Overview

Investigative; Schematic Design
Design Development
Construction Documents
CPS and Site Visits
Certifications (if applicable)
Fee Check for AE
Fee Check for Gov't IGE


Sheet 1: Investigative; Schematic Design


OMB Number: 2900-0208, Estimated Burden: 4 hours, Expiration date: 02/28/2025














ARCHITECT - ENGINEER FEE PROPOSAL Investigative Services / Schematic Design / Other Related Services
The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will average 4 hours. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. This form or other agreed upon format, is used by VA Resident Engineers to supervise your work and verify the work progression so that you may be paid.
ESTIMATED NUMBER OF CONTRACT DRAWINGS DATE


A/E VA
ARCHITECTURAL


PROJECT TITLE AND LOCATION
SITE AND LANDSCAPING



STRUCTURAL AND BORINGS


FIRE PROTECTION


HEATING AND AIR CONDITIONING


PLUMBING


ELECTRICAL


NAME OF ARCHITECT / ENGINEER













TOTAL NUMBER OF DRAWINGS


PART I - INVESTIGATIVE SERVICES / SCHEMATIC DESIGN / OTHER RELATED SERVICES
LINE
NO.
A. SALARY COSTS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
A/E VA A/E VA
ARCHITECTURAL
1A Senior Project Architect




1B Junior Architect




1C Senior Project Interior Designer




1D Junior Interior Designer




1E Specification / Technical Writer




1F Senior Cost Estimator




1G Drafter / CADD Technician




1H Administrative Assistant




1I





1J SUBTOTAL

SITE AND LANDSCAPING
2A Senior Project Civil Engineer




2B Junior Civil Engineer




2C Senior Project Landscape Architect




2D Junior Landscape Architect




2E Senior Project Environmental Engineer




2F Junior Environmental Engineer




2G Engineering Technician




2H Specification / Technical Writer




2I Senior Cost Estimator




2J Drafter / CADD Technician




2K Administrative Assistant




2L





2M SUBTOTAL

STRUCTURAL AND BORINGS
3A Senior Project Structural Engineer




3B Junior Structural Engineer




3C Senior Project Geotechnical Engineer




3D Junior Geotechnical Engineer




3E Engineering Technician




3F Specification / Technical Writer




3G Senior Cost Estimator




3H Drafter / CADD Technician




3I Administrative Assistant




3J





3K SUBTOTAL

FIRE PROTECTION
4A Senior Project Fire Protection Engineer




4B Junior Fire Protection Engineer




4C Enginnering Technician




4D Specification / Technical Writer




4E Senior Cost Estimator




4F Drafter / CADD Technician




4G Administrative Assistant




4H





4I SUBTOTAL


PART I - INVESTIGATIVE SERVICES / SCHEMATIC DESIGN / OTHER RELATED SERVICES (Continued)
LINE NO. A. SALARY COSTS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
A/E VA A/E VA
HEATING AND AIR CONDITIONING
5A Senior Project Mechanical Engineer




5B Junior Mechanical Engineer




5C Engineering Technician




5D Specification / Technical Writer




5E Senior Cost Estimator




5F Drafter / CADD Technician




5G Administative Assistant




5H





5I SUBTOTAL

PLUMBING
6A Senior Project Plumbing Engineer




6B Junior Plumbing Engineer




6C Engineering Technician




6D Specification / Technical Writer




6E Senior Cost Estimator




6F Drafter / CADD Technician




6G Administrative Assistant




6H





6I SUBTOTAL

ELECTRICAL
7A Senior Project Electrical Engineer




7B Junior Electrical Engineer




7C Engineering Technician




7D Specification / Technical Writer




7E Senior Cost Estimator




7F Drafter / CADD Technician




7G Administrative Assistant




7H





7I SUBTOTAL

PROJECT MANAGEMENT
8A Principal




8B





8C





8D





8E SUBTOTAL

QA/QC REVIEWS
9A Senior Project Architect




9B Senior Project Civil Engineer




9C Senior Project Structural Engineer




9D Senior Project Fire Protection Engineer




9E Senior Project Mechanical Engineer




9F Senior Project Plumbing Engineer




9G Senior Project Electrical Engineer




9H





9H SUBTOTAL

10 TOTAL SALARY COSTS #VALUE! #VALUE!

B. MISCELLANEOUS SALARY COSTS
LINE NO. DESIGN STAFF SITE TRIPS EMPLOYEE-DAYS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA
11A Project Designer




#VALUE!

#VALUE!
11B Junior Designer




#VALUE!

#VALUE!
11C Engineering Technician




#VALUE!

#VALUE!
11D





#VALUE!

#VALUE!
11E





#VALUE!

#VALUE!
11F SUBTOTAL
#VALUE!

DESIGN REVIEW TRIPS EMPLOYEE-DAYS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA
12A Project Designer




#VALUE!

#VALUE!
12B Junior Designer




#VALUE!

#VALUE!
12C Engineering Technician




#VALUE!

#VALUE!
12D





#VALUE!

#VALUE!
12E





#VALUE!

#VALUE!
12F SUBTOTAL
#VALUE!

B. MISCELLANEOUS SALARY COSTS (Continued)

[OTHER AUTHORIZED TRIPS] EMPLOYEE-DAYS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA
13A





#VALUE!

#VALUE!
13B





#VALUE!

#VALUE!
13C





#VALUE!

#VALUE!
13D





#VALUE!

#VALUE!
13E





#VALUE!

