Procedures for Implementing the National Environmental Policy Act (NEPA) and Assessing the Environmental Effects Abroad of EPA Actions (Renewal)

OMB: 2020-0033

Document [docx]
Download: docx | pdf

SUPPORTING STATEMENT

For Renewal of Information Collection Requirements under the

Paperwork Reduction Act, 44 U.S.C. 3501 et seq.


40 CFR Part 6:

Procedures for Implementing the National Environmental Policy Act and

Assessing the Environmental Effects Abroad of EPA Actions



OMB Control No. 2020-0033, EPA ICR No. 2243.10





Table of Contents

List of Acronyms iv

1. IDENTIFICATION OF THE INFORMATION COLLECTION 1

1(a) Title of the Information Collection 1

1(b) Abstract 1

2. NEED FOR AND USE OF THE COLLECTION 3

2(a) Need/Authority for the Collection 3

2(b) Practical Utility/Users of the Data 3

3. NONDUPLICATION, CONSULTATIONS, AND OTHER COLLECTION CRITERIA 4

3(a) Nonduplication 4

3(b) Public Notice Requirement Regarding ICR Submission to OMB 4

3(c) Consultations 4

3(d) Effects of Less Frequent Collection 5

3(e) General Guidelines 5

3(f) Confidentiality 5

3(g) Sensitive Questions 5

4. THE RESPONDENTS AND THE INFORMATION REQUESTED 6

4(a) Respondents 6

4(b) Information Requested 8

5. THE INFORMATION COLLECTED -- AGENCY ACTIVITIES, COLLECTION METHODOLOGY, AND INFORMATION MANAGEMENT 11

5(a) Agency Activities 11

5(b) Collection Methodology and Management 12

5(c) Small Entity Flexibility 12

5(d) Collection Schedule 14

6. ESTIMATING THE BURDEN OF THE COLLECTION 14

6(a) Estimated Respondent Burden 14

6(b) Estimated Respondent Costs 16

6(b)(i) Estimating Labor Costs 16

6(b)(ii) Estimating Capital and Operations and Maintenance Costs 16

6(b)(iii) Capital/Start-up Operating and Maintenance Costs 17

6(b)(iv) Annualizing Capital Costs 17

6(c) Estimated Agency Burden and Cost 17

6(d) Estimated Respondent Universe and Total Burden and Costs 18

6(e) Bottom Line Burden Hours and Costs Tables 20

6(f) Reasons for Change in Burden 21

6(g) Burden Statement 21

PART B OF THE SUPPORTING STATEMENT 23

STATISTICAL SURVEY 23

ATTACHMENT 1 TO THE SUPPORTING STATEMENT 24

Exemptions from NEPA for Certain EPA Actions and the EPA’s Voluntary
NEPA Policy and Procedures
24







List of Acronyms



CE Categorical Exclusion

CEQ Council on Environmental Quality

CFR Code of Federal Regulations

EA Environmental Assessment

EID Environmental Information Document

EIS Environmental Impact Statement

EPA Environmental Protection Agency

FONSI Finding of No Significant Impact

FR Federal Register

ICR Information Collection Request

MPRSA Marine Protection, Research, and Sanctuaries Act

NEPA National Environmental Policy Act of 1969

NPDES National Pollutant Discharge Elimination System

OMB Office of Management and Budget

ROD Record of Decision

STAG State and Tribal Assistance Grants

USC United States Code

WIFIA Water Infrastructure Finance and Innovation Act

SUPPORTING STATEMENT

For Renewal of Information Collection Requirements under the

Paperwork Reduction Act, 44 U.S.C. 3501 et seq.


40 CFR Part 6:

Procedures for Implementing the National Environmental Policy Act and

Assessing the Environmental Effects Abroad of EPA Actions





1. IDENTIFICATION OF THE INFORMATION COLLECTION



1(a) Title of the Information Collection



"Procedures for Implementing the National Environmental Policy Act and Assessing the Environmental Effects Abroad of EPA Actions” (40 CFR Part 6); Office of Management and Budget (OMB) Control Number 2020-0033; EPA ICR Number 2243.10.



1(b) Abstract



The National Environmental Policy Act (NEPA), 42 U.S.C. 4321-4347, establishes a national policy for the environment. The Council on Environmental Quality (CEQ) oversees the NEPA implementation. The CEQ’s NEPA implementation regulations at 40 CFR parts 1500 - 1508 set the standard for NEPA compliance. CEQ’s NEPA regulations also require agencies to establish their own NEPA implementing procedures. The Environmental Protection Agency’s (EPA) procedures for implementing NEPA are found in 40 CFR part 6. Through 40 CFR part 6, the EPA adopted the CEQ regulations and supplemented those regulations for actions proposed by the EPA that are subject to the NEPA requirements.

Compliance of the EPA’s actions subject to 40 CFR part 6 is the responsibility of the EPA's Responsible Officials. For applicant-proposed actions, certain procedures apply to applicants (that is grantees and permit applicants) who must submit environmental information to the EPA as part of the environmental review process. The EPA Responsible Official is responsible for the environmental review process, including any categorical exclusion (CE) determination1 or the scope, accuracy, and contents of a final environmental assessment (EA) or environmental impact statement (EIS) and any supporting documents. The applicant contributes by submitting environmental information to the EPA as part of the environmental review process. The applicant may submit information to the Responsible Official regarding the applicability of a CE and request a determination by the Responsible Official. If the applicant-proposed action is not eligible for a CE, the Responsible Official may gather information and prepare the NEPA documents without assistance from the applicant, or have the applicant prepare an environmental information document (EID) or a draft EA and supporting documents or implement a third-party contract agreement with the applicant.

