/05/2020
282,480
No
01/05/2020
02/05/2020
311,200
No
Total Consumption (kWh (thousand
Watt-hours)):
3,435,300
Total Consumption (kBtu (thousand
Btu)):
11,721,243.6
Total Energy Consumption for this Meter
Yes
No
Do the fuel consumption totals shown above include consumption of all energy tracked
through this meter that affect energy calculations for the reporting period of this application
(i.e., do the entries match the utility bills received by the property)?
Notes:
4. Signature & Stamp of Verifying Licensed Professional
12/04/2019 (Date). Based on the conditions observed at the time
Kate Rubin
___________________
(Name) visited this site on ___________
of the visit to this property, I verify that the information contained within this application is accurate and in accordance
with the Licensed Professional Guide.
Signature _______________________
05/07/2020
Date _________
EPA Form 5900-197
Page 7 of 8
Tracking Number: APP-20200504-0-10875726
Generated On: May 4, 2020
OMB No. 2060-0347
Licensed Professional
License: U.S. License 050517 in VA
Kate Rubin
9300 Lee Highway
Fairfax, VA 22031
2222222222
[email protected]
NOTE: When applying for the ENERGY STAR, the signature of the
Verifying Professional must match the stamp.
Professional Engineering Stamp
5. Signatory Agreement
I hereby nominate the above described property for award of the ENERGY STAR. I have provided a copy of the
Licensed Professionals Guide to the ENERGY STAR for Commercial Buildings to our Licensed Professional (LP) for
reference. As documented by the above checklist, this property meets the conditions necessary to qualify as ENERGY
STAR. I will assist EPA/NRCan, if requested, in verifying any data included in this application. Furthermore, I agree to
associate the ENERGY STAR logo only with this property and to adhere to the ENERGY STAR Identity Guidelines.
Signature (must be a direct employee of the building owner/manager): _______________________
05/07/2020
Date: _________
Signatory Name: Kate Rubin
Property Owner: ICF International
The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional
facility inspection, and notarizing the SEP) and welcomes suggestions for reducing this level of effort. Send comments (referencing OMB control
number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460
EPA Form 5900-197
Page 8 of 8
Tracking Number: APP-20200504-0-10875726
Generated On: May 4, 2020
File Type | application/pdf |
File Modified | 2020-05-07 |
File Created | 2020-05-04 |