#VALUE!
13F SUBTOTAL
#VALUE!
14 TOTAL MISCELLANEOUS SALARY COSTS #VALUE! #VALUE!
15 TOTAL SALARY COSTS - (Lines 10 + 14) #VALUE! #VALUE!
16 OVERHEAD
% OF LINE 15 #VALUE! #VALUE!
17 PROFIT
% #VALUE! #VALUE!
18 TOTAL SALARY PROPOSAL - (Lines 15 + 16 + 17) #VALUE! #VALUE!

C. INCIDENTAL COSTS
LINE NO. DESIGN STAFF SITE TRIPS EMP. TRIPS TRAVEL COSTS EMP. TRIPS PER DIEM COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA A/E VA A/E VA
19A First











19B Second











19C Third











19D Fourth











19E












19F SUBTOTAL


DESIGN REVIEW TRIPS EMP. TRIPS TRAVEL COSTS EMP. TRIPS PER DIEM COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA A/E VA A/E VA
20A First











20B Second











20C Third











20D Fourth











20E












20F SUBTOTAL


[OTHER AUTHORIZED TRIPS] EMP. TRIPS TRAVEL COSTS EMP. TRIPS PER DIEM COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA A/E VA A/E VA
21A First











21B Second











21C Third











21D Fourth











21E












21F SUBTOTAL


C. INCIDENTAL COSTS (Continued)

SURVEYS / INVESTIGATIONS, as applicable DETAILED DESCRIPTION OF INCIDENTAL COSTS
22A Site / Topographic Survey


22B Soil Survey / Tests


22C Geotechnical / Subsurface Exploration


22D Test Borings / Test Pits


22E


22F SUBTOTAL


REPRODUCTION OF REVIEW DOCS, as applicable DETAILED DESCRIPTION OF INCIDENTAL COSTS
23A SD Drawings


23B SD Specifications


23C SD Cost Estimate


23D Investigative Services Reports / Material


23E


23F SUBTOTAL


[OTHER INCIDENTALS] DETAILED DESCRIPTION OF INCIDENTAL COSTS
24A



24B



24C



24D



24E


24F SUBTOTAL

25 TOTAL INCIDENTAL COSTS #VALUE! #VALUE!
26 *TOTAL INVESTIGATIVE SERVICES / SCHEMATIC DESIGN / OTHER RELATED SERVICES COSTS - (Lines 18 +25) #VALUE! #VALUE!
NOTES:
*The 6% fee limitation does not apply to Investigative Services / Schematic Design or Other Related Services. See VAAR 836.606-71 / VAAM M836.606-73 for further details.
*Design Staff Site Trips = trips for site surveying, meeting with CORs/End Users to gather data/input, etc.
*Design Review Trips = trips for the AE to present deliverables of a particular phase as an on-site meeting
*The SoW will dictate how many Design Staff Site Trips & Design Review Trips are anticipated for the design project. The COR, CO and the AE will negotiate final number of trips and disciplines needed for those trips.
REMARKS


Sheet 2: Design Development


OMB Number: 2900-0208, Estimated Burden: 4 hours, Expiration date: 02/28/2025














ARCHITECT - ENGINEER FEE PROPOSAL Design Development
The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will average 4 hours. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. This form or other agreed upon format, is used by VA Resident Engineers to supervise your work and verify the work progression so that you may be paid.
ESTIMATED NUMBER OF CONTRACT DRAWINGS DATE


A/E VA
ARCHITECTURAL


PROJECT TITLE AND LOCATION
SITE AND LANDSCAPING



STRUCTURAL AND BORINGS


FIRE PROTECTION


HEATING AND AIR CONDITIONING


PLUMBING


ELECTRICAL


NAME OF ARCHITECT / ENGINEER













TOTAL NUMBER OF DRAWINGS


PART II - DESIGN DEVELOPMENT
LINE
NO.
A. SALARY COSTS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
A/E VA A/E VA
ARCHITECTURAL
1A Senior Project Architect




1B Junior Architect




1C Senior Project Interior Designer




1D Junior Interior Designer




1E Specification / Technical Writer




1F Senior Cost Estimator




1G Drafter / CADD Technician




1H Administrative Assistant




1I





1J SUBTOTAL

SITE AND LANDSCAPING
2A Senior Project Civil Engineer




2B Junior Civil Engineer




2C Senior Project Landscape Architect




2D Junior Landscape Architect




2E Senior Project Environmental Engineer




2F Junior Environmental Engineer




2G Engineering Technician




2H Specification / Technical Writer




2I Senior Cost Estimator




2J Drafter / CADD Technician




2K Administrative Assistant




2L





2M SUBTOTAL

STRUCTURAL AND BORINGS
3A Senior Project Structural Engineer




3B Junior Structural Engineer




3C Senior Project Geotechnical Engineer




3D Junior Geotechnical Engineer




3E Engineering Technician




3F Specification / Technical Writer




3G Senior Cost Estimator




3H Drafter / CADD Technician




3I Administrative Assistant




3J





3K SUBTOTAL

FIRE PROTECTION
4A Senior Project Fire Protection Engineer




4B Junior Fire Protection Engineer




4C Enginnering Technician




4D Specification / Technical Writer




4E Senior Cost Estimator




4F Drafter / CADD Technician




4G Administrative Assistant




4H





4I SUBTOTAL


PART II - DESIGN DEVELOPMENT (Continued)
LINE NO. A. SALARY COSTS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
A/E VA A/E VA
HEATING AND AIR CONDITIONING
5A Senior Project Mechanical Engineer