40 CFR part 6 also includes the EPA’s procedures, “Assessing the Environmental Effects Abroad of EPA Actions,” that implement Executive Order 12114, “Environmental Effects Abroad of Major Federal Actions" (see 46 FR 3364). The EPA’s Executive Order 12114 procedures further the purpose of NEPA and provide that the EPA may be guided by its NEPA procedures to the extent they are applicable.2 Therefore, when the EPA conducts an EA pursuant to its Executive Order 12114 procedures, the Agency generally follows its NEPA procedures. Compliance with the procedures is the responsibility of the EPA’s Responsible Officials and for applicant-proposed actions, applicants may be required to provide environmental information to the EPA as part of the environmental review process.

This request renews the “Procedures for Implementing the National Environmental Policy Act and Assessing the Environmental Effects Abroad of EPA Actions” ICR by updating the information contained in the previously approved ICR for 40 CFR part 6.

2. NEED FOR AND USE OF THE COLLECTION



2(a) Need/Authority for the Collection



The CEQ NEPA regulations (40 CFR 1507.3) require federal agencies to adopt and, as needed, revise their own implementing procedures to supplement the CEQ NEPA regulations. The purpose of 40 CFR part 6 is to satisfy the procedural requirements of the CEQ NEPA regulations that are applicable to the EPA actions. Additionally, 40 CFR part 6 includes the EPA's environment review procedures implementing Executive Order 12114. The EPA is collecting information from certain applicants as part of the process of complying with either NEPA or Executive Order 12114 per 40 CFR part 6.



2(b) Practical Utility/Users of the Data



The EPA’s NEPA regulations apply to the actions of the EPA that are subject to NEPA to ensure that environmental information is available to the Agency's decision-makers and the public before decisions are made and before actions are taken. This includes actions such as wastewater treatment construction grants under section 201 of the Clean Water Act, the EPA’s issuance of new source National Pollutant Discharge Elimination System (NPDES) permits as defined in section 306 of the Clean Water Act, certain research and development projects, the EPA actions involving renovations at or new construction of EPA facilities, water and wastewater infrastructure projects funded under the Water Infrastructure Finance and Innovation Act (WIFIA), and certain grants awarded for projects authorized by Congress through the Agency’s annual appropriations act. The EPA actions subject to NEPA that are based on applicant proposals may include any of these except the EPA actions for construction of special purpose facilities or facility renovations of EPA facilities. The 40 CFR part 6 also include the EPA’s procedures implementing Executive Order 12114. These procedures ensure that environmental information is available to the Agency’s decision-makers and other appropriate federal agencies and officials for actions subject to Executive Order 12114.



3. NONDUPLICATION, CONSULTATIONS, AND OTHER COLLECTION CRITERIA



3(a) Nonduplication



For both the NEPA and Executive Order 12114 implementing procedures, the information submitted by an applicant does not duplicate information otherwise submitted to the government. For an EPA action subject to NEPA that is based on an applicant proposal, the applicant (e.g., grantee or permit applicant) would submit information used by the Responsible Official during the environmental review process. This one-time submission is specific to the applicant's proposed action to provide project-specific information necessary for the Responsible Official’s environmental review of the proposed action.





3(b) Public Notice Requirement Regarding ICR Submission to OMB



The Office of Federal Activities published a Notice in the Federal Register for this ICR renewal on June 28, 2022, during a 60-day comment period. The notice requested public comments on the Agency’s need for the information outlined in this ICR, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including the use of automated collection techniques.

The EPA established a public docket for this ICR renewal under Docket ID number EPA-HQ-OA-2019-0296. The EPA requested that any comments related to this ICR renewal be submitted to the EPA. The EPA’s docket is available online at regulations.gov and through the EPA Docket Center – Public Reading Room, William Jefferson Clinton (WJC) West Building, Room 3334, 1301 Constitution Avenue, NW, Washington, D.C. 20004. The public may use the public docket to obtain a copy of the ICR including the Supporting Statement, review public comments, access the index listing of the contents of the public docket, and to access those documents in the public docket that are available electronically.



3(c) Consultations



The EPA actions subject to NEPA or Executive Order 12114 that are based on applicant proposals are one-time only and involve various government jurisdictions and businesses rather than repeated requests for information from specific government jurisdictions and businesses. The EPA relied on information available from its NEPA practitioners and their experience working with grantees and permit applicants to prepare the burden estimates in this ICR. These are the same EPA practitioners that conduct the assessments of applicant-proposed actions subject to NEPA or Executive Order 12114 as further discussed in Section 4(a) of this Supporting Statement. The NEPA practitioners stated that they felt that the amount and frequency of information required was appropriate for the environmental reviews. They did not provide suggestions of how to enhance the quality, utility and clarity of information, or suggestions of how to minimize the burden on the public.



3(d) Effects of Less Frequent Collection



Under 40 CFR part 6, respondents submit project-specific information only for the EPA actions subject to NEPA or Executive Order 12114 that are based on applicant proposals (as further discussed in Section 4(a)). Such actions are generally one-time requests from the EPA for environmental information from applicants requesting grant assistance for specific projects subject to NEPA or for new source NPDES permits to be issued by the EPA. There are no ongoing or periodic reporting or recordkeeping requirements.



3(e) General Guidelines



The information submitted by applicants would be consistent with the guidelines of the OMB in 5 CFR 1320.5(d)(2). For an applicant-proposed action, the applicant (e.g., grantee or permit applicant) submits information to the EPA's Responsible Official as part of the environmental review process. This is a one-time submission specific to the applicant's proposed action to provide project-specific information necessary for the environmental review of the proposed action. The Responsible Official, however, may ask the applicant to provide additional information if the Responsible Official needs it to prepare the EA or EIS. There are no schedule requirements or requirements on the number of copies of the documentation to be submitted or requirements for ongoing reporting or recordkeeping or to conduct statistical surveys.



3(f) Confidentiality



40 CFR part 6 does not require applicants to submit confidential, proprietary or trade secret information.



3(g) Sensitive Questions



40 CFR part 6 does not require applicant response to sensitive questions (e.g., questions concerning sexuality, religious beliefs, or other matters usually considered private).



4. THE RESPONDENTS AND THE INFORMATION REQUESTED



4(a) Respondents



Those subject to 40 CFR part 6 includes the EPA officials who must comply with NEPA or Executive Order 12114, and certain grant or permit applicants who must submit an EID to the EPA for their projects. For purposes of delineating the information collection requirements under the PRA, 44 U.S.C. 3501 et seq., "applicants" (e.g., grantees or permit applicants) are the respondents (e.g., the persons who must generate, maintain, or provide information to or for a federal agency).

The EPA actions generally subject to NEPA include wastewater treatment construction grants under section 201 of the Clean Water Act, issuance of new source NPDES permits by the EPA, certain research and development grants, the EPA actions for construction of special purpose facilities or facility renovations of EPA facilities, water and wastewater infrastructure projects funded under the WIFIA, and certain grants awarded for projects authorized by Congress through the Agency’s annual appropriations act. The EPA actions subject to NEPA that are based on applicant proposals may include any of these except the EPA actions for construction of special purpose facilities or facility renovations of EPA facilities. The EPA Responsible Official is responsible for the environmental review process, including any categorical exclusion determination or the scope, accuracy, and contents of a final EA or EIS and any supporting documents. The applicant may contribute by submitting environmental information to the EPA as part of the environmental review process.

The EPA actions typically subject to Executive Order 12114 include major EPA actions which affect the environment of a foreign nation or the global commons and may include: major research or demonstration projects, ocean dumping activities carried out under section 102 of the Marine Protection, Research, and Sanctuaries Act (MPRSA) (33U.S.C. 1401 et seq.), major permitting or licensing of facilities by the EPA,3 Wastewater Treatment Construction Grant Program under section 201 of the Clean Water Act when activities addressed in the facility plan would have environmental effects abroad, and other EPA activities as determined by the EPA.

Wastewater Treatment Construction Grants Program facilities under section 201 of the Clean Water Act or new source NPDES permits to be issued by the EPA for facilities in the U.S. bordering Mexico or Canada are subject to the EPA’s NEPA implementing procedures. If these facilities could have significant environmental effects abroad, generally they would also be subject to the EPA’s procedures implementing Executive Order 12114. In addition, the EPA has determined that certain grants awarded for projects authorized by Congress through the Agency’s annual appropriations act are subject to NEPA. Typically, these are state and tribal assistance grants (STAG) that involve projects in the U.S. bordering Mexico or Canada that could have significant environmental effects abroad and generally would be subject to the EPA’s procedures implementing Executive Order 12114.

Further, certain actions subject to the EPA’s Executive Order 12114 implementing procedures are not subject to the EPA’s NEPA implementing procedures. As with the EPA’s current part 6 regulations, the EPA’s Executive Order 12114 implementing procedures provide that: (a) for ocean dumping activities, the information submitted under 40 CFR part 221 is sufficient to satisfy the environmental assessment requirements; and (b) for permits issued under section 3005 of the Resource Conservation and Recovery Act, section 402 of the Clean Water Act, and section 165 of the Clean Air Act, the information submitted by applicants for such permits or approvals under the applicable consolidated permit regulations (40 CFR parts 122 and 124) and Prevention of Significant Deterioration regulations (40 CFR part 52) satisfy the environmental document requirements of Executive Order 12114.

In summary, the applicant burden for any applicant-proposed actions, including permitting or licensing, under these authorities is already addressed under the EPA’s ICRs for these programs and is not further addressed in this ICR. However, the applicant burden for any EPA action subject to NEPA and/or Executive Order 12114 that is based on an applicant proposal, including STAG actions subject to NEPA and new source NPDES permits issued by the EPA, is addressed in this ICR. The EPA’s Executive Order 12114 implementing procedures further the purpose of NEPA and provide that the EPA may be guided by the CEQ regulations to the extent they are applicable. Therefore, when the EPA conducts an EA pursuant to its Executive Order 12114 procedures, the Agency generally follows the CEQ regulations and the procedures in the EPA’s NEPA implementing regulations. For these reasons, for applicant-proposed actions subject to either NEPA or Executive Order 12114 (and that are not addressed in other EPA programs’ ICRs), the remainder of this ICR Supporting Statement will evaluate the respondent burden only with regard to the EPA’s NEPA implementing procedures.

For purposes of this ICR, the EPA considers the model respondents to be two types of applicants:

  • Grant applicants applying to the EPA for funding of projects identified in the STAG account4 authorized by Congress through the Agency’s annual appropriations act. These applicants are generally governmental jurisdictions.

  • Permit applicants applying to the EPA for issuance of new source NPDES permits under section 402 of the Clean Water Act.5 Because of the large number of facilities requiring permits, the EPA issues general permits for certain discharges. A general permit is an NPDES permit that covers multiple facilities that have similar discharges and are in a specific geographic area. A general permit applies the same or similar conditions to all dischargers covered under the general permit. Using a general permit to cover numerous facilities reduces paperwork for permitting authorities and permittees and ensures consistency of permit conditions for similar facilities.



4(b) Information Requested



For the EPA actions subject to NEPA, the Responsible Official may determine that the proposed action does not individually or cumulatively have a significant effect on the human environment and may, therefore, be categorically excluded from further NEPA review. If the proposed action is not categorically excluded, the Responsible Official may prepare an EA to determine whether to prepare an EIS or a FONSI. The Responsible Official prepares an EIS if the proposed action will have a significant effect on the human environment. For the EPA actions subject to NEPA that are based on applicant proposals, the Responsible Official may gather the information and prepare the NEPA documents without environmental information submitted by the applicant, or have the applicant prepare an EID, or a draft EA and supporting documents, or implement a third-party agreement with the applicant.6

The level of NEPA documentation and the project-specific information the Responsible Official needs for decision-making is determined by the potential for environmental impact of the action, or the facility to be permitted or the project to be funded by the action rather than the dollar amount of the project or whether the applicant is a grantee or permit applicant.7 Table 1 summarizes the information to be submitted by an applicant for a CE determination, an EA and FONSI, and an EIS and Record of Decision (ROD). There are no schedule requirements or requirements on the number of copies of the information document to be submitted or requirements for ongoing reporting or recordkeeping.