5B Junior Mechanical Engineer




5C Engineering Technician




5D Specification / Technical Writer




5E Senior Cost Estimator




5F Drafter / CADD Technician




5G Administative Assistant




5H





5I SUBTOTAL

PLUMBING
6A Senior Project Plumbing Engineer




6B Junior Plumbing Engineer




6C Engineering Technician




6D Specification / Technical Writer




6E Senior Cost Estimator




6F Drafter / CADD Technician




6G Administrative Assistant




6H





6I SUBTOTAL

ELECTRICAL
7A Senior Project Electrical Engineer




7B Junior Electrical Engineer




7C Engineering Technician




7D Specification / Technical Writer




7E Senior Cost Estimator




7F Drafter / CADD Technician




7G Administrative Assistant




7H





7I SUBTOTAL

PROJECT MANAGEMENT
8A Principal




8B





8C





8D





8E SUBTOTAL

QA/QC REVIEWS
9A Senior Project Architect




9B Senior Project Civil Engineer




9C Senior Project Structural Engineer




9D Senior Project Fire Protection Engineer




9E Senior Project Mechanical Engineer




9F Senior Project Plumbing Engineer




9G Senior Project Electrical Engineer




9H





9I SUBTOTAL

10 TOTAL SALARY COSTS #VALUE! #VALUE!

B. MISCELLANEOUS SALARY COSTS
LINE NO. DESIGN STAFF SITE TRIPS EMPLOYEE-DAYS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA
11A Project Designer




#VALUE!

#VALUE!
11B Junior Designer




#VALUE!

#VALUE!
11C Engineering Technician




#VALUE!

#VALUE!
11D





#VALUE!

#VALUE!
11E





#VALUE!

#VALUE!
11F SUBTOTAL
#VALUE!

DESIGN REVIEW TRIPS EMPLOYEE-DAYS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA
12A Project Designer




#VALUE!

#VALUE!
12B Junior Designer




#VALUE!

#VALUE!
12C Engineering Technician




#VALUE!

#VALUE!
12D





#VALUE!

#VALUE!
12E





#VALUE!

#VALUE!
12F SUBTOTAL
#VALUE!

B. MISCELLANEOUS SALARY COSTS (Continued)

[OTHER AUTHORIZED TRIPS] EMPLOYEE-DAYS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA
13A





#VALUE!

#VALUE!
13B





#VALUE!

#VALUE!
13C





#VALUE!

#VALUE!
13D





#VALUE!

#VALUE!
13E





#VALUE!

#VALUE!
13F SUBTOTAL
#VALUE!
14 TOTAL MISCELLANEOUS SALARY COSTS #VALUE! #VALUE!
15 TOTAL SALARY COSTS - (Lines 10 + 14) #VALUE! #VALUE!
16 OVERHEAD
% OF LINE 15 #VALUE! #VALUE!
17 PROFIT
% #VALUE! #VALUE!
18 TOTAL SALARY PROPOSAL - (Lines 15 + 16 + 17) #VALUE! #VALUE!

C. INCIDENTAL COSTS
LINE NO. DESIGN STAFF SITE TRIPS EMP. TRIPS TRAVEL COSTS EMP. TRIPS PER DIEM COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA A/E VA A/E VA
19A First











19B Second











19C Third











19D Fourth











19E












19F SUBTOTAL


DESIGN REVIEW TRIPS EMP. TRIPS TRAVEL COSTS EMP. TRIPS PER DIEM COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA A/E VA A/E VA
20A First











20B Second











20C Third











20D Fourth











20E












20F SUBTOTAL


[OTHER AUTHORIZED TRIPS] EMP. TRIPS TRAVEL COSTS EMP. TRIPS PER DIEM COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA A/E VA A/E VA
21A First











21B Second











21C Third











21D Fourth











21E












21F SUBTOTAL


C. INCIDENTAL COSTS (Continued)

REPRODUCTION OF REVIEW DOCS, as applicable DETAILED DESCRIPTION OF INCIDENTAL COSTS
22A DD Drawings


22B DD Specifications


22C



22D



22E


22F SUBTOTAL


RENDERINGS DETAILED DESCRIPTION OF INCIDENTAL COSTS
23A Exterior Perspective


23B Interior Perspective


23C Site Plan


23D Floor Plan


23E


23F SUBTOTAL


[OTHER INCIDENTALS] DETAILED DESCRIPTION OF INCIDENTAL COSTS
24A



24B



24C



24D



24E


24F SUBTOTAL

25 TOTAL INCIDENTAL COSTS #VALUE! #VALUE!
26 *TOTAL DESIGN DEVELOPMENT COSTS - (Lines 18 +25) #VALUE! #VALUE!
NOTES:
*The 6% fee limitation applies to Lines 1 - 21. It doesn't not include incidental costs for reproduction,etc. See VAAR 836.606-71 / VAAM M836.606-73 for further details.
*Design Staff Site Trips = trips for site surveying, meeting with CORs/End Users to gather data/input, etc.
*Design Review Trips = trips for the AE to present deliverables of a particular phase as an on-site meeting
*The SoW will dictate how many Design Staff Site Trips & Design Review Trips are anticipated for the design project. The COR, CO and the AE will negotiate final number of trips and disciplines needed for those trips.
REMARKS


Sheet 3: Construction Documents


OMB Number: 2900-0208, Estimated Burden: 4 hours, Expiration date: 02/28/2025














ARCHITECT - ENGINEER FEE PROPOSAL Construction Documents
The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will average 4 hours. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. This form or other agreed upon format, is used by VA Resident Engineers to supervise your work and verify the work progression so that you may be paid.
ESTIMATED NUMBER OF CONTRACT DRAWINGS DATE