Table 1. Summary of Information Submitted by Applicants for CEs, EAs/FONSIs, and EISs/RODs

Categorical Exclusion (CE) means a category of actions which do not individually or cumulatively have a significant effect on the human environment and have been found by the EPA to have no such effect. To find that a proposed action is categorically excluded, the Responsible Official needs to determine that the proposed action fits within a CE that is listed in the regulations, and the proposed action does not involve any extraordinary circumstances as listed in the regulations. “Extraordinary circumstances” mean those circumstances in which a normally excluded action may have a significant environmental effect. Based on review of information in the applicant’s application and other available information, the Responsible Official notifies the applicant if the action is categorically excluded, or if the EPA needs additional information to support the application of a categorical exclusion.

Information Submitted by Applicant: The applicant may provide statements or documents to the Responsible Official to verify that the proposed action would not involve any of the listed extraordinary circumstances.

  • For example, the applicant might submit information to support a categorical exclusion determination for an action that meets the criteria for “actions in unsewered communities relating to the use of proposed wastewater on-site technologies where such technologies replace existing systems.” If the project area is known to be near a property with nationally significant historic value, the applicant would likely enclose a letter from the State Historic Preservation Officer that confirms the proposed project will not have a significant environmental effect on the historic property. The applicant letter may also verify there are no wetlands in the project area.

Environmental Assessments (EAs) need to include sufficient information and analysis for the Responsible Official to determine whether to prepare an EIS or to issue a FONSI.

Information Submitted by Applicant: The applicant submits an EID of sufficient scope to enable the Responsible Official to prepare an EA, and then determine whether to issue a FONSI or prepare an EIS. At the discretion of the Responsible Official, the applicant may prepare a draft EA and supporting documents in lieu of an EID.

  • An EID for an EA, or a draft EA and supporting documents, generally will: (1) include brief discussions of the need for the proposed action; the alternatives, including the no action alternative; description of the affected environment; and the environmental impacts of the proposed action and alternatives; (2) include a listing or summarize any coordination or consultation undertaken with any federal agency, state or local government, or federally-recognized Indian tribe, including compliance with applicable laws and executive orders; (3) identify and describe any mitigation measures that must be considered, including any mitigation measures that must be adopted to ensure the action will not have significant impacts; and (4) incorporate documents by reference.

Environmental Impact Statements (EISs) are generally prepared for major actions that may significantly affect the quality of the human environment, or when an EA indicates that significant impacts may occur that cannot be reduced or eliminated by changes to or mitigation of the proposed action. A ROD documents the decision of the Responsible Official.

Information Submitted by Applicant: The applicant submits an EID of sufficient scope to enable the Responsible Official to prepare an EIS and ROD. In lieu of submitting documentation, the Responsible Official and the applicant may enter into a third-party contract agreement. The information needed for an EIS parallels the information needed for an EA with a focus on assessment of significant environmental issues and alternatives.

  • An EID for an EIS generally will: (1) provide the EPA with information the agency will use to prepare an EIS; (2) analyze all reasonable alternatives and the no action alternative; (3) describe the potentially affected environment including, as appropriate, the size and location of new and existing facilities, land requirements, operation and maintenance requirements, auxiliary structures such as pipelines or transmission lines, and construction schedules; (4) summarize any coordination or consultation undertaken with any federal agency, state or local government, or federally-recognized Indian tribe, including compliance with applicable laws and executive orders; (5) the draft EIS must summarize any public meetings during the scoping process, and the final EIS must summarize the public participation process held after publication of the draft EIS; (6) the draft EIS must consider substantive comments received during the scoping process, and the final EIS must summarize all comments on the draft EIS and respond to any substantive comments and explain any changes to a revised draft EIS or the final EIS and the reasons for the changes; and (7) include the names and qualifications of the persons primarily responsible for preparing the EIS including significant background papers.



5. THE INFORMATION COLLECTED -- AGENCY ACTIVITIES, COLLECTION METHODOLOGY, AND INFORMATION MANAGEMENT



5(a) Agency Activities



Compliance with the regulations is the responsibility of the EPA's Responsible Officials. For applicant-proposed actions, grantees or permit applicants must submit environmental information to the EPA as part of the environmental review process unless the Responsible Official decides to prepare the NEPA documents without assistance from the applicant. As noted in Table 1 above, the Responsible Official may determine that the action is categorically excluded; prepare an EA to determine whether to issue a FONSI; or prepare an EIS and ROD.



5(b) Collection Methodology and Management



Whether the NEPA documents are based on environmental information developed by the Responsible Official or submitted by the applicant, the NEPA review and resulting documents generally rely on the use of existing data and information, including data and information from other federal agencies, state or local governments, or federally recognized Indian tribes with jurisdiction by law or special expertise.

Whether the NEPA documents are prepared by the Responsible Official or based on environmental information submitted by the applicant, the quality of the information provided by an applicant must be sufficient to enable the Responsible Official to make a decision. This is accomplished under the EPA’s NEPA implementing procedures through: (1) early coordination and cooperation with federal agencies, state and local governments, and federally recognized Indian tribes with jurisdiction by law or special expertise (see 40 CFR 6.202); and (2) the public participation process associated with actions other than those categorically excluded8 (see 40 CFR 6.203). When the environmental information is provided by the applicant, the Responsible Official is responsible for the statements, analyses, and conclusions of the EA or EIS and any supporting documents.

The information compiled is a one-time submission in narrative text format (see 40 CFR 6.205 and 6.207) rather than computerized compilations of data and information. There are no forms, checklists, or ongoing reporting, recordkeeping or file-maintenance requirements for applicants (see Subpart C). The EPA maintains file records for each action.



5(c) Small Entity Flexibility



The information collected under this ICR is one-time only for applicant-proposed actions, e.g., actions proposed by grantees seeking funding assistance from the EPA or for an NPDES permit application initiated by the permit applicant. In either case, the EPA assumes the action will directly benefit the applicant (such as a grantee seeking grant funding for renovation of a community drinking water system, or a permit applicant seeking a new source NPDES permit from the EPA to further the applicant’s business interests). Nonetheless, if the applicant cannot afford to provide the required environmental information to the EPA, then the EPA would undertake the environmental review without input from the applicant.9 Further, grantees may be grant-eligible for certain costs associated with providing environmental information to the EPA.10 Permit applicants are not eligible for the EPA financial assistance.

The EPA has reduced the burden on small entities (including businesses and government jurisdictions) through the following provisions in the EPA’s NEPA implementing procedures:

  • Section 6.300: An EID is not required when the action is categorically excluded, or the applicant will prepare a draft EA and supporting documents. The Responsible Official may prepare the NEPA documents without environmental information submitted by the applicant.

  • Section 6.302:

    • The Responsible Official may prepare generic guidance for categories of actions involving a large number of applicants; and must ensure early involvement of applicants, consult with the applicant and provide guidance describing the scope and level of environmental information required, and provide guidance on a project-by-project basis to any applicant seeking assistance.

    • The Responsible Official must consider the extent to which the applicant is capable of providing the required information, may not require the applicant to gather data or perform analyses that unnecessarily duplicate either existing data or the results of existing analyses available to the EPA, and must limit the request for environmental information to that necessary for the environmental review.

  • Section 6.303: An applicant may enter into a third-party agreement with the EPA. (For grantees, certain third-party contractor costs may be eligible for cost reimbursement; see footnote 10. However, new source NPDES permit applicants are not eligible for the EPA financial assistance.)





5(d) Collection Schedule



Information must be submitted by an applicant only for the EPA actions subject to NEPA that are based on applicant proposals unless the EPA will prepare the NEPA documents without environmental information submitted by the applicant. The information to be submitted is required only when an applicant applies for a grant for an action subject to NEPA or a new source NPDES permit to be issued by the EPA, a one-time application process. The Responsible Official, however, may ask the applicant to provide additional information if the Responsible Official needs it to prepare the EA or EIS. There are no schedules in the regulations for this collection process.



6. ESTIMATING THE BURDEN OF THE COLLECTION



The content of the environmental information submitted by an applicant for a draft EA and supporting documents and an EID for a draft EA and supporting documents is similar. There may be a financial difference for grantees in that the EPA financial assistance generally may be used to prepare an EID but not to prepare a draft EA and supporting documents (see footnote 10). New source NPDES permit applicants are not eligible for the EPA financial assistance. The applicant may also enter into a third-party agreement whereby the applicant engages and pays for the services of a contractor to prepare the draft EA and supporting documents.

The content of the environmental information submitted by an applicant for a draft EIS and supporting documents and an EID for a draft EIS and supporting documents is similar. For grantees, third-party contractor costs may be eligible for cost reimbursement (see footnote 10). New source NPDES permit applicants are not eligible for the EPA financial assistance. Although an applicant may contract for preparation of an EID for a draft EIS, because EISs are generally more complex than EAs in terms of the issues to be addressed and the associated analyses, it has generally been the EPA’s experience that applicants will enter into a third-party agreement with the EPA for preparation of the EIS and supporting documents.



6(a) Estimated Respondent Burden



For an EPA action subject to NEPA that is based on an applicant proposal, the applicant would generally submit information to the EPA Responsible Official as part of the environmental review process as delineated in Section 4(b), Table 1. As noted above, the EPA assumes the applicant will use a contractor to compile and prepare the environmental information to be submitted to the Responsible Official. For the applicant, the burden11 includes the time and costs needed to:

  1. Procure contractor services.

  2. Review instructions (such as the regulations and any program-specific guidelines the Responsible Official may also provide) and/or meet with the Responsible Official.

  3. Research data sources.

  4. Complete and review the collection of environmental information.

  5. Transmit the information to the Responsible Official.

  6. Meet with the Responsible Official on the need for any revisions to the environmental information and prepare and submit any necessary revisions to the information.

The applicant would not be required to develop, acquire, install, or utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; or train personnel to be able to respond to a collection of information; nor would there be requirements for ongoing reporting or recordkeeping.

An estimation of the hours per document type is provided below and is included in Section 6(d), Table 4.

  • For CEs, the EPA estimates that applicants may use 50 hours per project to prepare any supplemental information requested by the EPA to prepare the CE documentation.

  • For EAs, the EPA estimates that applicants may use 260 hours per project to prepare any supplemental information or EID requested by the EPA for the EA documentation.

  • For EISs, the EPA estimates that applicants may use 2,840 hours per project to prepare any supplemental information or EID requested by the EPA for the EIS documentation.

The number of respondents by application type are presented below.



Table 2. The number of annual respondents by application type.

Type of Information

Number of Grant Respondents

Number of Permit Respondents

CE

310

2

EA/FONSI

200

2

EIS/ROD

1*

1*

TOTALS

511

5

* The EPA estimates one project will have an EIS/ROD completed during the three-year life of this ICR. For this table, the number of respondents for an EIS/ROD has been calculated annually.



6(b) Estimated Respondent Costs



6(b)(i) Estimating Labor Costs



Grantee applicants are assumed to be state and local government or federally-recognized Indian tribes. Permit applicants are assumed to be civilian worker applicants. Using the national mean wage estimates for management and professional occupations derived from the Bureau of Labor Statistics, the EPA estimated wage for grant and permit applicants is as follows:

  • Applicant Wage Rate:12 $59.31 x 1.43 = $84.81 per hour



6(b)(ii) Estimating Capital and Operations and Maintenance Costs



Start-up costs for the NEPA documentation for the EPA grant or permit applications and associated forms are minimal and are part of customary and usual recipient business expenses. There are no capital costs related to the NEPA documentation for the EPA grant or permit applications and related reporting requirements.