A/E VA
ARCHITECTURAL


PROJECT TITLE AND LOCATION
SITE AND LANDSCAPING



STRUCTURAL AND BORINGS


FIRE PROTECTION


HEATING AND AIR CONDITIONING


PLUMBING


ELECTRICAL


NAME OF ARCHITECT / ENGINEER













TOTAL NUMBER OF DRAWINGS


PART III - CONSTRUCTION DOCUMENTS
LINE
NO.
A. SALARY COSTS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
A/E VA A/E VA
ARCHITECTURAL
1A Senior Project Architect




1B Junior Architect




1C Senior Project Interior Designer




1D Junior Interior Designer




1E Specification / Technical Writer




1F Senior Cost Estimator




1G Drafter / CADD Technician




1H Administrative Assistant




1I





1J SUBTOTAL

SITE AND LANDSCAPING
2A Senior Project Civil Engineer




2B Junior Civil Engineer




2C Senior Project Landscape Architect




2D Junior Landscape Architect




2E Senior Project Environmental Engineer




2F Junior Environmental Engineer




2G Engineering Technician




2H Specification / Technical Writer




2I Senior Cost Estimator




2J Drafter / CADD Technician




2K Administrative Assistant




2L





2M SUBTOTAL

STRUCTURAL AND BORINGS
3A Senior Project Structural Engineer




3B Junior Structural Engineer




3C Senior Project Geotechnical Engineer




3D Junior Geotechnical Engineer




3E Engineering Technician




3F Specification / Technical Writer




3G Senior Cost Estimator




3H Drafter / CADD Technician




3I Administrative Assistant




3J





3K SUBTOTAL

FIRE PROTECTION
4A Senior Project Fire Protection Engineer




4B Junior Fire Protection Engineer




4C Enginnering Technician




4D Specification / Technical Writer




4E Senior Cost Estimator




4F Drafter / CADD Technician




4G Administrative Assistant




4H





4I SUBTOTAL


PART III - CONSTRUCTION DOCUMENTS (Continued)
LINE NO. A. SALARY COSTS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
A/E VA A/E VA
HEATING AND AIR CONDITIONING
5A Senior Project Mechanical Engineer




5B Junior Mechanical Engineer




5C Engineering Technician




5D Specification / Technical Writer




5E Senior Cost Estimator




5F Drafter / CADD Technician




5G Administative Assistant




5H





5I SUBTOTAL

PLUMBING
6A Senior Project Plumbing Engineer




6B Junior Plumbing Engineer




6C Engineering Technician




6D Specification / Technical Writer




6E Senior Cost Estimator




6F Drafter / CADD Technician




6G Administrative Assistant




6H





6I SUBTOTAL

ELECTRICAL
7A Senior Project Electrical Engineer




7B Junior Electrical Engineer




7C Engineering Technician




7D Specification / Technical Writer




7E Senior Cost Estimator




7F Drafter / CADD Technician




7G Administrative Assistant




7H





7I SUBTOTAL

PROJECT MANAGEMENT
8A Principal




8B





8C





8D





8E SUBTOTAL

QA/QC REVIEWS
9A Senior Project Architect




9B Senior Project Civil Engineer




9C Senior Project Structural Engineer




9D Senior Project Fire Protection Engineer




9E Senior Project Mechanical Engineer




9F Senior Project Plumbing Engineer




9G Senior Project Electrical Engineer




9H





9I SUBTOTAL

10 TOTAL SALARY COSTS #VALUE! #VALUE!

B. MISCELLANEOUS SALARY COSTS
LINE NO. DESIGN STAFF SITE TRIPS EMPLOYEE-DAYS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA
11A Project Designer




#VALUE!

#VALUE!
11B Junior Designer




#VALUE!

#VALUE!
11C Engineering Technician




#VALUE!

#VALUE!
11D





#VALUE!

#VALUE!
11E





#VALUE!

#VALUE!
11F SUBTOTAL
#VALUE!

DESIGN REVIEW TRIPS EMPLOYEE-DAYS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA
12A Project Designer




#VALUE!

#VALUE!
12B Junior Designer




#VALUE!

#VALUE!
12C Engineering Technician




#VALUE!

#VALUE!
12D





#VALUE!

#VALUE!
12E





#VALUE!

#VALUE!
12F SUBTOTAL
#VALUE!

B. MISCELLANEOUS SALARY COSTS (Continued)

[OTHER AUTHORIZED TRIPS] EMPLOYEE-DAYS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA
13A





#VALUE!

#VALUE!
13B





#VALUE!

#VALUE!
13C





#VALUE!

#VALUE!
13D





#VALUE!

#VALUE!
13E





#VALUE!

#VALUE!
13F SUBTOTAL
#VALUE!
14 TOTAL MISCELLANEOUS SALARY COSTS #VALUE! #VALUE!
15 TOTAL SALARY COSTS - (Lines 10 + 14) #VALUE! #VALUE!
16 OVERHEAD
% OF LINE 15 #VALUE! #VALUE!
17 PROFIT
% #VALUE! #VALUE!
18 TOTAL SALARY PROPOSAL - (Lines 15 + 16 + 17) #VALUE! #VALUE!

C. INCIDENTAL COSTS
LINE NO. DESIGN STAFF SITE TRIPS EMP. TRIPS TRAVEL COSTS EMP. TRIPS PER DIEM COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA A/E VA A/E VA
19A First











19B Second











19C Third











19D Fourth











19E












19F SUBTOTAL


DESIGN REVIEW TRIPS EMP. TRIPS TRAVEL COSTS EMP. TRIPS PER DIEM COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA A/E VA A/E VA
20A First











20B Second











20C Third











20D Fourth











20E












20F SUBTOTAL


[OTHER AUTHORIZED TRIPS] EMP. TRIPS TRAVEL COSTS EMP. TRIPS PER DIEM COSTS

NO.
DAYS
NO. PERS.
REQUIRED
A/E VA A/E VA A/E VA A/E VA A/E VA
21A First











21B Second











21C Third











21D Fourth











21E












21F SUBTOTAL


C. INCIDENTAL COSTS (Continued)

REPRODUCTION OF REVIEW DOCS, as applicable DETAILED DESCRIPTION OF INCIDENTAL COSTS
22A CD Drawings


22B CD Specifications


22C CD Cost Estimate


22D



22E


22F SUBTOTAL


RENDERINGS DETAILED DESCRIPTION OF INCIDENTAL COSTS
23A Exterior Perspective


23B Interior Perspective


23C Site Plan


23D Floor Plan


23E


23F SUBTOTAL


[OTHER INCIDENTALS] DETAILED DESCRIPTION OF INCIDENTAL COSTS
24A



24B



24C



24D



24E


24F SUBTOTAL

25 TOTAL INCIDENTAL COSTS #VALUE! #VALUE!
26 *TOTAL - CONSTRUCTION DOCUMENTS COSTS - (Lines 18 +25) #VALUE! #VALUE!
NOTES:
*The 6% fee limitation applies to Lines 1 - 21. It doesn't not include incidental costs for reproduction,etc. See VAAR 836.606-71 / VAAM M836.606-73 for further details.
*Design Staff Site Trips = trips for site surveying, meeting with CORs/End Users to gather data/input, etc.
*Design Review Trips = trips for the AE to present deliverables of a particular phase as an on-site meeting
*The SoW will dictate how many Design Staff Site Trips & Design Review Trips are anticipated for the design project. The COR, CO and the AE will negotiate final number of trips and disciplines needed for those trips.
CAPITULATION OF A/E COSTS
(WITHOUT CPS/Site Visits)
27 PART I: INVESTIGATE SERVICES / SCHEMATIC DESIGN / OTHER RELATED SERVICES #VALUE! #VALUE!
28 PART II: DESIGN DEVELOPMENT #VALUE! #VALUE!
29 PART III: CONSTRUCTION DOCUMENTS #VALUE! #VALUE!
30 TOTAL A/E COST (Lines 27 + 28 + 29) #VALUE! #VALUE!


Sheet 4: CPS and Site Visits


OMB Number: 2900-0208, Estimated Burden: 4 hours, Expiration date: 02/28/2025













ARCHITECT - ENGINEER FEE PROPOSAL Construction Period Services and Site Visits
The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will average 4 hours. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. This form or other agreed upon format, is used by VA Resident Engineers to supervise your work and verify the work progression so that you may be paid.
ESTIMATED NUMBER OF AS-BUILT CONTRACT DRAWINGS DATE


A/E VA
ARCHITECTURAL


PROJECT TITLE AND LOCATION
SITE AND LANDSCAPING



STRUCTURAL AND BORINGS


FIRE PROTECTION


HEATING AND AIR CONDITIONING


PLUMBING


ELECTRICAL


NAME OF ARCHITECT / ENGINEER













TOTAL NUMBER OF AS-BUILT DRAWINGS


PART IV - CONSTRUCTION PERIOD SERVICES
LINE
NO.
A. SALARY COSTS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
1) Answering RFIs during Bidding (includes providing answers, amendment supporting docs, etc.)
2) Issuance of "For Construction Documents"
3) Post Award RFI, Submittal and Shop Drawing Reviews A/E VA A/E VA
4) Call-In Project Mtgs and All Other CPS Related Tasks Oultined in the Contract, excluding Site Visits/As-Built Dwgs.
ARCHITECTURAL
1A Senior Project Architect




1B Junior Architect




1C Senior Project Interior Designer




1D Junior Interior Designer




1E Specification / Technical Writer




1F Senior Cost Estimator




1G Drafter / CADD Technician




1H Administative Assistant




1I





1J SUBTOTAL

SITE AND LANDSCAPING
2A Senior Project Civil Engineer




2B Junior Civil Engineer




2C Senior Project Landscape Architect




2D Junior Landscape Architect




2E Senior Project Environmental Engineer




2F Junior Environmental Engineer




2G Engineering Technician




2H Specification / Technical Writer




2I Senior Cost Estimator




2J Drafter / CADD Technician




2K Administrative Assistant




2L





2M SUBTOTAL

STRUCTURAL AND BORINGS
3A Senior Project Structural Engineer




3B Junior Structural Engineer




3C Senior Project Geotechnical Engineer




3D Junior Geotechnical Engineer




3E Engineering Technician




3F Specification / Technical Writer




3G Senior Cost Estimator




3H Drafter / CADD Technician




3I Administrative Assistant




3J





3K SUBTOTAL

FIRE PROTECTION
4A Senior Project Fire Protection Engineer




4B Junior Fire Protection Engineer




4C Engineering Technician




4D Specification / Technical Writer




4E Senior Cost Estimator




4F Drafter / CADD Technician




4G Administrative Assistant




4H





4I SUBTOTAL

HEATING AND AIR CONDITIONING
5A Senior Project Mechanical Engineer




5B Junior Mechanical Engineer




5C Engineering Technician




5D Specification / Technical Writer




5E Senior Cost Estimator




5F Drafter / CADD Technician




5G Administrative Assistant




5H





5I SUBTOTAL


PART IV - CONSTRUCTION PERIOD SERVICES (Continued)
LINE NO. A. SALARY COSTS EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
1) Answering RFIs during Bidding (includes providing answers, amendment supporting docs, etc.)
2) Issuance of "For Construction Documents"
3) Post Award RFI, Submittal and Shop Drawing Reviews A/E VA A/E VA
4) Call-In Project Mtgs and All Other CPS Related Tasks Oultined in the Contract, excluding Site Visits/As-Built Dwgs.
PLUMBING
6A Senior Project Plumbing Engineer




6B Junior Plumbing Engineer




6C Engineering Technician




6D Specification / Technical Writer




6E Senior Cost Estimator




6F Drafter / CADD Technician




6G Administrative Assistant




6H





6I SUBTOTAL

ELECTRICAL
7A Senior Project Electrical Engineer




7B Junior Electrical Engineer




7C Engineering Technician




7D Specification / Technical Writer




7E Senior Cost Estimator




7F Drafter / CADD Technician




7G Administrative Assistant




7H





7I SUBTOTAL

[ADDITIONAL LABOR CATEGORY, AS APPLICABLE]
8A





8B





8C





8D SUBTOTAL

9 TOTAL SALARY COSTS #VALUE! #VALUE!
LINE
NO.
B. RECORD (AS BUILT) DRAWINGS AND SPECIFICATIONS
SALARY COSTS
EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
A/E VA A/E VA
ARCHITECTURAL
10A Senior Project Architect




10B Junior Architect




10C Senior Project Interior Designer




10D Junior Interior Designer




10E Specification / Technical Writer




10F Drafter / CADD Technician




10G





10H SUBTOTAL

SITE AND LANDSCAPING
11A Senior Project Civil Engineer




11B Junior Civil Engineer




11C Senior Project Landscape Architect




11D Junior Landscape Architect




11E Senior Project Environmental Engineer




11F Junior Environmental Engineer




11G Specification / Technical Writer




11H Drafter / CADD Technician




11I





11J SUBTOTAL

STRUCTURAL AND BORINGS
12A Senior Project Structural Engineer




12B Junior Structural Engineer




12C Senior Project Geotechnical Engineer




12D Junior Geotechnical Engineer




12E Specification / Technical Writer




12F Drafter / CADD Technician




12G





12H SUBTOTAL

FIRE PROTECTION
13A Senior Project Fire Protection Engineer




13B Junior Fire Protection Engineer




13C Specification / Technical Writer




13D Drafter / CADD Technician




13E





13F SUBTOTAL

HEATING AND AIR CONDITIONING
14A Senior Project Mechanical Engineer




14B Junior Mechanical Engineer




14C Specification / Technical Writer




14D Drafter / CADD Technician




14E





14F SUBTOTAL

PART II - CONSTRUCTION PERIOD SERVICES (CONTINUED)
LINE
NO.
B. RECORD (AS BUILT) DRAWINGS AND SPECIFICATIONS
SALARY COSTS
EMPLOYEE-HOURS HOURLY
SALARIES
COSTS
A/E VA A/E VA
PLUMBING
15A Senior Project Plumbing Engineer




15B Junior Plumbing Engineer




15C Specification / Technical Writer




15D Drafter / CADD Technician




15E





15F SUBTOTAL

ELECTRICAL
16A Senior Project Plumbing Engineer




16B Junior Plumbing Engineer




16C Specification / Technical Writer




16D Drafter / CADD Technician




16E





16F SUBTOTAL

[ADDITIONAL LABOR CATEGORY, AS APPLICABLE]
17A


$10.00

17B


$10.00

17C


$10.00

17D


$10.00

17E SUBTOTAL

18 TOTAL SALARY COSTS (As-Builts) #VALUE! #VALUE!
19 TOTAL SALARY COSTS - (Lines 9 + 18) #VALUE! #VALUE!
20 OVERHEAD
% OF LINE 19 #VALUE! #VALUE!
21 PROFIT
% #VALUE! #VALUE!
22 TOTAL SALARY COSTS - (Lines 19 + 20 + 21) #VALUE! #VALUE!
C. INCIDENTAL COSTS

REPRODUCTION OF "FOR CONSTRUCTION" DOCS Detailed Description of Incidental COSTS
23A For Construction Drawings


23B For Contstruction Specifications


23C



23D


23E SUBTOTAL


REPRODUCTION OF AS-BUILTS Detailed Description of Incidental COSTS
24A As-Built Drawings


24B As-Built Specifications


24C


24D


24E SUBTOTAL


[OTHER INCIDENTALS] Detailed Description of Incidental COSTS
25A


25B


25C


25D


25E SUBTOTAL

26 INCIDENTAL COSTS #VALUE! #VALUE!
27 TOTAL CONSTRUCTION PERIOD SERVICES COSTS - (Lines 22+ 26) #VALUE! #VALUE!
REMARKS
PART III - SITE VISITS
LINE
NO.
A. SALARY COSTS EMP. TRIPS TOTAL HOURS HOURLY
SALARIES
COSTS
A/E VA A/E VA A/E VA
28 PRE-BID CONFERENCE (BIDDING PHASE)

NO. DAYS EMP. PER DAY




#VALUE! #VALUE!



29 PRE-CONSTRUCTION CONFERENCE (POST AWARD) \

NO. DAYS EMP. PER DAY




#VALUE! #VALUE!



30 ON-SITE CONSTRUCTION PROGRESS MEETINGS

NO. MTGS EMP. PER DAY




#VALUE! #VALUE!



31 SITE VISIT(S)
NO. VISITS, ONE EMPLOYEE-DAY EACH




#VALUE! #VALUE!


32 BEHIND WALL - ABOVE CEILING INSPECTION(S)
NO. INSP. NO. DAYS EMP. PER DAY




#VALUE! #VALUE!



33 FINAL INSPECTION(S)
NO. INSP. NO. DAYS EMP. PER DAY




#VALUE! #VALUE!



34









#VALUE! #VALUE!



35 SALARY COSTS - Site Visits #VALUE! #VALUE!
36 OVERHEAD
% OF LINE 35 #VALUE! #VALUE!
37 PROFIT
% #VALUE! #VALUE!
38 TOTAL SALARY COSTS - (Lines 35 + 36 + 37) #VALUE! #VALUE!
PART III - SITE VISITS (CONTINUED)

B. TRAVEL COSTS EMP. TRIPS TRAVEL COSTS EMP. DAYS PER DIEM COSTS
A/E VA A/E VA A/E VA A/E VA A/E VA
39 PRE-BID CONFERENCE (BIDDING PHASE)

NO. DAYS EMP. PER DAY












40 PRE-CONSTRUCTION CONFERENCE (POST AWARD)

NO. DAYS EMP. PER DAY












41 ON-SITE CONSTRUCTION PROGRESS MEETINGS

NO. MTGS EMP. PER DAY












42 SITE VISIT(S)
NO. VISITS, ONE EMPLOYEE-DAY EACH











43 BEHIND WALL - ABOVE CEILING INSPECTION(S)
NO. INSP. NO. DAYS EMP. PER DAY












44 FINAL INSPECTION(S)
NO. INSP. NO. DAYS EMP. PER DAY












45

















46 TOTAL TRAVEL COSTS #VALUE! #VALUE!
47 TOTAL COSTS FOR SITE VISITS - (Lines 38 + 47) #VALUE! #VALUE!

CAPITULATION OF A/E PROPOSAL
(WITH CPS & SITE VISITS)
48 PART I: INVESTIGATE SERVICES / SCHEMATIC DESIGN / OTHER RELATED SERVICES #VALUE! #VALUE!
49 PART II: DESIGN DEVELOPMENT #VALUE! #VALUE!
50 PART III: CONSTRUCTION DOCUMENTS #VALUE! #VALUE!
51 PART IV: CONSTRUCTION PERIOD SERVICES - (Line 27) #VALUE! #VALUE!
52 PART V: SITE VISITS, #VALUE! AT #VALUE! PER VISIT #VALUE! #VALUE!
FOR A MAXIMUM OF: (Line 47)
53 TOTAL A/E COST (Lines 48 + 49 + 50 + 51 + 52) #VALUE! #VALUE!

Sheet 5: Certifications (if applicable)


OMB Number: 2900-0208, Estimated Burden: 4 hours, Expiration date: 02/28/2025













The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this VA form 6298 will be average 4 hours. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. This form or other agreed upon format, is used by VA Resident Engineers to supervise your work and verify the work progression so that you may be paid.
PART VI - CERTIFICATIONS
CERTIFICATION OF CURRENT COST OR PRICING DATA
This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 2.101 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing to the contracting officer or to the contracting officer's representative in support of __________* are accurate, complete, and current as of __________**. This certification includes the cost or pricing data supporting any advance agreements and forward pricing rate agreements between the offeror and the Government that are part of the proposal.
Firm Name Title
Signature Date of Execution***
*Identify the proposal, request for price adjustment, or other submission involved, giving the appropriate identifying number (e.g., RFP no.).
** Insert the day, month, and year when price negotiations were concluded and price agreement was reached or, if applicable, an earlier date agreed upon between the parties that is as close as practicable to the date of agreement on price.
***Insert the day, month, and year of signing, which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to.
NOTE: The Architect-Engineer shall check the certification below which is applicable to their enterprise, and if required, provide the necessary substantiating information.
□ CERTIFICATION OF CONCURRENT SUBMISSION OF DISCLOSURE STATEMENTS
The offeror hereby certifies that, as part of the offer, copies of the Disclosure Statements as follows: (i) Original and one copy to the cognizant Contracting Officer or cognizant Federal agency official authorized to act in that capacity (Federal official), as applicable; and; (ii) one copy to the cognizant Federal auditor. (Disclosure must be on Form No. CASB DS-1 or CASB DS-2, as applicable. Forms may be obtained from the cognizant CO or Federal official.)
DATE OF DISCLOSURE STATEMENT NAME AND ADDRESS OF COGNIZANT CONTRACTING OFFICER WHERE FILED


The offeror further certifies that practices used in estimating costs in pricing this proposal are consistent with the cost accounting practices in the Disclosure Statement.
□ CERTIFICATION FOR PREVIOUSLY SUBMITTED DISCLOSURE STATEMENT
The offeror hereby certifies that the Disclosure Statement was filed as follows:
DATE OF DISCLOSURE STATEMENT NAME AND ADDRESS OF COGNIZANT CONTRACTING OFFICER or FEDERAL OFFICIAL WHERE FILED


The offeror further certifies that practices used in estimating costs in pricing this proposal are consistent with the cost accounting practices in the Disclosure Statement.
□ CERTIFICATION OF MONETARY EXEMPTION
The offeror hereby certifies that the offeror, together with all divisions, subsidiaries, and affiliates under common control, did not receive net awards of negotiated prime contracts and subcontracts subject to CAS totaling $50 million or more in the cost accounting period immediately proceeding the period in which the proposal was submitted. The offeror futher certifies if such status changes before an award resulting from this proposal, the offeror will advise the Contracting Officer immediately.
□ CERTIFICATION OF INTERIM EXEMPTION
The offeror certifies that, (i) the offeror first exceeded the monetary exemption for disclosure, as defined in (3) of this subsection, in the cost accouting period immediately proceeding the period in which this offer was submitted and (ii) in accordance with 48 CFR 9903.202-1, the offeror is not yet required to submit a Disclosure Statement. The offeror further certifies that if an award resulting from this proposal has not been made within 90 days after the end of that period, the offeror will immediately submit a revised certificate to the Contracting Officer, in the form specified under paragraph (c)(1) or (c)(2) of Part I of this provision, as appropriate, to verify submission of a completed Disclosure Statement.
Caution: Offerors currently required to disclose because they were awarded a CAS-covered prime contract of subcontract of $50 million or more in the current cost accouting period may not claim this exemption (4). Further, the exemption applies only in connection with proposals submitted before expiration of the 90-day period following the cost accounting period in which the monetary exemption was exceeed.
CONCUR - SIGNATURE AND TYPED NAME OF ARCHITECT - ENGINEER DATE
CONCUR - SIGNATURE AND TYPED NAME OF ARCHITECT - ENGINEER DATE
CONCUR - SIGNATURE AND TYPED NAME OF ARCHITECT - ENGINEER DATE
CONCUR - SIGNATURE AND TYPED NAME OF CONTRACTING OFFICER DATE
For Official Use Only (FOUO)
To be Completed by the VA Estimator Responsible for the Preparation of the Independent Government Estimate (IGE)
DATE OF IGE: NAME and Title:


SIGNATURE:
DISTRIBUTION: (082A)-CC: AE and Proposed File
The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will average 4 hours. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. This form or other agreed upon format, is used by VA Resident Engineers to supervise your work and verify the work progression so that you may be paid.














Sheet 6: Fee Check for AE

VA Fee Estimate Summary for AE Proposal





Estimated Construction Budget (not including A/E costs)





6% Fee Limitation $0.00











Overhead 0.00%




Profit 0.00%











Application of 6% Fee Limitation





Item Investigative Services / Schematic Design Design Development Construction Documents Construction Period Services Totals Brooks Act Fee Limitation 6%
Part I: Preparation of Contract Drawings and Specifications





Part A: Salary Costs #VALUE! #VALUE! #VALUE! #VALUE!
Part B: Misc Salary Costs #VALUE! #VALUE! #VALUE! #VALUE!
Total Salary Costs #VALUE! #VALUE! #VALUE! #VALUE!
Overhead #VALUE! #VALUE! #VALUE! #VALUE!
Profit #VALUE! #VALUE! #VALUE! #VALUE!
Total Salary Proposal #VALUE! #VALUE! #VALUE! #VALUE!
Part C: Incidential Costs
#VALUE! #VALUE! #VALUE!
(Design Staff Site Trips & Design Review Trips - excludes Reproduction, etc.)




Total applied towards 6%
#VALUE! #VALUE! #VALUE! #VALUE!







AE Costs as a Percentage of Estimated Construction Budget





Item % of Construction Cost Goal
Dollar Goal Actual Actual %
Total Prepare Construction Docs Design Cost 5.50%
$0.00 #VALUE! #VALUE!







Misc. Salary Design Costs


#VALUE!

Mics. Incidental Design Costs


#VALUE!

Total Mics. Design Costs 2.50%
$0.00 #VALUE! #VALUE!










Grand Total #VALUE! #VALUE!







Part II Construction Services Salary Costs


#VALUE!

Part II Incidental Construction Cost


#VALUE!

Part III Construction Site Visit Salary Costs


#VALUE!

Part III Incidental Site Visit Costs


#VALUE!

Total Construction Services 3.50%
$0.00 #VALUE! #VALUE!







TOTALS 11.50%
$0.00 #VALUE! #VALUE!

Sheet 7: Fee Check for Gov't IGE

VA Fee Estimate Summary for Gov't IGE





Estimated Construction Budget (not including A/E costs)





6% Fee Limitation $0.00











Overhead 0.00%




Profit 0.00%











Application of 6% Fee Limitation





Item Investigative Services / Schematic Design Design Development Construction Documents Construction Period Services Totals Brooks Act Fee Limitation 6%
Part I: Preparation of Contract Drawings and Specifications





Part A: Salary Costs #VALUE! #VALUE! #VALUE! #VALUE!
Part B: Misc Salary Costs #VALUE! #VALUE! #VALUE! #VALUE!
Total Salary Costs #VALUE! #VALUE! #VALUE! #VALUE!
Overhead #VALUE! #VALUE! #VALUE! #VALUE!
Profit #VALUE! #VALUE! #VALUE! #VALUE!
Total Salary Proposal #VALUE! #VALUE! #VALUE! #VALUE!
Part C: Incidential Costs
#VALUE! #VALUE! #VALUE!
(Design Staff Site Trips & Design Review Trips - excludes Reproduction, etc.)




Total applied towards 6%
#VALUE! #VALUE! #VALUE! #VALUE!







AE Costs as a Percentage of Estimated Construction Budget





Item % of Construction Cost Goal
Dollar Goal Actual Actual %
Total Prepare Construction Docs Design Cost 5.50%
$0.00 #VALUE! #VALUE!







Misc. Salary Design Costs


#VALUE!

Mics. Incidental Design Costs


#VALUE!

Total Mics. Design Costs 2.50%
$0.00 #VALUE! #VALUE!










Grand Total #VALUE! #VALUE!







Part II Construction Services Salary Costs


#VALUE!

Part II Incidental Construction Cost


#VALUE!

Part III Construction Site Visit Salary Costs


#VALUE!

Part III Incidental Site Visit Costs


#VALUE!

Total Construction Services 3.50%
$0.00 #VALUE! #VALUE!







TOTALS 11.50%
$0.00 #VALUE! #VALUE!
File Typeapplication/vnd.ms-office
File TitleAE Fee Estimate
SubjectEstimates
AuthorKevin S. Russell, PE
Last Modified ByPayne, Sterai C. (C-M JV/Cadre)
File Modified2023-01-31
File Created2006-08-25

© 2024 OMB.report | Privacy Policy