6(b)(iii) Capital/Start-up Operating and Maintenance Costs



There are no capital costs related to the NEPA documentation for the EPA grant or permit applications and related reporting requirements. There are no operating and maintenance costs required.



6(b)(iv) Annualizing Capital Costs



This subsection is not applicable.



6(c) Estimated Agency Burden and Cost



For the EPA actions subject to NEPA that are based on grant or permit applicant proposals, the EPA may: (1) prepare the NEPA documents without assistance from the applicant; or (2) prepare the NEPA documents based on information submitted by the applicant (and any other supplemental information).

  • The EPA Wage Rate:13 $55.33 per hour

  • For CEs, the EPA estimates it prepares CE documentation based on the information in the grant or permit application and supplemental information gathered directly by the EPA using about 50 hours per project.

  • For EAs, the EPA estimates it prepares the documentation based on the information in the grant or permit application and supplemental information gathered directly by the EPA using an estimated 120 hours.

  • For EISs, the EPA estimates it prepares the documentation based on the information in the grant or permit application and supplemental information gathered directly by the EPA using an estimated 530 hours. The EPA estimated that one EIS/ROD may be required during the three-year life of this ICR.



Table 3. One-Time, Annual Estimated Burden and Cost for the EPA

EPA

Information Type

HOURS AND COST PER RESPONDENT

TOTAL HOURS AND COSTS

EPA Hours/Year

Labor Cost/Year

O & M Cost

Number of Respondents

Total Hours/Year

Total Costs/Year

Grants

CE

50

$2,767

$0

310

15,500

$857,770

EA/FONSI

120

$6,640

$0

200

24,000

$1,328,000

EIS/ROD*

530

$29,325

$0

1

530

$29,325

Permits

CE

50

$2,767

$0

2

100

$ 5,532

EA/FONSI

120

$6,640

$0

2

240

$13,280

EIS/ROD*

530

$29,325

$0

1

530

$29,325

Subtotals

1,400

$77,464

$0

516

40,900

$2,263,232

* The EPA estimates one project will have an EIS/ROD completed during the three-year life of this ICR. For this table, the cost and hour estimates have been calculated annually.



6(d) Estimated Respondent Universe and Total Burden and Costs



The information collected under this ICR is one-time only for the EPA actions subject to NEPA that are based on applicant proposals. Grantees or permit applicants must submit environmental information to the EPA as part of the environmental review process unless the Responsible Official decides to prepare the NEPA documents without assistance from the applicant. If the applicant cannot afford to provide the required environmental information to the EPA, then the EPA would undertake the environmental review without input from the applicant (see footnote 9). Further, grantees may be grant-eligible for certain costs associated with providing environmental information to the EPA (see footnote 10); permit applicants are not eligible for the EPA financial assistance.

  • For CEs, the EPA estimates that applicants may use 50 hours per project to prepare any supplemental information requested by the EPA to prepare the CE documentation.

  • For EAs, the EPA estimates that applicants may use 260 hours per project to prepare any supplemental information or EID requested by the EPA for the EA documentation.

  • For EISs, the EPA estimates that applicants may use 2,840 hours per project to prepare any supplemental information or EID requested by the EPA for the EIS documentation.

Grant Applicants: Respondents are those who apply to the EPA for funding of projects identified in the STAG account authorized by Congress through the agency’s annual appropriations act. These applicants are generally governmental jurisdictions. Such grants are authorized by Congress, and subsequently awarded by the EPA. Specifically, STAG account actions subject to NEPA and addressed in this ICR include congressional earmarks. As of 2010, earmarks under the STAG account have not been awarded. However, in the 2022 annual appropriations act, Congress authorized congressionally directed spending projects (earmarks). The EPA anticipates that approximately 1,500 NEPA documents will be completed for the congressionally directed spending grants during the three-year life of this ICR, with approximately 500 requiring documentation completed annually. The EPA estimates that 300 of the earmark projects will be documented with a CE, and about 200 projects with an EA/FONSI. The EPA has not issued an EIS/ROD for a grant under the STAG account in the past twelve years and assumes no EIS will be prepared in the next three years. However, for purposes of this ICR, the EPA estimated that one EIS/ROD may be required during the three-year life of this ICR. In addition, the EPA anticipates that approximately 10 grants will be documented annually with a CE for the Title II wastewater treatment construction grant program.14

Permit Applicants: Respondents are those who also apply to the EPA for issuance of new source NPDES permits under Section 402 of the Clean Water Act. The EPA issues new source NPDES permits only in states and U.S. territories that have not assumed authority for this program (see Section (4(a)). Because most states have assumed the NPDES program, few new source NPDES permits are issued by the EPA. Initially, these projects are documented with EAs/FONSIs. Actions involving re-issuance of a NPDES permit for a new source may be categorically excluded providing the conclusions of the original NEPA document remain valid (including the appropriate mitigation), there will be no degradation of the receiving waters, and the permit conditions do not change or are more environmentally protective (see 40 CFR 6.205(a)(1)(iv)). As such, the EPA anticipates that 13 NEPA documents will be completed for new-source NPDES permits during the three-year life of this ICR. For the three-year life of this ICR, the EPA estimates that annually that two projects will be documented by a CE; two projects will be documented with an EA/FONSI. The EPA estimated that one EIS/ROD may be required during the three-year life of this ICR.



Table 4. One-Time, Annual Estimated Burden Hours and Costs for Grant and Permit Applicants

Respondent

Information Type

HOURS AND COSTS PER RESPONDENT

TOTAL HOURS AND COSTS

Respondent Hours/Year

Labor Cost/Year

O & M Cost

Number of Respondents

Total Hours/Year

Total Costs/Year

Grants

CE

50

$4,241

$0

310

15,500

$1,314,710

EA/FONSI

260

$22,051

$0

200

52,000

$4,410,200

EIS/ROD*

2,840

$240,860

$0

1

2840

$240,860

Permits

CE

50

$4,241

$0

2

100

$8,482

EA/FONSI

260

$22,051

$0

2

520

$44,102

EIS/ROD*

2,840

$240,860

$0

1

2840

$240,860

Subtotals

6,300

$534,304

$0

516

73,800

$6,259,214

*The EPA estimates one project will have an EIS/ROD completed during the three-year life of this ICR. For this table, the cost and burden hour estimates have been calculated annually.



6(e) Bottom Line Burden Hours and Costs Tables



The information collected under this ICR is one-time only on a per-project basis for the EPA actions subject to NEPA that are based on applicant proposals. Grantees or permit applicants submit environmental information to the EPA as part of the environmental review process unless the Responsible Official decides to prepare the NEPA documents without assistance from the applicant. The NEPA review for a project may result in a CE, or an EA/FONSI, or an EIS/ROD. For any specific project, only one of these levels of documentation is generally prepared. Based on the EPA’s experience, most projects annually will be documented with a CE. In addition, the EPA estimates that one project will have an EIS/ROD completed during the three-year life of this ICR.





Table 5. Summary of Aggregate Total Annual Estimated Costs and Hours for Applicants and the EPA


Burden Hours

Cost

Respondents

73,800

$6,259,214

EPA

40,900

$2,263,232



6(f) Reasons for Change in Burden



The overall respondent burden has increased from the previous ICR by 66,240 hours (from 7,560 hours to 73,800 hours). This adjustment occurred due to a significant increase in size of the respondent universe as a result of the return of congressional earmarks in the EPA annual appropriation act. The EPA carefully reviewed the grant and permit programs covered by this ICR to obtain an accurate reflection of the number of projects that may require NEPA documentation (CE, EA/FONSI, EIS/ROD). This information was collected from the EPA program offices, the EPA NEPA compliance database [https://cdxapps.epa.gov/cdx-enepa-II/public/action/nepa/search], and the EPA EIS database [https://cdxapps.epa.gov/cdx-enepa-II/public/action/eis/search].



6(g) Burden Statement

The annual public reporting and recordkeeping burden for this collection of information is estimated at 27,004 hours. This burden reflects an annual one-time submission of documentation for an anticipated 516 applicant-proposed projects that may be documented with a CE, or an EA/FONSI, or an EIS/ROD. Under the ICR renewal, the EPA assumes there will be approximately 510 grantee projects annually with about 310 of these projects documented with a CE, and about 200 with an EA/FONSI. For permit applicants, the EPA assumes there will be approximately five projects annually with about two documented with a CE, two documented with an EA/FONSI, and one project will have an EIS/ROD once every three-years.

Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; research data sources; complete and review the collection of information; and transmit or otherwise disclose the information. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control numbers for the EPA’s regulations are listed in 40 CFR part 9 and 48 CFR chapter 15.

To comment on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including the use of automated collection techniques, EPA has established a public docket for this ICR under Docket ID Number [EPA-HQ-OA-2019-0296 (previously EPA-HQ-OECA-2005-0062)], which is available for online viewing at www.regulations.gov, or in person viewing at the Office of the Administrator docket in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Avenue, NW, Washington, D.C. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566-1744, and the telephone for the Office of the Administrator docket is (202) 566-1752. An electronic version of the public docket is available at www.regulations.gov. This site can be used to submit or view public comments, access the index listing of the contents of the public docket, and to access those documents in the public docket that are available electronically. When in the system, select “search,” then key in the Docket ID Number identified above. Also, you can send comments to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 17th Street, NW, Washington, D.C. 20503, Attention: Desk Officer for EPA. Please include the EPA Docket ID Number EPA-HQ-OA-2019-0296 and OMB Control Number 2020-0033 in any correspondence.



PART B OF THE SUPPORTING STATEMENT

STATISTICAL SURVEY





This collection of information does not use or is otherwise based on a statistical survey.



ATTACHMENT 1 TO THE SUPPORTING STATEMENT



Exemptions from NEPA for Certain EPA Actions and the EPA’s Voluntary NEPA Policy and Procedures



Exemptions from NEPA for Certain EPA Actions

Certain EPA actions are exempt from the procedural requirements of NEPA, and thus are also exempt from the CEQ NEPA regulations. Congress has provided specific statutory exemptions for most EPA actions taken under the Clean Water Act and all EPA actions taken under the Clean Air Act from the procedural requirements of NEPA, including the CEQ NEPA Regulations. Specifically, under Section 511(c)(1) of the Clean Water Act (33 U.S.C. 1371), the EPA is exempt from the procedural requirements of NEPA for all actions taken under the Act except for issuance of National Pollution Discharge Elimination System permits under Section 402 for “new sources” as defined in Section 306 of the Clean Water Act (33 U.S.C 1342), and Federal financial assistance for the construction of publicly owned treatment works under Section 201 of the Clean Water Act (33 U.S.C. 1281). Under the Energy Supply and Environmental Coordination Act of 1974 (15 U.S.C. 793(c)(1)), all actions taken under the Clean Air Act are deemed not to be major Federal actions significantly affecting the environment The EPA is also exempted from the procedural requirements of environmental laws, including NEPA, for the Comprehensive Environmental Response, Compensation, and Liability Act response actions. See Section 121(d)(2)(A) of the Act, as interpreted by the EPA in 40 CFR 300.5 and 300.400(g).

Further, the courts have exempted certain EPA actions from the procedural requirements of NEPA based on the functional equivalence doctrine. Under the functional equivalence doctrine, courts have found the EPA to be exempt from the procedural requirements of NEPA for certain actions under the Federal Insecticide, Fungicide, and Rodenticide Act, the Resource Conservation and Recovery Act, the Toxic Substances Control Act, the Safe Drinking Water Act, and the Marine Protection, Research, and Sanctuaries Act. The courts reasoned that the EPA actions under these statutes perform the functionally equivalent of a NEPA review because they are undertaken with consideration of environmental impacts and opportunities for public involvement. See, e.g., Merrill v. Thomas, 807 F.2d 776 (9th Cir. 1986); State of Alabama v. EPA, 911 F. 2d 499 (11th Cir. 1990); Warren County v. North Carolina, 528 F. Supp. 276 (E.D. N.C. 1981); Western Nebraska Resources Council v. US EPA, 943 F.2d 867 (8th Cir. 1991); Maryland v. Train, 415 F. Supp. 116 (D. Md. 1976).



The EPA's Voluntary NEPA Policy and Procedures

The Agency’s current "Statement of Policy for Voluntary Preparation of National Environmental Policy Act (NEPA) Documents" (see 63 FR 58045) sets out the policy and procedures the EPA uses when voluntarily preparing environmental review documents in situations when doing so would be helpful to decision-making.

1 Certain actions eligible for a categorical exclusion may require the Responsible Official to document the determination that a categorical exclusion applies. See 40 CFR 6.204 for documentable and non-documentable categorical exclusions.

22 The courts have determined, and the CEQ has issued guidelines, that NEPA does not apply to federal agency actions significantly affecting the environment of the global commons or the environment of a foreign nation not participating with the United States and not otherwise involved in the action. The Executive Order is “... solely for the purpose of establishing internal procedures for Federal agencies to consider the significant effects of their actions on the environment outside the [U.S.], its territories and possessions ...” [Executive 0rder 12114, Section 3-1].

3 This may include such actions as the EPA-issued permits for hazardous waste treatment, storage, or disposal facility under section 3005 of the Resource Conservation and Recovery Act (42 U.S.C. 6925), NPDES permits under section 402 of the Clean Water Act (33 U.S.C. 1342), and prevention of significant deterioration approvals under part C of the Clean Air Act (42 U.S.C. 7470 et seq.).

4 Approximately 75% of the EPA’s grants are under the STAG appropriations account. Certain line items in the STAG appropriations account are not subject to NEPA (see Attachment 1). Grantee actions subject to NEPA are predominately under the STAG appropriations account (including consideration of the Wastewater Treatment Construction Grants Program under section 201 of the Clean Water Act). Other actions subject to NEPA may include those under the Agency’s Environmental Programs and Management account or Science and Technology account.

5 The EPA issues new source NPDES permits in areas where the EPA is the NPDES permitting authority, which includes three states (Massachusetts, New Hampshire, and New Mexico), Washington, D.C., all U.S. territories except the Virgin Islands, most Indian country lands, federal facilities in four additional states (Colorado, Delaware, Vermont, and Washington), and a few additional areas as specified on the Specific State Program Status page at https://www.epa.gov/npdes/npdes-state-program-information. All other states have the authority to issue permits.

6 If an EA or EIS is to be prepared for an action subject to NEPA, the Responsible Official and the applicant may enter into an agreement whereby the applicant engages and pays for the services of a third-party contractor to prepare an EA or EIS and any supporting documents. The Responsible Official has sole authority for approval and modification of the statements, analyses, and conclusions of the EA or EIS and any supporting documents. Because EISs are generally more complex than EAs in terms of the issues to be addressed and the associated analyses, it has generally been the EPA’s experience that grantees and permit applicants will enter into third-party agreements with the EPA for preparation of the EIS and supporting documents.

7 For example, a grantee action for renovation of an existing wastewater treatment or drinking water supply system may be categorically excluded. An EA may be required for a grantee action to construct a new sewage treatment system in a small governmental jurisdiction; or to assess a new source NPDES permit for a discharge of a pollutant. An EIS may be required for a grantee action to construct a new sewage treatment plant with potential for significant impacts to wetlands, or cultural or archaeological features; or to assess a new source NPDES permit for discharges from an oil and gas extraction facility with potential for significant impacts to wetlands, or cultural or archaeological features, or threatened or endangered species.

8 The Responsible Official must make a copy of the determination document, if required, available to the public upon request.

9 Applicants would normally be requested to demonstrate financial hardship, including inability to provide the requested environmental information. If so demonstrated, then the EPA would undertake the environmental review necessary for the grant or permit action.

10 Under appropriate grant conditions, grantees generally may use the EPA financial assistance to prepare an EID but not to prepare a draft EA and supporting documents. Third-party contract costs for an EID may also be grant-eligible. For grantee contractor costs to be reimbursable, grantees must meet certain contractor requirements, including procurement criteria. However, it has been the EPA’s experience that applicants often use in-house engineering contractors for preparing CE and EA-related environmental documents usually without seeking cost reimbursement.

11 For purposes of this ICR: Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; research data sources; complete and review the collection of information; and transmit or otherwise disclose the information.





12 $59.31 represents the average wage rate of several occupations expected to apply for STAG grants and permits. This information is derived from the Bureau of Labor Statistics; Occupational Employment and Wages, May 2021. This figure was derived from the median hourly wage for the Bureau of Labor Statistics “Occupational Employment and Wages: Management Occupations” available at https://www.bls.gov/oes/current/oes110000.htm (accessed 5/31/2022). 1.43 represents a 43% rate for benefits.

13 Office of Personal Management; 2022 General Schedule (GS) Base (Hourly Rate) for GS 11, Step 9 ($34.58). Available at https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2022/GS_h.pdf (accessed 5/31/2022). This was fully burdened (x60%), yielding a wage rate of $55.33.

14 The Clean Water Act Title II wastewater treatment construction grants program effectively ended when authorizations for it expired after FY1990. However, Congress has allowed the District of Columbia, and the U.S. territories of U.S. Virgin Islands, Guam, American Samoa, and the Commonwealth of the Northern Mariana Islands to receive annual allotments as Title II construction grants. EPA allots a portion of the Drinking Water State Revolving Fund (DWSRF) and Clean Water State Revolving Fund (CWSRF) as grants to the District of Columbia, the U.S. Virgin Islands, and the Pacific trust territories for drinking water and wastewater infrastructure. Congress exempted the District and the U.S. territories from establishing state revolving loan fund programs. The District and the U.S. territories listed above instead chose to continue receiving funds under the Construction Grants Program.



3



File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy