U.S. NUCLEAR REGULATORY COMMISSION
DRAFT REGULATORY GUIDE DG-4027
Proposed Revision 2 to Regulatory Guide 4.2, Supplement 1
Issue Date: February 2023
Technical Lead: J. Davis

PREPARATION OF ENVIRONMENTAL REPORTS
FOR NUCLEAR POWER PLANT LICENSE
RENEWAL APPLICATIONS
A. INTRODUCTION
Purpose
This regulatory guide (RG) provides guidance to applicants for the format and content of
environmental reports (ERs) that are submitted as part of an application for the initial license
renewal (LR) or subsequent license renewal (SLR) of a nuclear power plant operating license.
Applicability
This RG 1 applies to applications for the renewal of a nuclear power plant operating license in
accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 54, “Requirements for
Renewal of Operating Licenses for Nuclear Power Plants” (Ref. 1), and the associated review under
10 CFR Part 51, “Environmental Protection Regulations for Domestic Licensing and Related Regulatory
Functions” (Ref. 2). This RG amends Supplement 1, Revision 1, to RG 4.2, “Preparation of
Environmental Reports for Nuclear Power Plant License Renewal Applications,” issued June 2013.
Applicable Regulations
•

The National Environmental Policy Act of 1969, as amended (NEPA; 42 United States Code
(U.S.C.) 4321 et seq.) (Ref. 3) requires that Federal agencies prepare detailed environmental

This RG is being issued in draft form to involve the public in the development of regulatory guidance in this area.
It has not received final staff review or approval and does not represent an NRC final staff position. Public
comments are being solicited on this DG and its associated regulatory analysis. Comments should be accompanied
by appropriate supporting data. Comments may be submitted through the Federal rulemaking Web site,
http://www.regulations.gov, by searching for draft regulatory guide DG-4027. Alternatively, comments may be
submitted to Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN:
Rulemakings and Adjudications Staff. Comments must be submitted by the date indicated in the Federal Register
notice.
1

Electronic copies of this DG, previous versions of DGs, and other recently issued guides are available through the
NRC’s public Web site under the Regulatory Guides document collection of the NRC Library at
https://nrcweb.nrc.gov/reading-rm/doc-collections/reg-guides/. The DG is also available through the NRC’s
Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html,
under Accession No. ML22165A072. The regulatory analysis is associated with a rulemaking and may be found in
ADAMS under Accession No. ML23010A074.

impact statements (EISs) on proposed major Federal actions significantly affecting the quality of
the human environment. A principal objective of NEPA is to require a Federal agency to
consider, in its decisionmaking process, the environmental impacts of each proposed major
Federal action and alternatives. Additional direction is provided in Executive Order 11514,
“Protection and Enhancement of Environmental Quality” (Ref. 4), as amended by Executive
Order 11991, “Environmental Impact Statements” (Ref. 5), and in the Council on Environmental
Quality’s (CEQ’s) regulations at 40 CFR Chapter V – Council on Environmental Quality - Parts
1500–1508 (Ref. 6). Regarding the CEQ regulations, as stated in 10 CFR 51.10, the U.S. Nuclear
Regulatory Commission (NRC) takes account of those regulations voluntarily, subject to certain
conditions.
•

10 CFR Part 51 provides requirements for the NRC’s preparation and processing of EIS and
related documents under Section 102(2)(C) of NEPA.

•

10 CFR Part 54 provides requirements for the issuance of renewed operating licenses and
renewed combined licenses for nuclear power plants licensed pursuant to Sections 103 or 104(b)
of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2133) (Ref. 7), and Title II of the
Energy Reorganization Act of 1974 (42 U.S.C. 5841-5853) (Ref. 8).
–

10 CFR Part 54.17(c) allows a license renewal application to be submitted within
20 years of license expiration, and NRC regulations at 10 CFR 54.31(b) specify that
the renewed license will be for a term of 20 years plus the length of time remaining
on the current license. As a result, renewed licenses may be for a term of 20 to
40 years.

Related Guidance
While the guidance provided in the related documents listed below may overlap with guidance in
this RG, the purposes of the documents are different. Some of the related documents offer guidance in the
development of reference sources that may be useful in the development of an ER, but, unlike this RG,
none are specifically intended to offer guidance directly pertinent to preparing the ER itself.
•

NUREG-1437, “Generic Environmental Impact Statement for License Renewal of Nuclear
Plants” (LR GEIS) (Ref. 9), provides the regulatory and technical basis for the findings on
environmental issues for initial LR or SLR of nuclear power plants in Table B-1 of NRC
regulations in Appendix B to Subpart A of 10 CFR Part 51. The LR GEIS presents the findings of
NRC’s systematic inquiry into the environmental impacts of continued nuclear power plant
operations and refurbishment activities associated with license renewal.

•

NUREG-1555, “Standard Review Plans for Environmental Reviews for Nuclear Power Plants,”
Supplement 1, “Operating License Renewal” (Ref. 10), provides the criteria used by the NRC
staff in conducting the environmental review and preparing the nuclear power plant-specific
supplemental environmental impact statement (SEIS).

Purpose of Regulatory Guides
The NRC issues RGs to describe methods that are acceptable to the staff for implementing
specific parts of the agency’s regulations, to explain techniques that the staff uses in evaluating specific
issues, and to describe information that the staff needs in its review of applications for permits and
licenses. RGs are not substitutes for NRC regulations and compliance with them is not required. Methods

Rev. 2 of RG 4.2, Supplement 1, Page 2

and solutions that differ from those set forth in RGs are acceptable if supported by a basis for the issuance
or continuance of a permit or license by the Commission.
Paperwork Reduction Act
This RG provides voluntary guidance for implementing the mandatory information collections in
10 CFR Parts 51 and 54 that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501
et. seq.). These information collections were approved by the Office of Management and Budget (OMB),
under control numbers 3150-0021 and 3150-0155. Send comments regarding this information collection
to the FOIA, Library, and Information Collections Branch (T6-A10M), U.S. Nuclear Regulatory
Commission, Washington, DC 20555 0001, or by e-mail to [email protected], and to the
Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0021 and 3150-0155),
Office of Management and Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of
information unless the document requesting or requiring the collection displays a currently valid OMB
control number.

Rev. 2 of RG 4.2, Supplement 1, Page 3

TABLE OF CONTENTS
A.

INTRODUCTION ............................................................................................................................ 1

TABLE OF CONTENTS ........................................................................................................................... 4
B.

DISCUSSION.................................................................................................................................... 8
B.1 Environmental Review Process ................................................................................................. 9
B.2 Consideration of International Standards ................................................................................ 11

C.

STAFF REGULATORY GUIDANCE ......................................................................................... 12
C.1 Environmental Reports—General Guidance ........................................................................... 12
Chapter 1 Purpose of and Need for Action ......................................................................... 15
Chapter 2 Proposed Action and Description of Alternatives .............................................. 16
2.1 The Proposed Action ................................................................................ 16
2.2 General Plant Information ........................................................................ 16
2.3 Refurbishment Activities .......................................................................... 18
2.4 Programs and Activities for Managing the Effects of Aging.................... 18
2.5 Employment ............................................................................................. 18
2.6 Alternatives to the Proposed Action ......................................................... 19
Chapter 3 Affected Environment ........................................................................................ 19
3.1 Land Use and Visual Resources ............................................................... 20
3.2 Meteorology and Air Quality ................................................................... 21
3.3 Noise......................................................................................................... 22
3.4 Geologic Environment ............................................................................. 22
3.5 Water Resources ....................................................................................... 23
3.6 Ecological Resources ................................................................................ 24
3.7 Historic and Cultural Resources ............................................................... 30
3.8 Socioeconomics ........................................................................................ 33
3.9 Human Health........................................................................................... 34
3.10 Environmental Justice............................................................................... 35
3.11 Waste Management .................................................................................. 35
3.12 Greenhouse Gas Emissions and Climate Change ..................................... 36
Chapter 4 Environmental Consequences of the Proposed Action and Mitigating
Actions ............................................................................................................... 36
4.1 Land Use and Visual Resources ............................................................... 37
4.2 Air Quality ................................................................................................ 37
4.3 Noise......................................................................................................... 37
4.4 Geology and Soils..................................................................................... 38
4.5 Water Resources ....................................................................................... 38
4.6 Ecological Resources ................................................................................ 43
4.7 Historic and Cultural Resources ............................................................... 61
4.8 Socioeconomics ........................................................................................ 63
4.9 Human Health........................................................................................... 63
4.10 Environmental Justice............................................................................... 65
4.11 Waste Management .................................................................................. 68

Rev. 2 of RG 4.2, Supplement 1, Page 4

Chapter 5
Chapter 6

Chapter 7

Chapter 8
Chapter 9

4.12 Greenhouse Gas Emissions and Climate Change ..................................... 68
4.13 Cumulative Effects .................................................................................... 69
4.14 Impacts Common to All Alternatives: Uranium Fuel Cycle..................... 70
4.15 Termination of Nuclear Power Plant Operations and Decommissioning . 71
Assessment of New and Significant Information ............................................... 71
Summary of License Renewal Impacts and Mitigating Actions ........................ 72
6.1 License Renewal Impacts ......................................................................... 72
6.2 Mitigation ................................................................................................. 72
6.3 Unavoidable Adverse Impacts .................................................................. 72
6.4 Irreversible or Irretrievable Resource Commitments ............................... 72
6.5 Short-Term Use Versus Long-Term Productivity of the Environment..... 72
Alternatives to the Proposed Action ................................................................... 72
7.1 Alternative Energy Sources ...................................................................... 74
7.2 Alternatives for Reducing Adverse Impacts ............................................. 75
7.3 No-Action Alternative .............................................................................. 75
Comparison of the Environmental Impact of License Renewal with the
Alternatives ........................................................................................................ 76
Status of Compliance.......................................................................................... 76

D.

IMPLEMENTATION .................................................................................................................... 77

E.

REFERENCES ............................................................................................................................... 78

Rev. 2 of RG 4.2, Supplement 1, Page 5

ABBREVIATIONS/ACRONYMS
APE

area of potential effects

BTA

best available technology

CEQ
CFR
CWA

Council on Environmental Quality
Code of Federal Regulations
Clean Water Act of 1972

EFH
EIS
EMF
EPA
ER
ESA

essential fish habitat
environmental impact statement
electromagnetic field
U.S. Environmental Protection Agency
environmental report
Endangered Species Act of 1973

GEIS
GHG
gpm

generic environmental impact statement
greenhouse gas
gallons per minute

HAPC

habitat of particular concern

IAEA
IPaC

International Atomic Energy Agency
Information Planning and Consultation

LR
L/min
LR GEIS

license renewal
liters per minute
Generic Environmental Impact Statement for License Renewal of Nuclear Plants

MSA
MTU
MWd

Magnuson-Stevens Fishery Conservation and Management Act of 1996
metric ton of uranium
megawatt-days

NEI
NEPA
NESC
NHPA
NMSA
NPDES
NRC

Nuclear Energy Institute
National Environmental Policy Act of 1969
National Electric Safety Code
National Historic Preservation Act of 1966
National Marine Sanctuaries Act
National Pollutant Discharge Elimination System
U.S. Nuclear Regulatory Commission

Rev. 2 of RG 4.2, Supplement 1, Page 6

NRHP

National Register of Historic Places

RG
ROW

regulatory guide
right-of-way

SAMA
SEIS
SHPO
SLR

severe accident mitigation alternative
supplemental environmental impact statement
State Historic Preservation Officer
subsequent license renewal

THPO

Tribal Historic Preservation Officer

U.S.C.

United States Code

Rev. 2 of RG 4.2, Supplement 1, Page 7

B. DISCUSSION
Reason for Revision
RG 4.2, Supplement 1, Revision 2 updates guidance to align with NRC regulations, changes in
environmental statutes and regulations, and Executive Orders since the last revision of the RG. Examples
of changes include, but are not limited to, the assessment of continued operations and refurbishment
impacts, greenhouse gas (GHG) and climate change, environmental justice, alternatives, cumulative
effects, and to fully account for SLR.
Background
Use of this RG will help to ensure the completeness of the information provided in the ER, assist
the NRC staff and others in locating important information, and facilitate the environmental review
process for license renewals. However, the NRC does not require conformance with this guidance.
This RG also explains how the NRC complies with its environmental protection regulations in
10 CFR Part 51, “Environmental Protection Regulations for Domestic Licensing and Related Regulatory
Functions,” for the renewal of nuclear power plant operating licenses. NRC regulations at 10 CFR Part 51
implement Section 102(2) of NEPA. The NRC originally published the license renewal provisions of
10 CFR Part 51 in the Federal Register on June 5, 1996 (61 FR 28467) (Ref. 11). The NRC’s intention in
developing the 1996 rule was to improve the regulatory efficiency of the environmental review process
for the renewal of nuclear power plant operating licenses. Analyses conducted for and reported in
NUREG-1437, “Generic Environmental Impact Statement for License Renewal of Nuclear Plants,” issued
May 1996, support the 1996 rule.
On December 18, 1996 (61 FR 66537) (Ref. 12), the NRC amended the rule to incorporate minor
clarifying and conforming changes and to add omitted language. The NRC amended the rule again on
September 3, 1999 (64 FR 48496) (Ref. 13), to address the environmental effects of transporting uranium
fuel and reactor waste to and from a single nuclear power plant. Analyses conducted for and reported in
NUREG-1437, Volume 1, Addendum 1, “Generic Environmental Impact Statement for License Renewal
of Nuclear Plants: Main Report, Section 6.3—Transportation, Table 9.1 Summary of Findings on NEPA
Issues for License Renewal of Nuclear Power Plants, Final Report,” issued August 1999, support this
amendment. This amendment also addressed local traffic-related transportation impacts from the
continued operation of a nuclear power plant during the license renewal term.
The NRC amended the rule again on June 20, 2013 (78 FR 37282) (Ref. 14), to redefine the
number and scope of the environmental issues that must be addressed during license renewal
environmental reviews. This recent revision also incorporates lessons learned and knowledge gained from
initial LR and SLR environmental reviews conducted in the period leading up to and following
completion of the prior update in 2013 and fully considers one term of SLR. Analyses conducted for and
reported in NUREG-1437, Revision 2, “Generic Environmental Impact Statement for License Renewal of
Nuclear Plants” (LR GEIS), issued in 2023, support this rule amendment.
The LR GEIS evaluated 80 environmental issues and determined that 59 of these issues are
adequately addressed for all applicable nuclear power plants. The LR GEIS identifies these as Category 1
issues. The NRC will not require additional analysis in nuclear power plant-specific (hereafter called
plant-specific) environmental reviews of Category 1 issues unless new and significant information related
to the conclusions in the LR GEIS needs to be considered. Of the remaining 21 issues, 20 are identified as
Category 2 issues, which require plant-specific environmental assessments. One environmental issue

Rev. 2 of RG 4.2, Supplement 1, Page 8

(“electromagnetic fields [EMFs]”) is not categorized. This issue remains uncategorized because there is
no scientific consensus on the potential effects from chronic exposure to EMFs.
Applicants for a permit, license, or other authorization to site, construct, and/or operate a new
nuclear power plant may use RG 4.2, “Preparation of Environmental Reports for Nuclear Power Stations”
(Ref. 15), for developing ERs submitted as part of an application in accordance with 10 CFR Part 50,
“Domestic Licensing of Production and Utilization Facilities,” and 10 CFR Part 52, “Licenses,
Certifications, and Approvals for Nuclear Power Plants” (Ref. 16).
B.1

Environmental Review Process

After receiving an application for initial LR or SLR that includes the ER, the NRC staff conducts
an acceptance review to determine whether the information in the ER is sufficiently complete to begin the
environmental (NEPA) review process. After docketing the application, the NRC staff begins the
environmental review and starts preparing the plant-specific SEIS to the LR GEIS. Draft NUREG-1555,
“Standard Review Plans for Environmental Reviews for Nuclear Power Plants,” Supplement 1,
Revision 2, “Operating License Renewal,” issued in 2023, guides the NRC staff in conducting the
environmental review and preparing the SEIS. As part of the review, the NRC staff assesses the
environmental impacts of the proposed action (the initial or subsequent renewal of the nuclear power
plant’s operating license), no action (not renewing the operating license), and energy replacement
alternatives. The SEIS presents conclusions and recommendations concerning the environmental impacts
of renewing the nuclear power plant’s operating license. NRC decisionmakers consider these
recommendations, together with the findings from the NRC’s safety review (under 10 CFR Part 54),
before deciding to either issue or deny the issuance of the initial LR or SLR operating license.
The NRC’s environmental (NEPA) review process consists of the following actions required by
10 CFR Part 51:
•

Publish a notice of intent to conduct an initial LR or SLR environmental review and to prepare a
plant-specific SEIS to the LR GEIS in the Federal Register (see 10 CFR 51.27, “Notice of
Intent”; 10 CFR 51.95(c), “Postconstruction Environmental Impact Statements—Operating
License Renewal Stage”; and 10 CFR 51.116, “Notice of Intent”). Send copies of the notice to the
appropriate Federal, State, and local agencies and Indian Tribes; 2 public interest groups; and any
other persons (e.g., representatives of environmental justice communities 3) expressing interest in
the initial LR or SLR environmental review. The notice describes the proposed action, explains
the NRC’s scoping process, provides information about public meeting locations, where copies of
the ER are available for public examination, and invites members of the public to participate in
the scoping process.

•

Conduct scoping (see 10 CFR 51.28, “Scoping—Participants”; 10 CFR 51.29, “Scoping—
Environmental Impact Statement and Supplement to Environmental Impact Statement”; 10 CFR
51.71, “Draft Environmental Impact Statement—Contents”; 10 CFR 51.95(c)(1); and 40 CFR
1506.6(b)(3), “Public Involvement”). The purpose of scoping is to identify environmental issues
and invite State and local agency officials; Indian Tribes; representatives of environmental justice
communities; environmental interest groups; and members of the public to participate in the

The term “Indian Tribes” refers to Federally recognized Tribes as acknowledged by the Secretary of the Interior
pursuant to the Federally Recognized Indian Tribe List Act of 1994 (25 U.S.C. § 479a) (Ref. 17).
3
Environmental justice communities can also include State-recognized Tribes, those that self-identify as Indian
Tribes, and tribal members. Tribal members can be part of an environmental justice community that has different
interests and concerns than a Tribal government.
2

Rev. 2 of RG 4.2, Supplement 1, Page 9

scoping process. Scoping provides an opportunity for any member of the public to identify
environmental issues and concerns they believe are significant that may not have been adequately
addressed in the ER. Environmental issues may be introduced in oral statements made at the
scoping meeting or in written comments sent directly to the NRC or via www.regulations.gov.
During scoping, the NRC staff can visit the nuclear power plant and, if requested, meet with
local, regional, and State agencies and Indian tribes; and representatives of environmental justice
communities and environmental interest groups. Depending on issues and concerns raised during
scoping, the NRC staff may request additional information from the applicant.
•

Prepare a plant-specific draft SEIS to the LR GEIS (see 10 CFR 51.70, “Draft Environmental
Impact Statement—General”; 10 CFR 51.71; and 10 CFR 51.95(c)). In developing the draft
SEIS, the NRC staff will evaluate (verify and validate) information provided by the applicant and
will seek and collect information from independent sources.

•

Distribute the draft SEIS for public comment (see 10 CFR 51.73, “Request for Comments on
Draft Environmental Impact Statement,” and 10 CFR 51.74, “Distribution of Draft Environmental
Impact Statement and Supplement to Draft Environmental Impact Statement; News Releases”).
The U.S. Environmental Protection Agency (EPA) and the NRC will publish separate notices of
availability in the Federal Register. Copies of the draft SEIS will be distributed to appropriate
Federal, State, and local agencies and Indian Tribes; environmental justice communities;
environmental interest groups, organizations, and individuals who expressed interest and
participated in the environmental review; and any other individuals who request a copy.

•

Prepare the final SEIS to the LR GEIS (see 10 CFR 51.90, “Final Environmental Impact
Statement— General”; 10 CFR 51.91, “Final Environmental Impact Statement—Contents”; and
10 CFR 51.95(c)). In developing the final SEIS, the NRC staff will respond to all comments and
revise the SEIS, if necessary. After addressing public comments, the NRC staff will determine
whether the adverse environmental impacts of license renewal are so great that preserving the
option of license renewal for energy-planning decisionmakers would be unreasonable. The NRC
staff will then submit the final SEIS to the EPA, and both agencies will publish notices of
availability in the Federal Register (see 10 CFR 51.93, “Distribution of Final Environmental
Impact Statement and Supplement to Final Environmental Impact Statement; News Releases,”
and 10 CFR 51.118, “Final Environmental Impact Statement—Notice of Availability”). Copies of
the final SEIS will be distributed to Federal, State, and local agencies and Indian Tribe
environmental justice communities; environmental interest groups, organizations, and individuals
who expressed interest and participated in the environmental review; and any other individuals
who request a copy.

•

The Commission may hold a hearing if it determines that it is in the public interest or if a request
for hearing and petition to intervene are granted. In accordance with 10 CFR 2.105(a)(10),
“Notice of Proposed Action” (Ref. 18), the NRC will issue a notice of opportunity for hearing as
soon as practicable. Any person whose interest may be affected by the initial LR or SLR action
may request a hearing. (See also 10 CFR 51.104, “NRC Proceeding Using Public Hearings;
Consideration of Environmental Impact Statement.”)

•

Prepare a record of decision (see 10 CFR 51.103, “Record of Decision—General”). The record of
decision will summarize the impacts of initial LR or SLR and the energy replacement alternatives
considered in the SEIS, the measures taken to minimize and/or reduce any adverse environmental
effects, and any license conditions adopted in connection with mitigation measures. In making a
final decision on initial LR or SLR, the NRC will determine whether the adverse environmental
impacts of license renewal are so great that preserving the option of license renewal for energyRev. 2 of RG 4.2, Supplement 1, Page 10

planning decisionmakers would be unreasonable. The NRC will publish the Commission’s final
decision on whether to renew the nuclear plant operating license in the Federal Register.
B.2

Consideration of International Standards

The International Atomic Energy Agency (IAEA) works with member states and other partners to
promote the safe, secure, and peaceful use of nuclear technologies. The IAEA develops Safety
Requirements and Safety Guides for protecting people and the environment from harmful effects of
ionizing radiation. This system of safety fundamentals, safety requirements, safety guides, and other
relevant reports, reflects an international perspective on what constitutes a high level of safety. To inform
its development of this RG, pursuant to the Commission’s International Policy Statement (Ref. 19) and
Management Directive and Handbook 6.6, “Regulatory Guides” (Ref. 20) which states that consensus
standards, industry guidance documents, and international standards are endorsed in RGs, as appropriate.
The staff did not identify any IAEA Requirements or Guides with information applicable to this RG.

Rev. 2 of RG 4.2, Supplement 1, Page 11

C. STAFF REGULATORY GUIDANCE
C.1

Environmental Reports—General Guidance

The applicant should provide sufficient information to support the environmental impact
assessments in the ER and the basis for each finding (conclusion). Though other documents (e.g.,
previous ER(s) or safety analysis reports) may be incorporated by reference, the applicant should
summarize the information from these documents used in impact assessments. The applicant must also
ensure the ER provides all the relevant information and analyses called for in NRC regulations, 10 CFR
51.45, “Environmental Report,” and 10 CFR 51.53(c), “Postconstruction Environmental Reports—
Operating License Renewal Stage.” The ER should describe in detail the affected environment around the
nuclear power plant, modifications directly affecting the environment or any plant effluents, and any
planned refurbishment activities.
Treatment of Category 1 Issues
According to 10 CFR 51.53(c)(3)(i), “The environmental report for the operating license renewal
stage is not required to contain analyses of the environmental impacts of the license renewal issues
identified as Category 1 issues in appendix B to subpart A of this part.” However, the ER should describe
the affected environment and any environmental resources pertinent to those Category 1 issues that apply
to the nuclear power plant and identify Category 1 issues that do not apply. The ER should also discuss
any new and significant information related to Category 1 environmental issues (see “New and
Significant Information” paragraph below). The applicant can incorporate the findings in the LR GEIS
into the ER for applicable Category 1 issues.
Treatment of Category 2 Issues
According to 10 CFR 51.53(c)(3)(ii), “The environmental report must contain analyses of the
environmental impacts of the proposed action, including the impacts of refurbishment activities, if any,
associated with license renewal and the impacts of operation during the renewal term, for those issues
identified as Category 2 issues in appendix B to subpart A of this part.” This RG describes acceptable
methods for fulfilling this requirement.
New and Significant Information
According to 10 CFR 51.53(c)(3)(iv), “The environmental report must contain any new and
significant information regarding the environmental impacts of license renewal of which the applicant is
aware.” New and significant information is (1) information that identifies a significant environmental
issue that was not considered or addressed in the LR GEIS and, consequently, not codified in Table B-1,
“Summary of Findings on Environmental Issues for Initial and One Term of Subsequent License Renewal
of Nuclear Plants,” in Appendix B, “Environmental Effect of Renewing the Operating License of a
Nuclear Power Plant,” to Subpart A, “National Environmental Policy Act—Regulations Implementing
Section 102(2),” of 10 CFR Part 51, or (2) information not considered in the assessment of impacts
evaluated in the LR GEIS leading to a seriously different picture of the environmental consequences of
the action than previously considered, such as an environmental impact finding different from that
codified in Table B-1. 4 Further, a significant environmental issue includes, but is not limited to, any new
activity or aspect associated with the nuclear power plant that can act upon the affected environment in a
manner or an intensity not previously recognized or quantified. An applicant should state in the ER
For example, Union Electric Company d/b/a Ameren Missouri, (Callaway Plant, Unit 2) CLI-11-5, 74 NRC 141,
167-68 (2011). (Ref. 21)
4

Rev. 1 of RG 4.2, Supplement 1, Page 12

whether it is aware of any new and significant information and describe any actions taken to identify new
information and evaluate its significance. This information will assist the NRC in fulfilling its
responsibilities under 10 CFR 51.70(b), which states, in part, “The NRC staff will independently evaluate
and be responsible for the reliability of all information used in the draft environmental impact statement.”
Other interested parties, as well as the NRC, may also identify new and significant information during
scoping and public comment periods. Chapter 5 of this RG provides guidance on actions that an applicant
may take to identify and evaluate new and significant information.
Impact Findings
For Category 2 issues and for new and significant information, applicants should assess the
environmental impact in proportion to their significance as prescribed in the CEQ’s terminology
including revisions in Part 1501—NEPA and Agency Planning (40 CFR 1501). In considering whether
the effects of the proposed action are significant, license renewal applicants should consider the
potentially affected environment and degree of the effects of the proposed action (license renewal). The
potentially affected environment consists of the affected area and its resources, such as listed species and
designated critical habitat under the Endangered Species Act of 1973 (ESA) (16 U.S.C. 1531 et seq.)
(Ref. 22). For nuclear power plant-specific issues, significance would depend on the effects in the local
area, including (1) short- and long-term effects; (2) beneficial and adverse effects; (3) effects on public
health and safety; and (4) effects that would violate Federal, State, Tribal, or local law protecting the
environment (40 CFR 1501.3(b)).
In assessing the significance of environmental impacts, the applicant should conform to the
following terminology and definitions used by the NRC in the LR GEIS and codified in footnotes to
Table B-1 in Appendix B to Subpart A of 10 CFR Part 51:
•

SMALL – For the issue, environmental effects are not detectable or are so minor that they will
neither destabilize nor noticeably alter any important attribute of the resource. For the purposes of
assessing radiological impacts, the Commission has concluded that those impacts that do not
exceed permissible levels in the Commission’s regulations are small.

•

MODERATE – For the issue, environmental effects are sufficient to alter noticeably, but not to
destabilize, important attributes of the resource.

•

LARGE – For the issue, environmental effects are clearly noticeable and are sufficient to
destabilize important attributes of the resource.

In assessing environmental impacts on federally protected ecological resources and historic and
cultural resources that require interagency consultation with Federal agencies or Indian Tribes, the
applicant should report findings in accordance with the terminology used in the relevant statutes and their
implementing regulations.
For federally listed and proposed species protected under the ESA, the applicant should report
findings as:
•

“may affect and is likely to adversely affect”

•

“may affect but is not likely to adversely affect”

•

“no effect”

Rev. 2 of RG 4.2, Supplement 1, Page 13

For federally designated and proposed critical habitat protected under the ESA, the applicant
should report findings as:
•

“is likely to destroy or adversely modify”

•

“is not likely to destroy or adversely modify”

•

“no effect”

For essential fish habitat (EFH) protected under the Magnuson-Stevens Fishery Conservation and
Management Act of 1996 (MSA) (16 U.S.C. 1801 et seq.) (Ref. 23), the applicant should report findings
as:
•

“substantial adverse effects”

•

“more than minimal but less than substantial adverse effects”

•

“no adverse effects”

For sanctuary resources protected under the National Marine Sanctuaries Act (NMSA) (16 U.S.C.
§ 1431 et seq.) (Ref. 24), the applicant should report findings as:
•

“may affect and is likely to destroy, cause the loss of, or injure”

•

“may affect but is not likely to destroy, cause the loss of, or injure”

•

“no effect”

These findings are further explained in Section 4.6.4 and summarized in Table 4-1, Table 4-2,
and Table 4-3 of this RG. Notably, individual findings should be made for each federally protected
ecological resource. Thus, the number of findings for a given license renewal will depend on the number
of federally protected species and habitats present in the affected area.
For impacts to historic properties assessed under Section 106 of the National Historic
Preservation Act of 1966 (NHPA) (54 U.S.C. 300101 et seq.) (Ref. 25), the assessment should lead to one
of three conclusions for NHPA (see 36 CFR 800.4) (Ref. 26):
•

No historic properties present, the undertaking will have no effect to historic properties

•

Historic properties present, the undertaking will have no adverse effect upon them

•

Historic properties present, the undertaking will have an adverse effect upon one or more historic
properties (see 36 CFR 800.5)

Mitigation of Adverse Effects
In 10 CFR 51.45(c), the NRC requires the consideration of alternatives available for reducing or
avoiding any adverse effects. In addition, applicants should identify any ongoing mitigation and discuss
the potential need for additional mitigation. Mitigation alternatives should be considered in proportion to
the significance of the impact. In 40 CFR 1508.1(s), “Mitigation.” CEQ identifies five types of mitigative
actions:
Rev. 2 of RG 4.2, Supplement 1, Page 14

1. Avoiding the impact altogether by not taking a certain action or parts of an action.
2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation.
3. Rectifying the impact by repairing, rehabilitating, or restoring the affected environment.
4. Reducing or eliminating the impact over time by preservation and maintenance operations during the
life of the action.
5. Compensating for the impact by replacing or providing substitute resources or environments.
The applicant should identify all relevant, reasonable mitigation measures that could reduce or
avoid adverse effects, even if they are outside the jurisdiction of the NRC.
Direct, Indirect, and Cumulative Effects
Environmental impacts, or effects, include direct, indirect, and cumulative effects.
The environmental impact assessment should consider and discuss each type of these effects in
relation to the impact attributed to license renewal (see “Impact Findings” above). The CEQ regulations at
40 CFR Part 1508.1, “Definitions,” define three types of effects.
As defined in 40 CFR 1508.1(g), “Effects or impacts” means changes to the human environment
from the proposed action or alternatives that are reasonably foreseeable and include the following:
•

Direct effects, which are caused by the action and occur at the same time and place.

•

Indirect effects, which are caused by the action and are later in time or farther removed in
distance, but are still reasonably foreseeable. Indirect effects may include growth-inducing effects
and other effects related to induced changes in the pattern of land use, population density, or
growth rate, and related effects on air and water and other natural systems, including ecosystems.

•

Cumulative effects, which are effects on the environment that result from the incremental effects
of the action when added to the effects of other past, present, and reasonably foreseeable actions
regardless of what agency (Federal or non-Federal) or person undertakes such other actions.
Cumulative effects can result from individually minor but collectively significant actions taking
place over a period of time.

Chapter 1

Purpose of and Need for Action

This chapter of the ER should briefly describe the purpose of and need for the proposed action.
The applicant’s ER should include the following statement:
The purpose and need for the proposed action (license renewal) is to provide an option
that allows for baseload power generation capability beyond the term of the current
nuclear power plant operating license to meet future system generating needs. Such
needs may be determined by other energy-planning decisionmakers, such as State,
utility, and, where authorized, Federal agencies (other than the NRC). Unless there are
findings in the safety review required by the Atomic Energy Act or the NEPA
environmental review that would lead the NRC to deny a license renewal application,
Rev. 2 of RG 4.2, Supplement 1, Page 15

the NRC does not have a role in the energy-planning decisions of whether a particular
nuclear power plant should continue to operate.
Chapter 2

Proposed Action and Description of Alternatives

This chapter of the ER should briefly describe the proposed action, the nuclear power plant, and
energy replacement alternatives. The applicant should also describe any proposed refurbishment
activities, programs, and activities for managing the effects of aging during the license renewal term
(initial LR or SLR).
2.1

The Proposed Action

The proposed action is the renewal of the nuclear power plant operating license, leading to
continued reactor operations and maintenance activities during the renewal term (initial LR or SLR).
These activities may include refurbishment for extended nuclear plant operation and changes to
surveillance, monitoring, inspections, testing, trending, and recordkeeping (i.e., SMITTR). The applicant
may undertake refurbishment and surveillance, monitoring, inspections, testing, trending, and
recordkeeping activities because of findings from the 10 CFR Part 54 aging management review or for
other reasons, such as opportunities for improved economic operation and maintenance during the license
renewal term. This section of the ER should describe only those license renewal activities that can affect
the environment. The level of detail should be sufficient to support the impact assessments in the ER. For
reference, Chapter 2 of the LR GEIS describes reactor operations and refurbishment activities associated
with license renewal.
As described in 10 CFR 51.53(c)(2), the ER must contain the following:
[A] description of the proposed action, including the applicant’s plans to modify the
facility or its administrative control procedures as described in accordance with § 54.21
of this chapter. This report must describe in detail the affected environment around the
plant, the modifications directly affecting the environment or any plant effluents, and
any planned refurbishment activities. In addition, the applicant shall discuss in this
report the environmental impacts of alternatives and any other matters discussed in
§ 51.45.
2.2

General Plant Information

The applicant should briefly describe in the ER the major features of the nuclear power plant and
the reactor operation, inspection, maintenance, and refueling activities and practices that would occur
during the license renewal term (initial LR or SLR). Information presented should describe the following
systems.
Reactor and Containment Systems
This section of the ER should briefly describe the nuclear power plant, including the reactor,
reactor core power, fuel, percent uranium-235 enrichment, irradiation level, refueling cycle, containment
system, design net electrical output, and the vendor of the nuclear steam supply system.
Cooling and Auxiliary Water Systems
This section of the ER should describe the cooling and auxiliary water systems in the order that
water flows through them, including approach, intake structure, trash racks, screens (including mesh

Rev. 2 of RG 4.2, Supplement 1, Page 16

sizes), screen wash, and fish return or collection systems. It should also provide appropriate figures or
maps to illustrate the system pathway. This description should include the rates of average, seasonal, and
maximum water withdrawal, estimated consumptive water use, the flow rates or volume of the water
body from which cooling water is withdrawn, the location of water withdrawal, and intake velocity at the
screens for the last 5 years. The applicant should describe in detail any structural or operational measures,
such as the schedule of traveling screen operation or planned outages, used to reduce impingement of fish
and shellfish. This description should include a typical water balance or budget showing rates of water
withdrawal, losses to evaporative cooling (e.g., for cooling towers), blowdown, contributions from other
comingled effluents, and other such inputs or outputs. The applicant should also describe typical
temperature changes as water passes through the system, as well as temperatures at the outfall, the size of
the plume and mixing zone, and National Pollutant Discharge Elimination System (NPDES) or other
permit conditions related to temperature. The ER should include copies of such permits and supporting
documentation in an appendix. This section should also describe chemical additions or other measures
used to clean or maintain condensers and other components. The sections of the ER concerning surface
water, impingement mortality and entrainment, and effects of thermal effluents on aquatic organisms
should refer to this section when appropriate to avoid unnecessary repetition. For plants with oncethrough cooling systems and cooling ponds, this section should provide sufficient detail about the cooling
system to support the analysis of the impacts of impingement mortality, entrainment, and thermal
effluents on aquatic organisms.
Radioactive Waste Management
Each nuclear power plant has a radioactive waste system to collect, treat, and dispose of
radioactive and potentially radioactive wastes that are byproducts of reactor operations. Radioactive
wastes are classified as either liquid, gaseous, or solid.
The applicant should provide a brief plant-specific description of the major features of the liquid,
gaseous, and solid radioactive waste management systems. The information should include a description
of the systems and types of waste treatment used (e.g., filtration, demineralizers, dewatering, and resin
filtration for liquid wastes), onsite storage facilities, and any offsite waste treatment and transportation
and disposal of the waste.
Nonradioactive Waste Management
Each nuclear power plant has a nonradioactive waste system to collect, treat, and dispose of
nonradioactive wastes that are byproducts of plant operations. The EPA, in accordance with the Resource
Conservation and Recovery Act (42 U.S.C. 82) (Ref. 27), classifies certain nonradioactive hazardous
wastes as hazardous based on characteristics including ignitability, corrosivity, reactivity, and toxicity.
State regulators may add other wastes to the EPA list of hazardous wastes.
The applicant should provide a brief plant-specific description of the major features of the
nonradioactive waste storage and disposal programs. The information should include details on the types
of waste, handling, storage, and disposal. This section of the ER should also provide information on State
permits or any other special permits for the generation, handling, storage, and disposal of nonradiological
waste. This section should also describe pollution prevention and waste minimization programs being
used at the plant site.
Power Transmission Systems
The applicant should list and describe in-scope transmission lines, including the length or
distance of lines; the width of right-of-ways (ROWs); ROW maintenance plans, procedures, or protocols;

Rev. 2 of RG 4.2, Supplement 1, Page 17

and the pesticides and herbicides used in ROWs, including information on how and when they are
released. The applicant should also describe the protocol for applying chemicals near streams and
wetlands and any procedures in place to protect historic properties and cultural resources. In addition, the
applicant should provide a map of all in-scope transmission lines and ROWs. Only those transmission
lines that connect the plant to the switchyard where electricity is fed into the regional power distribution
system (encompassing those lines that connect the plant to the first substation of the regional electric
power grid) and power lines that feed the plant from the grid during outages are considered within the
scope of the environmental review.
2.3

Refurbishment Activities

Describe any refurbishment activities performed in support of or otherwise associated with, or
necessary for, license renewal (initial LR or SLR). The applicant should identify major facility
modifications at the nuclear power plant, including structures and components (e.g., steam generators,
vessel heads) that will be replaced or modified. The section should describe where equipment, material,
and components will be stored on the plant site before installation, as well as their removal and ultimate
disposal. The location and nature of environmental impacts if refurbishment activities will directly or
indirectly affect the environment should also be discussed.
The applicant should describe any activities required to support the transport and delivery of
equipment, material, and components, such as dredging or bridge and road modifications. Project plans
and an implementation schedule should also be discussed, along with a brief explanation of how
refurbishment activities will be integrated with refueling and maintenance outages and/or other activities.
It should also list any Federal, State, and local permits needed for the refurbishment and their status.
The environmental effects of refurbishment activities described in this section should be
discussed in Chapter 4 of the ER.
2.4

Programs and Activities for Managing the Effects of Aging

Applicants should characterize any changes to power plant operations, inspections, maintenance
activities, systems, and administrative control procedures during the renewal term designed to manage the
effects of aging (as required by 10 CFR Part 54) that could impact the environment. Environmental
impacts different from those described in the final environmental statement for the current operating
license should be described in detail.
2.5

Employment

The applicant should provide the most current estimate of total annual permanent, full-time,
onsite employment (i.e., the total estimated number of full-time employees) and their place of residence
by county, city, or town. The average number of refueling outage workers, duration of refueling outages
(number of weeks), and their frequency (number of months) should also be provided.
The ER should also present the estimated number of workers required to support any
refurbishment activities. The amount of time (days or months) as well as an estimate of peak employment
should be provided.
Applicants should also note in the ER any anticipated changes in the size of the onsite workforce
arising from changes in surveillance, monitoring, inspections, testing, trending, and recordkeeping
activities during the license renewal term. The applicant should also estimate changes in indirect
employment resulting from changes in the onsite workforce. Employment multipliers used and their

Rev. 2 of RG 4.2, Supplement 1, Page 18

source, along with any additional information needed for the NRC to verify the appropriateness of the
multipliers, should be provided. Using an estimate of average household size for the region, the applicant
should estimate the change in total population associated with license renewal.
2.6

Alternatives to the Proposed Action

In addition to considering the environmental effects, or impacts, of the proposed action (license
renewal), the NRC must also consider the environmental effects of alternatives to replace or offset the
generating capacity of the nuclear power plant or to mitigate potential adverse impacts. The NRC
considers the environmental effects of license renewal according to 10 CFR 51.103(a)(5), which states the
following:
In making a final decision on a license renewal action pursuant to Part 54 of this
chapter, the Commission shall determine whether or not the adverse environmental
impacts of license renewal are so great that preserving the option of license renewal
for energy planning decisionmakers would be unreasonable.
This section should briefly describe the process the applicant used to identify replacement energy
alternatives. Guidance on the treatment of reasonable alternatives to the proposed action are discussed in
greater detail in Section 7.1 of this RG. Applicants should briefly describe all the alternative energy
sources considered and indicate which replacement energy alternatives are evaluated in detail in the ER.
This section should also include a brief description of alternatives considered that would reduce
or avoid adverse effects (e.g., conversion of the cooling system from once-through to closed loop or
construction and operation of cooling towers to reduce adverse impacts to aquatic resources). Guidance in
Section 7.2 of this RG describes the treatment of these alternatives in greater detail.
Chapter 3

Affected Environment

Information that NRC reviewers need to describe the plant’s environmental setting is discussed in
this chapter. Applicants should include the following information about the affected environment to assist
the NRC staff in its review of potential environmental impacts during the license renewal term (initial LR
or SLR):
•

Describe the location of the nuclear power plant, including the State, county, town, township,
service districts, and parish boundaries, as appropriate. Provide maps showing the boundaries of
political jurisdictions.

•

Include a map, or maps, of the nuclear power plant showing site boundaries; the exclusion area;
site structures and facilities; major land uses (with land use classification consistent with the
U.S. Geological Survey categories given in “USGS NLCD Land Cover Class Legend and
Description,” updated in 2019 [Ref. 28]); the construction zone for refurbishment, if any; location
of any other planned buildings and structures (both temporary and permanent); and transportation
routes accessing and adjacent to the nuclear power plant site.

•

Provide a map of the 6-mile (10-kilometer) radius of the nuclear power plant site and a 50-mile
(80-kilometer) radius, showing county and local municipality boundaries, place names, residential
areas, airports, industrial and commercial facilities, roads and highways, railroads, Indian
reservation and trust lands, military reservations, and military facilities. Depict features on both
the vicinity and regional map(s) as practicable, given varying map scales.

Rev. 2 of RG 4.2, Supplement 1, Page 19

3.1

•

Identify and describe known and reasonably foreseeable Federal and non-Federal projects and
other actions in the vicinity of the nuclear power plant that may contribute to the cumulative
environmental effects of license renewal.

•

Identify all Federal facilities, including national parks, national forests, national wildlife areas,
military facilities, and military reservations; Indian reservation and trust lands; and State parks,
recreational areas, and conservation lands. Include distances, as well as any nonattainment and/or
maintenance areas defined under the Clean Air Act, as amended, within 50 miles (80 kilometers)
of the plant site.

•

Provide the projected population within a 50-mile (80-kilometer) radius of the nuclear power
plant.
Land Use and Visual Resources

Land Use
The ER should provide zoning information (e.g., land is zoned for industrial and/or commercial
use), including acreage and percentage of land use and land cover by category within the nuclear power
plant site boundary and/or property. Onsite land use or land cover can be divided into four basic
categories: (1) developable unused open portions of the site, including fields and forest uplands;
(2) nondevelopable wetlands and open waterbodies (i.e., marshes, bogs, swamps, streams, ponds,
estuaries, and rivers); (3) developed portions of the site, including facilities, structures, parking,
landscaped areas, leased lands, and visitor and recreation areas; and (4) the total amount of land disturbed
during the construction and operation of the nuclear power plant. The applicant should provide a map of
the 6-mile (10-kilometer) radius of the nuclear power plant showing major land uses and land cover with
land use classifications consistent with the U.S. Geological Survey categories. The applicant should also
provide information about local county comprehensive land use, zoning, and development plans
describing anticipated population and housing growth, control measures, and changing land use patterns.
Section 307(c)(3)(A) of the Coastal Zone Management Act of 1972 (16 U.S.C. 1456 et seq.)
(Ref. 29) requires applicants for Federal licenses or permits to certify that the proposed activity in a
coastal zone or coastal watershed boundary, as defined by each State participating in the National Coastal
Zone Management Program, is consistent with the enforceable policies of that State’s Coastal Zone
Management Program. States define their coastal zone boundaries by using a variety of parameters, such
as the entire State, county or county-equivalent boundaries, political features (e.g., town boundaries), and
geographic features (e.g., adjacency to tidal waters). Applicants must coordinate with the State agency
that manages the State Coastal Zone Management Program to obtain a determination that the proposed
activity would be consistent with their program. A Federal agency cannot issue a license or permit until
the State concurs.
For nuclear power plants located in a coastal zone or coastal watershed, as defined by each State
participating in the National Coastal Zone Management Program, applicants must submit a consistency
certification to the responsible State agency that the proposed license renewal action is consistent with the
State Coastal Zone Management Program. Applicants must receive a determination from the State agency
that manages the State Coastal Zone Management Program that the proposed license renewal action
would be consistent with the State program. Documentation of the State’s coastal zone consistency
determination for license renewal should be provided in the ER.

Rev. 2 of RG 4.2, Supplement 1, Page 20

Visual Resources
The ER should describe the nuclear power plant’s visual setting, including the identity and height
of the tallest visible structures and the direction and distances from which these structures are visible, as
well as the visibility of lighting and vapor plumes. The applicant should also describe the visual impacts
(if they occur) of in-scope transmission lines.
3.2

Meteorology and Air Quality

In this section of the ER, the applicant should provide information that includes a description of
the local and regional meteorology and climatology. The applicant should also describe the onsite
meteorological monitoring program and data monitoring system, and provide onsite meteorological data
measurements (ambient temperature, precipitation, wind speed, and wind direction) for the last 5 years.
The applicant should provide a summary of current local air quality with respect to criteria pollutants
established under the National Primary and Secondary Ambient Air Quality Standards (40 CFR Part 50)
(Ref. 30) and include a map of the region within a 62-mile (100-kilometer) radius of the site identifying
nonattainment and/or maintenance areas (as defined under the Clean Air Act of 1970) (42 U.S.C. 7401
et seq.) (Ref. 31), as amended) and a list of mandatory Class I Federal areas within the same radius. The
applicant should identify and describe onsite emission sources; provide site emissions data for all criteria
pollutants, volatile organic compounds, and any air toxics (i.e., hazardous air pollutants) that are locally
important for the last 5 years; and identify applicable permits.
In addition, if the applicant plans any refurbishment activities (see Section 2.3 of this RG) that
would require additional workers, the applicant should also include the following information in the ER
to assist the NRC staff in its review of the potential air quality impacts and to facilitate the NRC’s
conformity analysis in accordance with 40 CFR Part 93, as revised (see 75 FR 17254) (Ref. 32):
•

Estimate onsite and offsite vehicle emissions resulting from refurbishment activities, if
applicable, that contribute to the pollutants for which the area is in nonattainment or
maintenance,5 and identify the approximate locations of the emissions during the peak
employment period. This estimate may be based on the applicant’s estimate of vehicle miles
associated with commuting refurbishment workers, other activities directly associated with
refurbishment, and emission factors available in the current mobile source models approved by
the EPA Office of Transportation and Air Quality. 6

•

If construction equipment (such as cranes, trucks, or earthmoving equipment) is to be used during
refurbishment, emissions resulting from use of this equipment should be included for each month
that the equipment will be used. 7

•

Estimate fugitive dust emissions generated during ground-disturbing activities.

5
A good reference for this information is “Emissions Factors & AP 42, Compilation of Air Pollutant Emission
Factors” (historical and current information), which can be found at https://www.epa.gov/air-emissions-factors-andquantification/ap-42-compilation-air-emissions-factors.
6
Information on the most current EPA modeling tools for calculating vehicle emissions may be
obtained at https://www.epa.gov/moves.
7
Emissions for these sources can be calculated using EPA’s MOVES model available at
https://www.epa.gov/moves/nonroad-technical-reports.

Rev. 2 of RG 4.2, Supplement 1, Page 21

The applicant should also provide information in the ER regarding air pollutant emission
estimates for any new, proposed, modified, or replacement stationary sources, such as backup generators
and auxiliary boilers. These estimates should clearly indicate the governing regulations that apply, or are
assumed to apply, to the emission sources.
If the nuclear plant uses a cooling tower and is located in a State that regulates particulate
emissions from cooling towers, the applicant should conduct an appropriate assessment of such emissions
and report the results in the ER.
3.3

Noise

In this section, the applicant should identify the primary onsite noise-generating sources and
activities and indicate their distance to the nearest site boundary and noise-sensitive receptors. The
applicant should also identify and discuss primary offsite generating sources in the vicinity of the power
plant site. If ambient noise studies have been conducted at or near the nuclear plant site, the locations of
the measurements and the corresponding noise levels, along with meteorological conditions during the
measurement period, should be included. In particular, the applicant should provide information about
noise complaints.
3.4

Geologic Environment

Geology
In this section of the ER, the applicant should describe, in general, the site geologic setting,
including brief definitions of the rock types present, formation names, and thicknesses. This description
should consider geologic conditions or geologic hazards identified since plant construction, such as
landslide areas, karst features (e.g., sinkholes), and other conditions that could lead to land subsidence and
unstable soils. The seismic history of the site since construction, including the largest historic regional
earthquake, should be summarized. The ER should also briefly address any rare or unique geologic
resources, including rock, mineral, or energy rights and assets at or adjoining the site.
Soils
In this section of the ER, the applicant should describe, in general, the soils at the plant site,
including unconsolidated material that may be naturally occurring or consist of fill, including areas of
engineered fill such as those occurring around the nuclear island. The applicant should describe the soils
along with their relationship to the site geology (e.g., identify whether fill material was brought in from
off site or if onsite excavation material was used). The applicant should identify the erosion potential and
suitability and limitation ratings of site soils for current and proposed uses based on current soil mapping
and characterization data (see the Natural Resources Conservation Service’s “Web Soil Survey”)
(Ref. 33) and should describe best management practices to control erosion and runoff associated with
continued plant operations and refurbishment activities. Any projects undertaken at the plant site to
address erosion, subsidence, or sea level rise since the start of plant operations should also be described.
This section should also identify any soils that are prime farmland, unique farmland, and other farmland
of statewide or local importance on or adjoining the plant site that may be subject to the Farmland
Protection Policy Act (7 U.S.C. 4201 et seq.) (Ref. 34).

Rev. 2 of RG 4.2, Supplement 1, Page 22

3.5

Water Resources

Surface Water Resources
In this section of the ER, the applicant should describe the surface water resources at or near the
site, as well as the river and stream flow, lake and reservoir volume, water level measurements, intake and
discharge (outfall) specifications and operating parameters, and onsite ponds or other impoundments.
The presence of any delineated floodplains or zones of inundation for adjoining and onsite rivers,
streams, and other surface water features should be identified on maps and briefly described. A brief
discussion of the flooding history of the plant site, if any, since plant startup should also be provided. This
discussion should address the design and construction of critical plant infrastructure to resist flooding.
This section should also identify offsite surface water users withdrawing water from the same water body
affected by the plant, along with their locations and usage rates (see Section 4.5.1). Appropriate maps of
surface water features, intakes, and outfalls should be included.
The applicant should also describe local, State, and Federal permit information for enforcement of
water use; water treatment, including biocides and other water system additives and dechlorination
systems; NPDES-regulated discharges; storm water runoff controls; and the dredging program history and
methods, as applicable. The discussion of surface water resources should include current surface water
quality and both ambient conditions and monitoring results from available site studies. Reportable
incidents and/or notices of violation received from regulatory agencies related to surface water resources,
including any associated corrective actions taken or mitigation measures implemented by the applicant,
should be discussed.
An applicant for a Federal license to conduct activities that may cause a discharge of regulated
pollutants into navigable waters of the United States is required by Section 401 of the Clean Water Act of
1972, as amended (CWA; 33 U.S.C. 1251 et seq.) (Ref. 35), to provide the Federal licensing agency (in
this case, the NRC) with water quality certification from the certifying authority (i.e., State, Tribe,
interstate agency, or EPA, as applicable). This certification denotes that discharges from the project or
facility to be licensed will comply with CWA requirements and will not cause or contribute to a violation
of water quality standards.
In July 2020, EPA published a final rule revising the procedural requirements for CWA
Section 401 certifications at 40 CFR 121 (85 FR 42210) (Ref. 36) (Ref. 37). The final rule became
effective on September 11, 2020. The revised regulations at 40 CFR 121.6 require that the Federal
licensing agency establish the “reasonable period of time” and communicate that deadline to the
appropriate certifying authority within 15 days of receipt of the applicant’s certification request to the
certifying authority. Under the revised regulations, under no circumstances can the certifying authority
take more than one year to issue the requested certification, deny certification, or waive its right to certify.
The certifying authority’s failure or refusal to act on a certification request within the reasonable period of
time is considered a waiver.
If the applicant has not received Section 401 certification, the NRC cannot issue a renewed
license (initial LR or SLR) unless the certifying authority has otherwise waived the requirement.
Documentation of the applicant’s receipt of Section 401 water quality certification for license renewal
zone should be provided in the ER. The NRC also recognizes that some NPDES-delegated States
explicitly integrate their CWA Section 401 certification process with NPDES permit issuance under
CWA Section 402. In such cases, an applicant should provide a supporting discussion and reference
provisions in the nuclear power plant’s current NPDES permit, State statutes, or regulations that convey
Section 401 certification.
Rev. 2 of RG 4.2, Supplement 1, Page 23

Groundwater Resources
The ER should describe the site’s groundwater hydrology and identify the hydrostratigraphic
units and associated aquifers underlying the site. This discussion should link the previously described site
geology with groundwater conditions. The hydrogeologic description should include unit depths and
thicknesses, saltwater intrusion, depth to groundwater, groundwater flow directions and rates, and current
groundwater quality. Any special designations (e.g., sole source aquifer) should be described. Offsite
groundwater users should also be identified along with their locations, usage rates, and aquifers affected
(see Section 4.5.2). The applicant should further identify the number and location of onsite water supply
wells and monitoring wells on an accompanying map. For onsite supply wells, well capacities and recent
usage rates (covering the last 5 years) should be summarized. The applicant should also discuss plant
industrial practices involving the use of solvents, hydrocarbons, heavy metals, or other chemicals, and
whether such practices have caused soil or groundwater contamination. This discussion should describe
any current contamination and any ongoing corrective action activities. Onsite contaminant sources may
include lined or unlined wastewater ponds or lagoons, pipe and valve leakages, fuel spills, or other
inadvertent incidents. If no leaks, spills, or accidental releases have occurred that have caused soil or
groundwater contamination, the applicant should note that fact. If a plant has current or historical
information about soil or groundwater contamination resulting from industrial practices, the applicant
should describe the nature and extent of the contamination as compared to applicable soil and/or
groundwater quality standards and include the following specific information:
•

Provide a list of documented leaks, spills, or accidental releases, including their nature, location,
date, and amount spilled and/or released. Include the regulatory agency overseeing the incident
and whether a noncompliance or notice of violation was issued. Also, include a site map depicting
the locations of the listed incidents and corresponding contamination zones and groundwater
plumes.

•

Describe the cleanup or other mitigation completed for each of the documented leaks, spills, or
accidental releases.

•

Provide a summary of existing reports describing site soil and geology, soil and vadose zone
contamination, hydrogeologic characterization, and groundwater contamination and remediation.

The applicant should also describe any dewatering systems in operation, including dewatering
rates, and include them on a site map, if practicable.
3.6

Ecological Resources

Ecological resources include individuals, species, habitats, and ecosystems and their attributes.
The NRC typically addresses ecological resources as three resource groups: terrestrial resources, aquatic
resources, and federally protected ecological resources. Wetlands and floodplains, which are transitional
areas between terrestrial and aquatic systems, are generally described with terrestrial resources.

Rev. 2 of RG 4.2, Supplement 1, Page 24

Terrestrial Resources
The ER should describe the following attributes of the terrestrial environment.
Ecoregion
Identify the terrestrial ecoregion (Levels I, II, and III) and describe the typical characteristics of
the Level III ecoregion (e.g., climate, soils, common plant and animal species, characteristic habitat
types).
Site and Vicinity
Identify and describe the terrestrial habitats on and near the site and within ROWs of in-scope
transmission lines (e.g., oak-hickory forest, tallgrass prairie, tidal salt marsh, lacustrine wetland). Give
special attention to important habitats (e.g., important bird areas, known bat hibernacula, locally
significant habitats, natural heritage areas, wildlife sanctuaries and preserves, federally or State-managed
lands). Include any wetlands and riparian areas as part of the terrestrial habitat discussion.
Describe any major changes to the terrestrial environment during or after nuclear power plant
construction. These may be related to plant construction or operation or the result of other factors.
Note characteristic plant and animal species associated with each habitat type. Give special
attention to important species (e.g., keystone species, indicator species, representative species, migratory
birds protected under the Migratory Bird Treaty Act (16 U.S.C. § 703 et seq.) (Ref. 38), State-listed
species).
Note any non-native, nuisance, and invasive species of local or regional concern, especially those
known to be present on the site. Summarize management of such species undertaken at the site, if
applicable.
Studies and Monitoring
Describe terrestrial surveys, studies, and monitoring performed on or near the site, including
biological entities or ecological attributes chosen for investigation, methodology, results, conclusions, and
how conclusions relate to license renewal. Such studies may include wetland surveys, botanical surveys,
natural heritage inventories, habitat assessments, or surveys related to State-listed or otherwise sensitive
or protected species.
Procedures and Protocols
Describe any site or fleet-wide environmental procedures, wildlife management plans, best
management practices, and conservation initiatives undertaken at the site and relevant to terrestrial
resources. Relevant procedures and protocol may include landscape maintenance procedures,
transmission line ROW maintenance procedures, stormwater management plans, site environmental
review procedures that help workers identify and avoid impacts on the ecological environment when
performing site activities, and management or conservation plans related to memberships with
environmental stewardship councils.

Rev. 2 of RG 4.2, Supplement 1, Page 25

Permits and Regulatory Controls
Describe relevant regional, State, and Federal permits and controls that are in place to reduce or
mitigate impacts on the terrestrial environment.
Communications with Federal and State Agencies
Summarize the input of relevant Federal and State agencies with special expertise or jurisdiction
over terrestrial resources, as applicable, if the applicant has contacted or coordinated with such agencies
during preparation of the ER. Summarize the input of affected Indian Tribes, as applicable. Include copies
of correspondence with these agencies in an appendix to the ER.
Figures and Tables
Depict ecological information in maps and figures, as appropriate. Include maps that depict the
site and in-scope transmission lines. Land use maps; locations of Federal, State, and local parks and
natural areas; significant natural heritage areas; and other ecological information of special interest may
be appropriate, as well.
Present data in tables, when applicable. For instance, numerical results of botanical, wetland, and
species surveys may be best communicated in tabular form.
Aquatic Resources
The ER should describe the following attributes of the aquatic environment.
Ecoregion
Identify the marine ecoregion (if applicable) and describe typical characteristics of that ecoregion
(e.g., predominant oceanographic or topographic features, species composition, and dominant
biogeographic forcing agents, such as isolation, upwelling, nutrient inputs, freshwater influx, temperature
regimes, ice regimes, exposure, sediments, currents, and bathymetric or coastal complexity).
Site and Vicinity
Identify the waterbodies affected by nuclear power plant operations, including those within
ROWs of in-scope transmission lines, and describe the characteristics of the affected waterbodies,
including the following:
•

the aquatic habitats of the waterbodies

•

size, bathymetry, temperature regimes, streamflow and discharge, salinity, tidal flows, typical
seasonal fluctuations, sediment types, and general water quality

•

main channel, dams, and any flood controls

•

additional human uses of the waterbody other than for nuclear power plant cooling
(i.e., recreational, industrial, etc.)

Give special attention to important habitats (e.g., spawning and rearing areas, waters within
Federal or State parks and preserves).

Rev. 2 of RG 4.2, Supplement 1, Page 26

Identify the relevant watershed(s), including source and receiving waterbodies.
Identify the location of the cooling water intake and discharge structures in river miles, if
appropriate. Include the location, in river miles, of nearby dams and flood controls, as applicable.
Describe any major changes to the aquatic environment during or after nuclear power plant
construction. These may be related to plant construction or operation or the result of other factors.
Describe the trophic structure and identify important trophic links and potential for trophic
cascade.
Note characteristic plant and animal species associated with each affected waterbody. Give
special attention to important species (e.g., keystone species, indicator species, representative species,
State-listed species, recreational and commercially important fisheries, marine mammals) protected under
the Marine Mammal Protection Act of 1972, as amended (16 U.S.C. 1361 et seq.) (Ref. 39) and those
species vulnerable to impingement and entrainment).
Note any non-native, nuisance, and invasive species of local or regional concern, especially those
known to be present on the site. Summarize management of such species undertaken at the site, if
applicable.
Studies and Monitoring
Describe aquatic surveys, studies, and monitoring performed on or near the site, including
biological entities or ecological attributes chosen for investigation, methodology, results, conclusions, and
how conclusions relate to license renewal. Such studies should include baseline monitoring, impingement
and entrainment studies, thermal studies, biological characterization studies, and any other studies
conducted to support regulatory requirements of CWA Sections 316(a) and 316(b).
Procedures and Protocols
Describe any site or fleet-wide environmental procedures, wildlife management plans, best
management practices, and conservation initiatives undertaken at the site and relevant to aquatic
resources. Relevant procedures and protocol may include plans related to control of aquatic nuisance
species, transmission line ROW maintenance procedures, stormwater management plans, site
environmental review procedures that help workers identify and avoid impacts on the ecological
environment when performing site activities, and management or conservation plans related to
memberships with environmental stewardship councils.
Permits and Regulatory Controls
Describe relevant regional, State, and Federal permits and controls that are in place to reduce or
mitigate impacts on the aquatic environment. Describe any conditions of NPDES permits related to
impingement, entrainment, or the effects of thermal effluents on the aquatic environment. Include
information on CWA Section 404 dredge and fill permits, if applicable. Summarize relevant Federal or
State management initiatives, such as fish stocking programs.
Communications with Federal and State Agencies
Summarize the input of relevant Federal and State agencies with special expertise or jurisdiction
over aquatic resources, as applicable, if the applicable has contacted or coordinated with such agencies

Rev. 2 of RG 4.2, Supplement 1, Page 27

during preparation of the ER. Summarize the input of affected Indian Tribes, as applicable. Include copies
of correspondence with these agencies in an appendix to the ER.
Figures and Tables
Depict ecological information in maps and figures, as appropriate. Include maps that depict the
affected waterbodies, including any stream or water crossings associated with in-scope transmission lines.
Graphic depictions of thermal effluent modeling and maps that show aquatic sampling stations may be
appropriate as well.
Present data in tables, when applicable. For instance, numerical results of aquatic monitoring,
impingement and entrainment studies, and thermal studies may be best communicated in tabular form.
Federally Protected Ecological Resources
The ER should describe the following attributes of federally protected ecological resources. Such
resources include federally listed species and critical habitat protected under the Endangered Species Act
(ESA), Essential Fish Habitat (EFH) protected under MSA, and sanctuary resources protected under the
NMSA.
Federally Listed Species and Critical Habitat
Define the ESA action area. The action area includes all areas to be affected directly or indirectly
by the Federal action and not merely the immediate area involved in the action (50 CFR 402.02)
(Ref. 40). The action area is not limited to the footprint of the action nor is it limited by the Federal action
agency’s authority; rather, it is a biological determination of the reach of the proposed action on the listed
species.
Identify the federally listed species and critical habitats present in the action area. A helpful
resource is the U.S. Fish and Wildlife Service’s Environmental Conservation Online System Information
Planning and Consultation (IPaC) tool (available at https://ipac.ecosphere.fws.gov/ (Ref. 41). The IPaC
tool allows users to generate official species lists by entering project-specific information. However, the
usefulness of this tool directly relates to the accuracy of the information entered into the system. Prior to
initiating this step, be familiar enough with the potential effects of license renewal to be able to fully
define the action area and to input the action area into IPaC’s mapping tool. Notably, while the IPaC tool
may contain some species that are jointly under both Services’ jurisdiction (e.g., sea turtles), it typically
does not include species that are wholly under National Marine Fisheries’ jurisdiction (e.g., whales).
Information on these species should be sought from other sources.
For each federally listed species potentially present in the action area, describe the taxonomy,
physical appearance, distribution and relative abundance, habitat, life history, factors affecting the
species’ endangered or threatened status, and occurrence of the species within the action area.
For each designated critical habitat present in the action area, describe the characteristics of the
physical and biological features of the habitat, designated boundaries, and location in relation to the
nuclear power plant site and action area. Include maps, when available.
Include candidate and proposed species and proposed critical habitats, as appropriate.

Rev. 2 of RG 4.2, Supplement 1, Page 28

Essential Fish Habitat
Define the affected area. This step is like determining the ESA action area. Unlike the ESA,
however, the MSA and its regulations do not specifically prescribe or define terminology for the affected
area. For projects involving both an ESA analysis and EFH analysis, the ESA action area and the EFH
affected area are likely identical; both should account for all areas over which direct or indirect impacts to
ecological receptors could occur. A primary difference between the two could be that an ESA action area
may involve large areas of land that do not apply to the EFH affected area if that land does not contain
any aquatic habitat or features.
Identify the EFH present in the affected area and the federally managed species (herein referred
to as “EFH species”) and life stages to which the EFH applies. A helpful resource is the National Marine
Fisheries Service’s EFH Mapper tool (available at: https://www.habitat.noaa.gov/apps/efhmapper/
(Ref. 42). This tool allows users to view spatial representations of fish species, their life stages, and
important habitats. The mapper displays data layers for EFH, habitats of particular concern (HAPCs), and
EFH areas protected from fishing. It includes links to supporting materials, such as fishery management
plans, which contain the official regulatory EFH descriptions.
Describe the distribution, habitat preferences, and diet of each EFH species and life stage.
Describe the physical and biological characteristics of the EFH by species and life stage. Give
special attention to HAPCs, when applicable.
Consider prey of EFH species that may be present in the affected area and include these species
in the discussion.
Sanctuary Resources
Define the affected area. This step is like determining the ESA action area. Unlike the ESA,
however, the NMSA and the National Oceanic and Atmospheric Administration’s Office of National
Marine Sanctuaries guidance do not specifically prescribe or define terminology for the affected area. For
projects involving an ESA analysis, EFH analysis, and/or an NMSA analysis, the ESA action area, the
EFH affected area, and/or the NMSA affected area are likely identical; each should account for all areas
over which direct or indirect impacts to ecological receptors could occur. Primary differences could be
that an ESA action area may involve large areas of land that do not apply to the NMSA affected area. The
EFH affected area could include freshwater bodies or non-marine aquatic habitats or features that do not
apply to the NMSA affected area.
Identify the national marine sanctuary present in the affected area. Maps of designated and
proposed sanctuaries are available at https://sanctuaries.noaa.gov/about/maps.html (Ref. 43). Consider
both designated and proposed sanctuaries in the discussion.
Describe the sanctuary resources. Sanctuary resources include any living or nonliving resource of
a national marine sanctuary that contributes to the conservation, recreational, ecological, historical,
educational, cultural, archaeological, scientific, or aesthetic value of the sanctuary.
Notably, sanctuary resources can include historic resources in addition to ecological resources.
Thus, this discussion should be coordinated with the historic and cultural resource analysis if any historic
sanctuary resources are present, and the two discussions may be cross-referenced, as appropriate.

Rev. 2 of RG 4.2, Supplement 1, Page 29

Studies and Monitoring
Describe surveys, studies, and monitoring performed on or near the site concerning federally
protected ecological resources, if not previously described in the ER. Include biological entities or
ecological attributes chosen for investigation, methodology, results, and conclusions.
Procedures and Protocols
Describe any site or fleet-wide environmental procedures, wildlife management plans, best
management practices, and conservation initiatives undertaken at the site and relevant to federally
protected ecological resources, if not previously described in the ER.
Permits and Regulatory Controls
Describe relevant regional, State, and Federal permits and controls that are in place to reduce or
mitigate impacts on federally protected ecological resources, if not previously described in the ER.
Communications with Federal and State Agencies
Summarize the input of relevant Federal and State agencies with special expertise or jurisdiction
over federally protected ecological resources, as applicable. Specifically, this should include the U.S. Fish
and Wildlife Service and National Marine Fisheries Service concerning ESA-listed species and critical
habitats, National Marine Fisheries Service concerning EFH, and the National Oceanic and Atmospheric
Administration’s Office of National Marine Sanctuaries concerning national marine sanctuaries and their
resources. Summarize the input of affected Indian Tribes, as applicable. Include copies of correspondence
with these agencies in an appendix to the ER.
Figures and Tables
Depict ecological information in maps and figures, as appropriate. Present data in tables, when
applicable.
3.7

Historic and Cultural Resources

Historic and cultural resources are the remains of past human activities and include precontact
(i.e., prehistoric) and historic era archaeological sites, districts, buildings, structures, and objects. Historic
and cultural resources also include elements of the cultural environment such as landscapes, sacred sites,
and other resources that are of religious and cultural importance to Indian Tribes, such as traditional
cultural properties that are important to a living community of people for maintaining its culture. Historic
and cultural resources are considered to be historically significant if they have been determined eligible
for or have been listed on the National Register of Historic Places (NRHP). A historic property is a
historic or cultural resource that is eligible for or listed on the NRHP.8

8

As defined in 36 CFR 800.16(l)(1), “Historic property means any prehistoric or historic district, site, building, structure, or
object included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of Interior.
This term includes artifacts, records, and remains that are related to and located within such properties.” As defined in 36 CFR
800.16(l)(2), “The term eligible for inclusion in the National Register includes both properties formally determined as such in
accordance with regulations of the Secretary of the Interior and all other properties that meet National Register listing criteria.”
National Register criteria for listing are found in 36 CFR Part 60 (Ref. 44), “National Register of Historic Places.”

Rev. 2 of RG 4.2, Supplement 1, Page 30

NEPA requires Federal agencies to take into account the potential effects of their actions on the
cultural environment. The NHPA requires Federal agencies to consider the impacts of their undertakings 9
on historic properties and consult with the appropriate State Historic Preservation Officer (SHPO), Tribal
Historic Preservation Officer (THPO), or Indian Tribes on a government-to-government basis, and other
parties with an interest in the effects of the undertaking, including local governments and the public, as
applicable.
The applicant should rely on qualified professionals who meet the Secretary of Interior’s
standards, 36 CFR Part 61, “Professional Qualification Standards” (Ref. 45), to develop the historic and
cultural resource sections in the ER. The applicant should use Section 106 of the NHPA and the
implementing regulations at 36 CFR Part 800, “Protection of Historic Properties,” as a guide for
providing historic and cultural resource information in the ER. An applicant should engage with the
SHPO, THPO, Indian Tribes, and interested parties for the purposes of gathering information in
developing its ER. 10 Information gathering by an applicant is not considered consultation pursuant to
36 CFR 800. Consultation with the SHPO, THPO, Indian Tribes, and interested parties is the
responsibility of the NRC.
The applicant should identify the boundaries of the proposed direct (e.g., physical) and indirect
(e.g., visual and auditory) area of potential effects (APE) 11 to be recommended to the NRC. Once the
proposed APE has been determined, the applicant should describe historic and cultural resources that
have been identified as well as any cultural resources investigations completed within the APE.
Applicants should engage the SHPO to determine if further cultural resource investigations are needed to
identify historic and cultural resources located within the APE, determine if they are eligible for listing on
the NRHP, assess affects, and develop avoidance or mitigation plans to resolve adverse effects. The NRC
will use this information to support its NHPA Section 106 consultation and assessment of effects for the
proposed project.
Consistent with 36 CFR 800.16(d), the NRC typically defines the license renewal (initial LR or
SLR) APE to include lands within the nuclear power plant site boundary and the transmission lines up to
the first substation that may be directly (e.g., physically) affected by land-disturbing or other operational
activities associated with continued plant operations and maintenance and/or refurbishment activities. The
APE may extend beyond the nuclear plant site when these activities may indirectly (e.g., visual and
auditory) affect historic properties. This determination is made irrespective of land ownership or control.
The applicant should describe the nuclear power plant site and provide the following information in the
ER:
•

A U.S. Geological Survey quadrangle map that identifies the direct and indirect APEs.

•

Legal description of the APE appropriate for the proposed project area. Note that not all areas of
the U.S. (i.e., the original 13 colonies) use the Public Land Survey System (e.g., township, range,
and section information).

9

As defined in 36 CFR 800.16(y), an undertaking is “a project, activity, or program funded in whole or in part under the direct or
indirect jurisdiction of a Federal agency, including those carried out by or on behalf of a Federal agency; those carried out with
Federal financial assistance; and those requiring a Federal permit, license or approval.”
10
Pursuant to 36 CFR 800.2(c)(2)(ii), the NRC is responsible for consulting with Indian Tribes or Native Hawaiian organizations
that attach religious and cultural significance to historic properties that may be affected by an undertaking.
11
As defined in 36 CFR 800.16(d), “Area of potential effects means the geographic area or areas within which an undertaking
may directly or indirectly cause alterations in the character or use of historic properties, if any such properties exist. The area of
potential effects is influenced by the scale and nature of an undertaking and may be different for different kinds of effects caused
by the undertaking.”

Rev. 2 of RG 4.2, Supplement 1, Page 31

•

Identification of any parts of the APE that are Federal, State, or Indian reservation or trust lands.

Cultural Background
This section of the ER should discuss the historic use of the land and the activities that have
occurred within the APE and the surrounding area. This includes a description of the cultural history of
the region (including the proposed project site) from the beginning of human settlement to the present,
and summarizes how this information was collected for the proposed APE. Information can be derived
from background research (literature review and site file search) and from the use of plat and other
historic maps showing ownership, acreage, property boundaries, and the location of existing or former
historic structures. Other sources that can assist with description of the cultural background include land
records, archival sources, local museums or historical societies, libraries, planning documents,
mapping/imaging, and online sources. If available, consult ethnohistoric sources to identify Indian Tribes
and other groups that may have historic and cultural ties to the proposed project area. The ER should
include, if available, photos of the plant site before construction, preconstruction (showing land clearing),
during construction, and postconstruction of the current facility.
Historic and Cultural Resources at the Site and in the Vicinity
This section of the ER should describe historic and cultural resources identified within the direct
and indirect APEs (e.g., including in-scope transmission lines, and in the vicinity). Applicants should
indicate whether a records review for historic and cultural resources was conducted. Historic and cultural
resource survey reports specifically prepared for license renewal should be referenced and submitted with
the license application or otherwise made available to NRC for review (e.g., via secure online portal).
However, information (i.e., reports, maps, and site forms) that discloses the locations of unevaluated,
potentially eligible, or eligible historic properties (e.g., archaeological sites) should be withheld from
public disclosure. This information may be protected under NHPA Section 304 (54 U.S.C. 100707),
especially if there is a risk of harm to the resource. The NRC protects cultural resource information
disclosing the location of cultural resources (e.g., maps) under Section 304 of the NHPA, consistent with
10 CFR 2.390(a)(3). Section 304 of NHPA requires the NRC to “withhold from disclosure to the public,
information about the location, character, or ownership of a historic resource if the agency and the
Secretary of the Interior agree that disclosure may (1) cause a significant invasion of privacy, (2) risk
harm to the historic resource, or (3) impede the use of a traditional religious site by practitioners.”
Applicants should discuss with the NRC staff during preapplication interactions how to handle sensitive
historic and cultural resource information.
The ER should provide the following information:
•

description of all past and current historic and cultural resource investigations conducted to
identify historic and cultural resources within and surrounding the APE

•

documentation of field methods used to identify historic and cultural resources within the APE

•

description of all historic and cultural resources, (e.g., precontact and historic archaeological
sites, standing structures, cemeteries, and traditional cultural properties), and isolated finds and
features within the APE

•

evaluation of historic and cultural resources for NRHP eligibility (i.e., historic properties)
including:
–

a description of the process and methods used to evaluate these resources
Rev. 2 of RG 4.2, Supplement 1, Page 32

–

documentation of SHPO, THPO, and Indian Tribes’ concurrence with process,
methods, and conclusions

The applicant is encouraged to engage the NRC staff as early as possible in the planning process,
in accordance with 10 CFR 51.40, “Consultation with NRC staff,” to avoid issues related to disclosing
sensitive location information related to historic and cultural resources when drafting the ER.
Procedures and Integrated Cultural Resources Management Plans
If historic properties or cultural resources are located within the APEs, the applicant should
establish procedures or implement an integrated management plan to protect the historic and cultural
resources identified. These plans or procedures are not required to be included in the ER; however, the
ER should acknowledge if they exist or are being drafted, as applicable.
NHPA Section 106 Consultation
Consultation in support of NHPA Section 106 is the responsibility of the Federal agency, and the
NRC is required to take the lead on consulting with the SHPO, THPO, Indian Tribes (on a governmentto-government basis), and interested parties as outlined in 36 CFR 800; consultation is not the
responsibility of the applicant. 12 The applicant should engage with these parties to gather sufficient
information pertinent to the NHPA Section 106 review process in order to assist the NRC in the timely
completion of its NHPA Section 106 compliance requirements. The ER should contain a summary of the
applicant’s initial outreach efforts to date, including the process used to identify Indian Tribes and
potential interested parties that may have a demonstrated interest in the proposed project. The applicant
should evaluate the significance of the historic and cultural resources and assess any effects the proposed
project may have on them. For areas not surveyed (e.g., areas too disturbed or devoid of potential historic
and cultural resources), proper documentation, a basis for exclusion, and concurrence on survey
methodology from the SHPO should be provided.
The ER should contain copies of all correspondence with the SHPO, THPO, Indian Tribes, or
members of the public with whom the applicant engaged to gather information about historic and cultural
resources within the APE. These documents should be included in an appendix of the ER. The applicant
should provide the information and analysis needed for the NRC to comply with Section 106
requirements in a manner that minimizes the potential for delays in the environmental review.
3.8

Socioeconomics

The ER should include the following information to assist NRC staff in its review of the potential
socioeconomic impacts during the license renewal term (initial LR or SLR):
•

Based on information provided in Section 2.5, provide current employee residential distribution
information in a table showing the annual average number of nuclear power plant workers by
county and community. Also indicate where refueling and maintenance outage workers generally
stay. Identify commuter routes for the workers and traffic conditions on local roads.

12
If an applicant is corresponding with Indian Tribes before the NRC initiates government-to-government
consultation, then the applicant should clarify to the Indian Tribes that the NRC will be initiating and conducting
government-to-government consultation at a later date for the project. A federally recognized Indian Tribe is not
obligated to consult with an applicant or share information about properties of religious and cultural significance
with an applicant. A federally recognized tribe may prefer to communicate directly with NRC at the government-togovernment level.

Rev. 2 of RG 4.2, Supplement 1, Page 33

•

Describe public recreational facilities and tourist attractions located in the vicinity of the nuclear
power plant, including projected use if available.

•

Provide a table showing the distribution of property tax payments and discuss other payments,
including payments in lieu of taxes to local jurisdictions (e.g., county, municipality, townships,
villages, and school districts) for the past 5 years and the associated total revenue or property tax
revenue for each jurisdiction and school district.

•

Discuss any adjustments to payments caused by reassessments and other actions (including legal
actions) that resulted in notable increases or decreases in payments to local jurisdictions.

3.9

Human Health

In this section of the ER, the applicant should summarize information about human health
conditions and hazards at the nuclear power plant to assist the NRC staff in its review of potential human
health impacts during the license renewal period (initial LR or SLR). This should include a discussion of
the plant workforce adherence to safety standards and their use of protective equipment, as required by
Federal and State regulations, as it pertains to occupational safety and health hazards at the plant.
Radiological Hazards
The applicant should describe the general radiological health environment of the nuclear power
plant with respect to the following:
•

historical data on occupational doses to plant workers

•

discussion of any abnormal radionuclide releases, including the types of radionuclides released,
calculated doses from the release, monitoring plans to track the release, and any corrective
measures performed

•

information on potential changes in radiological impacts to the public and workers from
continued plant operations during the renewal term

•

information on the radiological impacts of any planned refurbishment activities

Microbiological Hazards
Microorganisms that are associated with cooling towers and thermal discharges to waters of the
United States accessible to the public can have negative impacts on human health. Microbiological
organisms of concern for public and occupational health, including enteric pathogens (bacteria that
typically exist in the intestines of animals and humans [e.g., Pseudomonas aeruginosa]), thermophilic
fungi, bacteria (e.g., Legionella spp. and Vibrio spp.), free-living amoebae (e.g., Naegleria fowleri and
Acanthamoeba spp.), as well as organisms that produce toxins that affect human health (e.g.,
dinoflagellates [Karenia brevis] and blue-green algae). Exposure to these microorganisms, or in some
cases the endotoxins or exotoxins produced by the organisms, can cause illness or death.
The applicant should consult the State agency responsible for environmental health regarding the
potential existence and concentration of the above microorganisms in the receiving waters for plant
cooling water discharge to waters of the United States accessible to the public. The applicant should
document the results of this consultation in the ER. The ER should include copies of correspondence with
the responsible agency indicating concurrence with the applicant’s risk assessment and proposed
Rev. 2 of RG 4.2, Supplement 1, Page 34

mitigation strategy, if one is required. The ER should include information on any known upstream heat
load contributors to the river and their locations relative to the plant. The ER should also include
information regarding any known local, State, or Federal regulations that would govern monitoring
requirements and the possible modification of discharge permit limits, if thermophilic microbiological
organisms are a concern at the plant’s discharge.
Electric Shock Hazards
The ER should describe the in-scope transmission lines and include maps, photographs, or
drawings indicating the corridor for these lines. Include a discussion of transmission corridor access and
measures taken to meet the National Electric Safety Code (NESC) (Ref. 46), such as clearance standards
and 5mA induced current requirements. The ER should also note any onsite Occupational Safety and
Health Administration or industrial safety programs for electrical safety. The applicant should determine
whether any locations within the in-scope transmission lines do not meet current NESC standards and
indicate these areas on provided maps, photographs, or drawings in the ER. The applicant should also
discuss maintenance and associated safety procedures for worker, and if appropriate, public activities near
these locations.
Postulated Accidents
The applicant should provide the best available core damage frequencies and large early relief
frequencies values for all hazards and reactor power uprates for comparison to the LR GEIS values. The
applicant should also provide summary information regarding any accidents that exceed the design basis
with justification for its acceptability during the initial LR or SLR term.
3.10

Environmental Justice

To assist NRC staff in its review of potential human health effects that could occur as a result of
license renewal (initial LR or SLR), the applicant should describe the general demographic composition
of minority populations, low-income populations and communities (by race and ethnicity), and Indian
Tribes in the vicinity of the nuclear power plant that could be affected by continued reactor operations
and refurbishment activities. The geographic scale should be commensurate with the impact area to
facilitate the evaluation of potentially affected environmental justice communities and neighborhoods that
may be disproportionately affected. The ER should also include information about migrant workers and
provide geographic information about the location of these populations and communities. Migrant
workers are those who move from one location to another in response to various employment
opportunities associated with seasonal farming, construction, and manufacturing.
3.11

Waste Management

The ER should describe the nuclear plant’s radioactive and nonradioactive waste management
systems and programs. Some of this information can be incorporated by reference to Section 2.2 of the
ER. The ER should include the following information:
•

a description of the radioactive and nonradioactive waste management systems designed to
collect, store, and dispose of all wastes generated and effluent control systems, including the
systems and controls used for liquid, gaseous, and solid wastes, or alternatively, citations showing
where such information would be available in the final safety analysis report or other documents
submitted to the NRC

Rev. 2 of RG 4.2, Supplement 1, Page 35

•

pollution prevention and waste minimization measures in place or planned to reduce or eliminate
the quantities of gaseous and liquid emissions to the environment and the quantities of wastes
shipped offsite for processing or disposal

•

descriptions, names, and locations of facilities currently used and likely to be used in the future
for offsite processing and disposal of wastes

•

information on current disposal activities including size and location of disposal sites as well as
the plans for ultimate treatment and/or restoration of retired disposal sites

•

identification of radiation sources stored onsite as solid waste (e.g., contaminated equipment,
low-level radioactive waste storage, storage of used steam generators)

•

independent spent fuel storage

•

description of all sources, types, quantities, and composition of solid, hazardous, radioactive, and
mixed wastes expected from the proposed action

•

anticipated disposal plans for all wastes (i.e., transfer to an offsite waste disposal facility,
treatment facility, or storage onsite)

•

description of waste management cumulative impacts

3.12

Greenhouse Gas Emissions and Climate Change

In this section of the ER, the applicant should discuss and identify direct and indirect GHG
emission sources (e.g., stationary combustion sources, mobile sources, refrigeration systems, electrical
transmission and distribution systems) at the site. This discussion should quantify GHG emissions from
these sources in carbon dioxide equivalents for at least the last 5 years. If the applicant plans any
refurbishment activities, the applicant should also include GHG emissions resulting from refurbishment,
including an estimate of GHG emissions from additional worker vehicles and construction equipment.
This section of the ER should also describe any observed regional changes in key climate change
indicators (e.g., precipitation, temperature, storm frequency and severity, sea level rise, floods, and
droughts) from climate assessment reports (e.g., U.S. Global Change Research Program,
Intergovernmental Panel on Climate Change) and onsite and vicinity monitoring (e.g., trends in site
meteorological data, temperatures of surface water resources that are affected by the plant).
Chapter 4

Environmental Consequences of the Proposed Action and Mitigating Actions

General Guidance
As previously discussed, the LR GEIS evaluates 80 environmental issues, and analyses have
determined that 59 of these issues, identified as Category 1 issues in the LR GEIS, are adequately
addressed for all applicable nuclear plants. The NRC will not require additional analysis in plant-specific
environmental reviews unless new and significant information is identified. Chapter 5 of this RG, which
addresses preparation of Chapter 5 of the ER, discusses ways to identify new and significant information.
The applicant may adopt the findings in the LR GEIS for Category 1 issues if no new and significant
information is discovered.

Rev. 2 of RG 4.2, Supplement 1, Page 36

Of the remaining 21 NEPA issues, 20 are identified as Category 2 issues, which require plantspecific environmental assessments. The following sections discuss information that the applicant should
include in the ER to assist the NRC staff in evaluating the impacts of these 20 Category 2 issues. One
issue (“Electromagnetic fields [EMFs])” is not categorized at this time. The issue of EMFs remains
uncategorized because there is no scientific consensus on the potential impacts from exposure to EMFs.
The NRC staff discusses this situation in the LR GEIS and in nuclear power plant-specific (hereafter
called plant-specific) supplements to the LR GEIS.
The presentation of Category 2 issues in this section follows the format of Table B-1 for each
Category 2 issue in Appendix B to Subpart A of 10 CFR Part 51. This discussion also references the
specific requirements stated in 10 CFR 51.53(c)(3)(ii). The steps for reviewing each Category 2 issue
include: (1) determine whether the NEPA issue is applicable to the environmental review of this nuclear
plant using the criteria given in 10 CFR 51.53(c)(3)(ii)(A) through (Q); (2) if not applicable, briefly
explain in the ER why it is not applicable; and (3) if the issue is applicable, provide the information and
assessment specified in the appropriate section below. The assessment and other information should be
sufficient to determine the extent of the environmental effects and the significance of the impact as
defined in the “Impact Findings” section located in Section C.1 of this RG.
The applicant should assess direct, indirect, and cumulative effects or impacts. Section C.1 of this
RG defines these effects.
The applicant should also consider mitigation measures to reduce or avoid adverse effects where
applicable. The applicant should identify and discuss possible mitigation measures in proportion to the
significance of the adverse impact. If there is no adverse impact to be mitigated, the applicant should
present the basis for that determination. For those mitigation measures discussed in the ER, the applicant
should describe the benefits and costs of each measure. Section C.1 of this RG defines mitigation
measures.
The applicant should include map information as appropriate in the ER for issues addressed in
Chapter 4. This section should also present any new and significant information in sufficient detail and
depth to support an impact assessment. Text, tables, and graphic information should support the
assessment of impacts presented in Chapter 4 of the ER.
4.1

Land Use and Visual Resources

Land use and aesthetic impacts are evaluated in the LR GEIS and are generic (the same or similar
at all plants) or Category 1. The applicant should discuss any new and significant information in the ER,
if applicable; otherwise, land use and aesthetic impacts do not need to be analyzed.
4.2

Air Quality

Air quality impacts are evaluated in the LR GEIS and are generic (the same or similar at all
plants) or Category 1. The applicant should discuss any new and significant information in the ER, if
applicable; otherwise, air quality impacts do not need to be analyzed.
4.3

Noise

Noise impacts are evaluated in the LR GEIS and are generic (the same or similar at all plants)
or Category 1. The applicant should discuss any new and significant information in the ER, if applicable;
otherwise, noise impacts do not need to be analyzed.

Rev. 2 of RG 4.2, Supplement 1, Page 37

4.4

Geology and Soils

Geology and soils impacts and related geologic conditions and the effects on the associated
resources (e.g., rock and mineral resources) are evaluated in the LR GEIS and are generic (the same or
similar at all plants) or Category 1. The applicant should discuss any new and significant information in
the ER, where applicable; otherwise, geology and soils impacts do not need to be analyzed.
4.5

Water Resources
The following water resources-related Category 2 issues require a plant-specific assessment.

4.5.1

Surface Water Resources

Surface Water Use Conflicts (Plants with Cooling Ponds or Cooling Towers Using Makeup Water
from a River)
This section applies to nuclear power plants with cooling ponds or cooling towers using makeup
water from a river.
Table B-1 of Appendix B to Subpart A of 10 CFR Part 51 (referred to throughout this section as
Table B-1) states, “Impacts could be of small or moderate significance, depending on makeup water
requirements, water availability, and competing water demands.”
Specifically, 10 CFR 51.53(c)(3)(ii)(A) requires, in part, the following:
If the applicant’s plant utilizes cooling towers or cooling ponds and withdraws makeup
water from a river, an assessment of the impact of the proposed action on water
availability and competing water demands, the flow of the river…must be provided.
Section 4.5.1.1.9 of the LR GEIS discusses surface water use conflicts. Additional surface water
conflict information is needed only for plants withdrawing makeup water from a river. If the plant meets
this condition, the applicant should provide the information and analysis described below.
Information and Analysis Content
If the plant obtains its water from a river as defined above and uses cooling towers or cooling
ponds, the applicant should include the following information in the ER:
•

Provide estimates of the quantities and timing of cooling water withdrawals and discharges.
Estimate current consumptive water use and future consumptive water use during the license
renewal period. Provide water level, flow, and stream gauge data so that water balance
calculations can be verified.

•

Compare the consumptive water use by the heat dissipation system to flows in the source water
body (i.e., the river from which water is withdrawn for cooling tower or cooling pond makeup
water). Base this comparison on records of the current license period. Project and compare
consumptive use and stream flows during the license renewal period.

•

Estimate the quantities of other ongoing water withdrawals and consumptive water uses in the
portion of the water body affected by the plant and indicate whether these withdrawals or uses are
expected to change during the license renewal period.

Rev. 2 of RG 4.2, Supplement 1, Page 38

•

4.5.2

Describe mitigation measures (e.g., limiting withdrawals during droughts) that have been used to
reduce the adverse impacts on river flow of consumptive water use and the mitigation measures
that are expected to be used during the license renewal period. Briefly explain the rationale for
rejecting measures that were considered but not implemented.
Groundwater Resources

Groundwater Use Conflicts (Plants That Withdraw More Than 100 Gallons per Minute)
This section applies to plants using more than an annual average of 100 gallons per minute
(gpm) (378 liters per minute [L/min]) of groundwater.
Table B-1 states, “Plants that withdraw more than 100 gpm could cause groundwater use conflicts
with nearby groundwater users.”
Specifically, 10 CFR 51.53(c)(3)(ii)(C) requires the following:
If the applicant’s plant pumps more than 100 gallons (total onsite) of groundwater per
minute, an assessment of the impact of the proposed action on groundwater must be
provided.
Section 4.5.1.2.3 of the LR GEIS discusses this issue. If the applicant can provide withdrawal
records or other evidence that the plant does not pump more than an annual average of 100 gpm
(378 L/min) of groundwater, the applicant should note this fact in the ER and need not provide additional
information.
Information and Analysis Content
If the plant pumps more than an annual average of 100 gpm (378 L/min), the applicant should
provide the following information and analyses to enable the NRC staff to assess the magnitude and
significance of potential groundwater use conflicts during operation:
•

Describe all groundwater aquifers potentially impacted by the operation of the licensee’s onsite
wells and wells that may be on adjacent property that support nuclear power plant operations,
including approximate areal extent, thickness, porosities, and hydraulic conductivities of aquifer
strata. Discuss significant uncertainties, anisotropies, and inhomogeneities.

•

Describe existing and known future offsite and onsite wells, including average flow rate, peak
flow rate, water use, and completion depth.

•

Include maps of steady-state piezometric surfaces estimated with onsite and offsite wells at peak
pumpage, average pumpage, and no pumpage. These maps should indicate the location of all
wells and should annotate each offsite well with the drawdown of the piezometric surface
attributable to both the onsite and offsite wells.

•

Describe the methods of analysis, including the assumptions used.

•

Describe existing and known future water rights (including Tribal water rights).

•

Describe any wetlands in the vicinity that might be impacted by a lowered water table.

Rev. 2 of RG 4.2, Supplement 1, Page 39

•

Evaluate the significance of the present and future effects of onsite withdrawal on offsite wells.
Additionally, describe any potential mitigation measures and state whether they will be or have
been implemented.

Groundwater Use Conflicts (Plants with Closed-Cycle Cooling Systems That Withdraw Makeup
Water from a River)
This section applies to plants using cooling towers or cooling ponds that withdraw makeup water
from a river.
Table B-1 states the following:
Water use conflicts could result from water withdrawals from rivers during low-flow
conditions, which may affect aquifer recharge. The significance of impacts would depend
on makeup water requirements, water availability, and competing water demands.
Specifically, 10 CFR 51.53(c)(3)(ii)(A) requires, in part, the following:
If the applicant’s plant utilizes cooling towers or cooling ponds and withdraws makeup
water from a river, an assessment of the impact of the proposed action on water
availability and competing water demands, the flow of the river … must be provided. The
applicant shall also provide an assessment of the impacts of the withdrawal of water from
the river on alluvial aquifers during low flow.
Section 4.5.1.2.4 of the LR GEIS discusses this issue. Additional groundwater use conflict
information is needed only for plants withdrawing makeup water from a river. If the plant meets this
condition, the applicant should provide the information and analysis described below.
Information and Analysis Content
If the plant withdraws cooling tower or cooling pond makeup water from a river, the applicant
should provide the following information and analyses to enable the NRC staff to assess the groundwater
use conflicts during operation:
•

Provide a description of alluvial aquifers near the site that could be affected by surface water (see
also Section 4.5.1 above) and groundwater withdrawal, including approximate areal extent,
thickness, porosities, hydraulic conductivities of aquifer strata, and their interaction with the
affected river makeup source as river gage height varies.

•

Describe existing and known future offsite and onsite wells, including average flow rate, peak
flow rate, water use, and completion depth.

•

Include maps of steady-state piezometric surfaces estimated with onsite and offsite wells at peak
pumping rates, average pumping rates, and no pumping. These maps should indicate the location
of all wells, and each offsite well should be annotated with the drawdown of the piezometric
surface attributable to both the onsite and offsite wells. Describe the methods of analysis,
including the assumptions used.

•

Describe existing and known future water rights (including Tribal water rights).

•

Describe any wetlands in the vicinity that might be affected by a lowered water table.
Rev. 2 of RG 4.2, Supplement 1, Page 40

•

Evaluate the significance of the present and future effects of onsite withdrawal on offsite wells.
Additionally, describe any potential mitigation measures and state whether they will be or have
been implemented.

Groundwater Quality Degradation (Plants with Cooling Ponds)
This section applies to plants that have cooling ponds.
Table B-1 states the following:
Sites with cooling ponds could degrade groundwater quality. The significance of the
impact would depend on site-specific conditions including cooling pond water quality,
site hydrogeologic conditions (including the interaction of surface water and
groundwater), and the location, depth, and pump rate of water wells.
Specifically, 10 CFR 51.53(c)(3)(ii)(D) requires the following:
If the applicant’s plant utilizes cooling ponds, an assessment of the impact of the
proposed action on groundwater quality must be provided.
Section 4.5.1.2.6 of the LR GEIS also discusses this issue.
Information and Analysis Content
If the plant uses cooling ponds, the applicant should provide the following information and
analyses to enable the NRC staff to assess the presence and magnitude of groundwater quality degradation
during operation:
•

Describe cooling pond characteristics (e.g., liners or impermeable materials used, impermeable
soils) that would retard or prevent infiltration into local aquifers.

•

Identify the types and concentrations of impurities in the cooling pond water and the chemistry of
soils along pathways to local aquifers to determine whether cooling pond water can contaminate
the groundwater.

•

Describe water quality and other characteristics of local aquifers that could be affected by
infiltration of cooling pond water.

•

Provide Federal, State, and local groundwater quality requirements with emphasis on any changes
to these requirements that have occurred during the plant’s current license term and any
anticipated changes to those requirements during the license renewal term.

•

Identify and characterize offsite groundwater users who could be affected by the degradation of
aquifers. Include locations and elevations of offsite wells, pumping rates, screened intervals,
depth to water, and an estimate of the groundwater needs of local users.

•

Describe possible mitigation measures, if they are warranted, and whether they will be or have
been implemented.

Rev. 2 of RG 4.2, Supplement 1, Page 41

Radionuclides Released to Groundwater
Table B-1 states the following:
Leaks of radioactive liquids from plant components and pipes have occurred at numerous
plants. Groundwater protection programs have been established at all operating nuclear
power plants to minimize the potential impact from any inadvertent releases. The
magnitude of impacts would depend on site-specific characteristics.
Specifically, 10 CFR 51.53(c)(3)(ii)(P) requires the following:
An applicant shall assess the impact of any documented inadvertent releases of
radionuclides into groundwater. The applicant shall include in its assessment a
description of any groundwater protection program used for the surveillance of piping
and components containing radioactive liquids for which a pathway to groundwater may
exist. The assessment must also include a description of any past inadvertent releases and
the projected impact to the environment (e.g., aquifers, rivers, lakes, ponds, ocean) during
the license renewal term.
Section 4.5.1.2.7 of the LR GEIS discusses this issue.
Information and Analysis Content
Each Nuclear Energy Institute (NEI) member company for their nuclear power plants has
committed to following the guidance developed by NEI and contained in NEI 07-07, “Industry Ground
Water Protection Initiative—Final Guidance Document,” issued August 2007 and revised in 2019
(Ref. 47). The purpose of the voluntary initiative is to improve a nuclear power plant’s programs for
preventing, detecting, and responding to inadvertent releases of radioactive materials that may result in
low but detectable levels of plant-related materials in subsurface soils and groundwater. Because each
nuclear power plant has developed a site-specific groundwater protection program, the NRC staff must
review the implementation of each plant’s program.
For those nuclear power plants that have groundwater monitoring systems composed of wells, the
ER should contain the following information, as applicable, with respect to documented inadvertent
releases of radionuclides into groundwater (i.e., reports required by 10 CFR 20.2202 (Ref. 48), 10 CFR
20.2203, and 10 CFR 50.72(b)(2)(xi) (Ref. 49), as well as from reports issued in accordance with the
reporting criteria contained in NEI 07-07):
•

Provide a site map at sufficient scale to show the location of all monitoring wells and water
supply wells.

•

Include a table depicting well construction information, such as well depth, diameter, screened
interval, and construction material.

•

Include a table showing depths to water and water-level elevations.

•

Provide a groundwater flow direction map for each aquifer or hydrostratigraphic unit beneath the
site.

Rev. 2 of RG 4.2, Supplement 1, Page 42

•

Develop a table and accompanying map showing the distribution of radionuclide concentrations
across the site (e.g., tritium concentrations in picocuries per liter). A series of tables and maps,
based on available information, may be necessary to depict the concentration at depth.

•

For documented inadvertent releases of radionuclides into groundwater, include a description of
any ongoing or completed remediation actions and the residual activity remaining after the
remediation was completed, if it is not ongoing.

For those nuclear power plants that rely on a system other than a groundwater monitoring system
composed of wells, the applicant should describe the program used for detecting and responding to
inadvertent releases of radionuclides into subsurface soils and groundwater.
4.6

Ecological Resources

The following general approach should be used in conducting plant-specific assessments for
ecological resources-related Category 2 issues.
4.6.1

General Approach for Information and Analysis Content for All Ecological Issues

The applicant should provide sufficient information in the ER to evaluate how the effects of
nuclear power plant operation would affect ecosystem structure and function, alter the stability of plant or
animal populations, modify the value or availability of ecosystem services, or noticeably affect other
attributes of the ecological environment. Ecosystem services refer to a wide range of conditions and
processes through which natural ecosystems, and the species that are part of them, help sustain and fulfill
human life. For further discussion of these services, see the 1997 article by Daily et al., “Ecosystem
Services: Benefits Supplied to Human Societies by Natural Ecosystems” (Ref. 50).
For all ecological issues, the same general approach can identify the environmental impacts of
license renewal and alternatives. This approach generally follows the EPA’s 1998 framework for
ecological risk assessment in “Guidelines for Ecological Risk Assessment” (Ref. 51).
1. Identify Relevant Sources of Information
Identify the relevant sources of information, which may include:
Studies and monitoring. Summarize any surveys, studies, and monitoring that provide sitespecific, local, or regional data on ecological resources and that are relevant to assessing the
environmental impacts of license renewal and alternatives. Include the biological entities or ecological
attributes chosen for investigation, methodology, results, and conclusions.
If data are more than 5 years old, explain whether the studies are relevant in assessing the impacts
of license renewal. For example, show that both the potentially affected resources and the effects of the
nuclear power plant on those resources have remained, and can be expected to remain, unchanged or
similar over the license renewal term.
Communications with and views of relevant regulatory agencies. Document any communications
with Federal and State agencies with special expertise or jurisdiction (e.g., EPA or other water quality
permitting agencies concerning impingement and entrainment and thermal impacts; U.S. Fish and
Wildlife Service and National Marine Fisheries Service concerning federally listed species and critical
habitats; State natural resource agencies) that are relevant to assessing impacts and are not documented
elsewhere. Include the views of affected Indian Tribes in cases where culturally significant ecological

Rev. 2 of RG 4.2, Supplement 1, Page 43

resources may be affected. Discuss major points of view and significant concerns or objections raised by
these entities. If relevant communications are documented elsewhere, refer the reader to the appropriate
sections. Include other interested stakeholders, as appropriate.
Other sources. Provide in-text citations to other sources of information relied upon and provide
full citations in a literature cited section.
2. Identify Potentially Affected Ecological Resources
Identify specific ecological resources and the attributes of those resources potentially at risk.
Because ecological systems are complicated, only a subset of resources can be addressed.
Identify the potentially affected ecological resources. Describe the potentially affected resources
in terms of ecosystem or habitat type (e.g., oak-hickory forest, tallgrass prairie, tidal salt marsh). Give
special attention to important habitats (e.g., important bird areas, known bat hibernacula, spawning and
rearing areas, locally significant habitats, natural heritage areas, wildlife sanctuaries and preserves,
federally or State-managed lands and waters).
Describe the potentially affected plants and animals in terms of functional groups (e.g., plants,
mammals, reptiles, fish, invertebrates) or trophic structure (e.g., producers and consumers). For instance,
an aquatic system may include plankton, macrophytes, and periphyton (primary producers); zooplankton
and benthic macroinvertebrates (primary consumers); and bottom feeding, planktivorous, and piscivorous
fish (secondary and tertiary consumers).
For federally protected ecological resources, identify and describe the potentially affected
federally listed species and designated critical habitats protected under the ESA. Include candidate and
proposed species and proposed critical habitats, if applicable. Identify and describe EFH, including
HAPCs, by federally managed species and life stage, protected under the MSA. Identify and describe any
national marine sanctuaries and the living and nonliving resources of those sanctuaries protected under
the NMSA.
Identify attributes of those resources potentially at risk. Identify the attributes of the resources of
concern that are potentially at risk and that are important to protect (Ref. 51). If adverse effects on a
species, habitat, or other ecological resource are possible, the resource should be assessed in terms of
spatial scale (e.g., local, regional, or national), temporal scale (e.g., the time frame over which stressors or
effects will be evaluated), and resource value (e.g., social, economic, or ecological).
Biodiversity, which refers to the variety of life on Earth at all its levels, including genes,
individuals, species, habitats, and ecosystems, is an important attribute to consider. Biodiversity helps
maintain the structural diversity and functional integrity of ecosystems and provides a wide pool of
biological resources that can respond and adapt to various natural and human-made stressors (Ref. 52).
3. Explain the Relationships between Nuclear Power Plant Operation and Ecological Resource
Attributes
Relationships can be examined by identifying the pathways through which potential stressors act
on the chosen ecological receptors and expressing these as a risk hypotheses (Ref. 50, Section 3.4.1). Risk
hypotheses may be very simple, predicting the potential effect of one stressor on one receptor, or
extremely complex.

Rev. 2 of RG 4.2, Supplement 1, Page 44

4. Assess and Characterize Potential Impacts
For each potential stressor, multiple ecological receptors may exist, and each receptor may have
multiple measurable and susceptible attributes. The effects of nuclear power plant operation on any
ecological receptor may be direct or indirect and may vary in spatial or temporal scale. Additionally, the
assessment approach may be prospective or retrospective depending on the available data. With such
complexity, examining a single line of evidence may not be sufficient to assess a given impact. In such
cases, the reviewer should examine several lines of evidence involving several ecological receptors when
data allow. If using multiple lines of evidence, explain the qualitative or quantitative method for
combining the lines of evidence to arrive at an overall assessment of impact. A typical approach for
accomplishing this is to consider weight of evidence (e.g., [Ref. 51], [Ref. 53]).
5. Describe Mitigation Measures
If adverse impacts are identified, describe mitigation measures that have been implemented at the
nuclear power plant to reduce such impacts and note whether such measures would continue during the
license renewal term. Describe any additional mitigation measures proposed by the applicant or measures
that would be required in the future (e.g., conditions anticipated in a future renewed NPDES permit
concerning best technology available to minimize impingement mortality and entrainment). Evaluate the
expected effects of the mitigation measures. Briefly explain the rationale for not implementing any
measures that were considered but rejected.
6. Describe New and Significant Information
If any new and significant information exists concerning an ecological resource issue, discuss the
new information in the impact analysis and explain how it may affect conclusions in the LR GEIS.
4.6.2

Terrestrial Resources
The following ecological resources-related Category 2 issues require a plant-specific assessment.

Non-Cooling System Impacts on Terrestrial Resources
This issue concerns the effects of nuclear power plant operations on terrestrial resources during
an initial LR or SLR term that are unrelated to operation of the cooling system. Such activities include
landscape and grounds maintenance, stormwater management, elevated noise levels and vibration, and
ground-disturbing activities.
Table B-1 states the following:
The magnitude of effects of continued nuclear power plant operation and refurbishment,
unrelated to operation of the cooling system, would depend on numerous site-specific
factors, including ecological setting, planned activities during the license renewal term,
and characteristics of the plants and animals present in the area. Application of best
management practices and other conservation initiatives would reduce the potential for
impacts.
Specifically, 10 CFR 51.53(c)(3)(ii)(E) requires, in part, the following:

Rev. 2 of RG 4.2, Supplement 1, Page 45

All license renewal applicants shall assess the impact of refurbishment, continued
operations, and other license-renewal-related construction activities on important plant
and animal habitats.
Section 4.6.1.1.1 of the LR GEIS discusses non-cooling system impacts on terrestrial resources.
This Category 2 issue applies to all nuclear power plants. Each applicant should provide the information
and analysis described below.
Information and Analysis Content
The ER format should follow the general approach described in RG Section 4.6.1 for all
ecological resource issues. Specific information and analysis relevant to this issue is as follows.
Describe any known and reasonably foreseeable activities associated with license renewal
unrelated to operation of the cooling system that could affect terrestrial resources. Such activities include
landscape and grounds maintenance, stormwater management, elevated noise levels and vibration, and
ground-disturbing activities. Ground-disturbing activities may be related to refurbishment or other
planned activities during the license renewal period that involve demolition or construction.
Describe the following, with a focus on the interfaces with the terrestrial environment and how
site procedures, permits, and other controls minimize or mitigate impacts on the terrestrial environment.
•

Summarize the site and landscape maintenance activities. Identify site procedures and permits
related to the impacts of these activities on terrestrial resources.

•

Summarize stormwater management on the site, including any stormwater management plans and
NPDES permit conditions related to the impacts of stormwater on terrestrial resources.

•

Summarize any elevated noise or vibration levels that would be of particular concern for
terrestrial resources, such as those that could disrupt wildlife behavioral patterns or cause animals
to avoid certain areas.

•

Describe general operations and maintenance activities during the license renewal period that
could affect terrestrial resources, such as maintenance or repair of existing buildings, roadways,
parking lots, piping, fencing, and security-related structures.

•

Describe ground-disturbing activities anticipated during the license renewal period that would
disturb terrestrial habitat. Include the amount of land to be disturbed, whether disturbance would
be temporary or permanent, the ecological characteristics of the habitat, the species found within
the area, and any unique or rare features of the habitat or species found within it. Include
terrestrial habitat that would be disturbed by transport or delivery of equipment and supplies as
well as laydown or storage of materials, structures, and components. Describe any related road,
bridge, rail, or barge slip modifications that would occur that would affect terrestrial habitat.

Discuss relevant regional, State, and Federal permits and controls not already described that
would reduce or mitigate non-cooling system impacts on terrestrial resources.
Describe site or fleet-wide environmental procedures, wildlife management plans, best
management practices, and conservation initiatives undertaken or proposed by the applicant that would
benefit the terrestrial environment or otherwise mitigate non-cooling system impacts on terrestrial
resources.
Rev. 2 of RG 4.2, Supplement 1, Page 46

Water Use Conflicts with Terrestrial Resources (Plants with Cooling Ponds or Cooling Towers
Using Makeup Water from a River)
This issue concerns water use conflicts that may arise at nuclear power plants with cooling ponds
or cooling towers that use makeup water from a river and how those conflicts could affect terrestrial
resources during an initial LR or SLR term.
Table B-1 states the following:
Nuclear power plants could consume water at rates that cause occasional or intermittent
water use conflicts with nearby and downstream terrestrial and riparian communities.
Such impacts could noticeably affect riparian or wetland species or alter characteristics of
the ecological environment during the license renewal term. The one plant where impacts
have occurred successfully mitigated the impact. Impacts are expected to be small at most
nuclear power plants but could be moderate at some.
Specifically, 10 CFR 51.53(c)(3)(ii)(A) requires, in part, the following:
If the applicant’s plant utilizes cooling towers or cooling ponds and withdraws makeup
water from a river, an assessment of the impact of the proposed action on water
availability and competing water demands, the flow of the river, and related impacts
on…riparian (terrestrial) ecological communities must be provided.
Section 4.6.1.1.6 of the LR GEIS discusses water use conflicts with terrestrial resources. This
Category 2 issue applies to nuclear power plants with cooling ponds or cooling towers that withdraw
makeup water from a river. Notably, this issue also applies to nuclear power plants with hybrid cooling
systems that withdraw makeup water from a river (i.e., once-through cooling systems with helper cooling
towers) (e.g., Ref. 54). Applicants that meet these conditions should provide the information and analysis
described below. All other applicants should note in the ER that this issue is not relevant; these applicants
need not provide additional information.
Information and Analysis Content
The ER format should follow the general approach described in RG Section 4.6.1 for all
ecological resource issues. Specific information and analysis relevant to this issue is as follows.
Describe the following, with a focus on the interfaces with the terrestrial environment and how
site procedures, permits, and other controls minimize or mitigate impacts on the terrestrial environment.
Give special attention to riparian, wetland, and marsh habitats that require regular or periodic surface
water flow.
•

Summarize the baseline hydrologic regime of the affected surface waters, including seasonal
fluctuations in flow, and conditions that could lead to extreme periods of low flow.

•

Summarize current and anticipated consumptive water use by the nuclear power plant.

•

Identify other users relying on the affected surface waters, including downstream municipal,
agricultural, or industrial users, with which the nuclear power plant may compete.

•

Identify terrestrial habitats and species that would be especially sensitive to reduced water
availability (e.g., riparian, wetland, marsh, and other habitats that require saturation or periodic

Rev. 2 of RG 4.2, Supplement 1, Page 47

inundation; amphibians, especially early life stages; wildlife that heavily rely on surface waters,
such as beaver [Castor canadensis], muskrat [Ondatra zibethicus], and wading birds).
•

Discuss regional, State, Federal, and Indian Tribes’ permits and controls concerning water use
and any agreements with water resources control boards.

•

Summarize any other current or proposed practices and measures to control or limit operational
water use impacts.

•

Describe past water use conflicts with terrestrial resources, if any, and evaluate whether such
conflicts would be likely to arise again during the license renewal term.

Refer to the ER analysis of water use conflicts with surface water resources, to the extent that it is
appropriate, to avoid duplication of information.
4.6.3

Aquatic Resources
The following ecological resources-related Category 2 issues require a plant-specific assessment.

Impingement Mortality and Entrainment of Aquatic Organisms (Plants with Once-Through
Cooling Systems or Cooling Ponds)
This issue pertains to impingement mortality and entrainment of finfish and shellfish at nuclear
power plants with once-through cooling systems and cooling ponds during an initial LR or SLR term.
This includes plants with helper cooling towers that are seasonally operated to reduce thermal load to the
receiving waterbody, reduce entrainment during peak spawning periods, or reduce consumptive water use
during periods of low river flow.
Table B-1 states the following:
The impacts of impingement mortality and entrainment would generally be small at
nuclear power plants with once-through cooling systems or cooling ponds that have
implemented best technology requirements for existing facilities under Clean Water Act
(CWA) Section 316(b). For all other plants, impacts could be small, moderate, or large
depending on characteristics of the cooling water intake system, results of impingement
and entrainment studies performed at the plant, trends in local fish and shellfish
populations, and implementation of mitigation measures.
Specifically, 10 CFR 51.53(c)(3)(ii)(B) requires, in part, the following:
If the applicant’s plant utilizes once-through cooling or cooling pond water intake and
discharge systems, the applicant shall provide a copy of current Clean Water Act 316(b)
Best Technology Available determinations…or equivalent State permits and supporting
documentation. If the applicant cannot provide these documents, it shall assess the impact
of the proposed action on fish and shellfish resources resulting from impingement
mortality and entrainment…
Section 4.6.1.2.1 of the LR GEIS discusses impingement mortality and entrainment of aquatic
organisms. This Category 2 issue applies to nuclear power plants with once-through cooling systems or
cooling ponds, including plants with hybrid cooling systems (i.e., once-through cooling systems with
helper cooling towers). Applicants that meet these conditions should provide the information and analysis

Rev. 2 of RG 4.2, Supplement 1, Page 48

described below. All other applicants should note in the ER that this issue is not relevant; these applicants
need not provide additional information.
Information and Analysis Content
The ER format should follow the general approach described in RG Section 4.6.1 for all
ecological resource issues. Specific information and analysis relevant to this issue is as follows.
Describe impingement and entrainment studies conducted at the nuclear power plant and any
supporting studies and data. Include species and taxa chosen for investigation, methodology, results, and
conclusions. Provide estimates of the species and number of organisms impinged and entrained on a
daily, monthly, and annual basis. Provide estimates of finfish and shellfish mortality associated with
impingement. Describe impingement and entrainment losses in terms of lost commercial, recreational,
and ecosystem service value. If data are more than 5 years old, explain whether the studies are relevant in
assessing the impacts of license renewal. Provide full documentation of analytical or modeling techniques
used to assess effects.
Describe baseline studies and other ecological sampling conducted at or near the nuclear power
plant conducted to characterize the composition of aquatic populations or monitor their health over time.
Identify temporal and geographical trends in the data that might indicate whether fish and shellfish
populations have increased, decreased, or remained stable during nuclear power plant operation. Explain
any relationships between patterns of impingement and entrainment at the nuclear power plant and trends
in the affected populations.
Summarize the nuclear power plant’s current NPDES permit and the status of the permitting
authority’s best technology available (BTA) determinations.
•

If the NPDES permitting authority has made BTA determinations for the nuclear power plant
pursuant to CWA Section 316(b) in accordance with the current regulations at 40 CFR Part 122
(Ref. 55) and 40 CFR Part 125 (Ref. 56), which were promulgated in 2014 (79 FR 48300)
(Ref. 57), and the plant has implemented any associated requirements or those requirements
would be implemented before the license renewal period, no additional analysis is required. In
such cases, provide with the ER copies of the NPDES permit, CWA Section 316(b) BTA
determinations, studies and information submitted to the NPDES permitting agency pursuant to
40 CFR 122.21(r), and relevant correspondence with the permitting agency. In cases where the
NPDES permit has expired but has been administratively continued by the permitting authority
because of timely renewal application submission (i.e., at least 180 days before the permit
expiration date), provide a copy of the permit renewal application. If certain requirements
associated with the CWA 316(b) determination have yet to be implemented, provide a timeline
for such implementation.

•

If the NPDES permitting authority has not made BTA determinations, analyze the potential
impacts of impingement mortality, entrainment, or both using a weight-of-evidence approach. In
this approach, consider multiple lines of evidence to assess the presence or absence of ecological
impairment (i.e., noticeable or detectable impact) on the aquatic environment. For instance, as its
lines of evidence, the ER might consider characteristics of the cooling water intake system
design, the results of impingement and entrainment studies performed at the facility, and trends in
fish and shellfish population abundance indices. The ER should then consider these lines of
evidence together to predict the level of impact that the aquatic environment is likely to
experience over the course of the license renewal term. In support of this assessment, the
applicant should provide with the ER copies of the NPDES permit, NPDES permit renewal
Rev. 2 of RG 4.2, Supplement 1, Page 49

application (if applicable), studies and information submitted to the NPDES permitting agency
pursuant to 40 CFR 122.21(r), and relevant correspondence with the permitting agency.
The impingement mortality and entrainment analysis should also consider
•

location of the cooling water intake structure, intake velocities, and withdrawal volumes

•

information on screening device technologies and fish collection and return technologies

•

swimming abilities of local species or their surrogates, including burst, prolonged, or sustained
speeds

•

other relevant life history characteristics of local species, such as size and susceptibility to
impingement or entrainment at various life stages; population abundances and distributions;
special species statuses and designations; and regional management objectives

•

physical or biological factors that might concentrate or attract organisms to the area of the intake

Effects of Thermal Effluents on Aquatic Organisms (Plants with Once-Through Cooling Systems or
Cooling Ponds)
This issue pertains to acute, sublethal, and community-level effects of thermal effluents on finfish
and shellfish from operation of nuclear power plants with once-through cooling systems and cooling
ponds during an initial LR or SLR term. This includes plants with helper cooling towers that are
seasonally operated to reduce thermal load to the receiving waterbody, reduce entrainment during peak
spawning periods, or reduce consumptive water use during periods of low river flow.
Table B-1 states the following:
Acute, sublethal, and community-level effects of thermal effluents on aquatic organisms
would generally be small at nuclear power plants with once-through cooling systems or
cooling ponds that adhere to State water quality criteria or that have and maintain a valid
CWA Section 316(a) variance. For all other plants, impacts could be small, moderate, or
large depending on site-specific factors, including ecological setting of the plant;
characteristics of the cooling system and effluent discharges; and characteristics of the
fish, shellfish, and other aquatic organisms present in the area.
Specifically, 10 CFR 51.53(c)(3)(ii)(B) requires, in part, the following:
If the applicant’s plant utilizes once-through cooling or cooling pond water intake and
discharge systems, the applicant shall provide a copy of…if applicable, a 316(a) variance
in accordance with 40 CFR Part 125, or equivalent State permits and supporting
documentation. If the applicant cannot provide these documents, it shall assess the impact
of the proposed action on fish and shellfish resources resulting from…thermal discharges.
Section 4.6.1.2.4 of the LR GEIS discusses the effects of thermal effluents on aquatic organisms.
This Category 2 issue applies to nuclear power plants with once-through cooling systems or cooling
ponds, including plants with hybrid cooling systems (i.e., once-through cooling systems with helper
cooling towers). Applicants that meet these conditions should provide the information and analysis
described below. All other applicants should note in the ER that this issue is not relevant; these applicants
need not provide additional information.
Rev. 2 of RG 4.2, Supplement 1, Page 50

Information and Analysis Content
The ER format should follow the general approach described in RG Section 4.6.1 for all
ecological resource issues. Specific information and analysis relevant to this issue is as follows.
Describe thermal studies conducted at the nuclear power plant and any supporting studies and
data. Include species and taxa chosen for investigation, methodology, results, and conclusions. Provide
estimates of the species and number of organisms affected by the thermal effluent on a daily, monthly,
and annual basis. Provide areal or volumetric estimates of thermally affected aquatic habitat. Describe
effects in terms of lost commercial, recreational, and ecosystem service value. If data are more than
five years old, explain whether the studies are relevant in assessing the impacts of license renewal.
Provide full documentation of analytical or modeling techniques used to assess effects.
Describe baseline studies and other ecological sampling conducted at or near the nuclear power
plant conducted to characterize the composition of aquatic populations or monitor their health over time.
Identify temporal and geographical trends in the data that might indicate whether fish and shellfish
populations have increased, decreased, or remained stable during nuclear power plant operation. Explain
any relationships between thermal effluent discharges at the nuclear power plant and trends in the affected
populations.
Summarize the nuclear power plant’s current NPDES permit and the status of the permitting
authority’s CWA Section 316(a) determination.
•

If the NPDES permitting authority has made a determination under CWA Section 316(a) that
thermal effluent limits are sufficiently stringent to assure the protection and propagation of a
balanced, indigenous population of shellfish, fish, and wildlife in and on the receiving body of
water, and the nuclear power plant has implemented any associated requirements, no additional
analysis is required. In such cases, provide with the ER copies of the NPDES permit, CWA
Section 316(a) determination, CWA Section 316(a) demonstration studies and other information
submitted to the NPDES permitting authority pursuant to CWA 316(a), and relevant
correspondence with the permitting agency. In cases where the NPDES permit has expired but
has been administratively continued by the permitting authority because of timely renewal
application submission (i.e., at least 180 days before the permit expiration date), provide a copy
of the permit renewal application. If certain requirements associated with the CWA 316(a)
determination have yet to be implemented, provide a timeline for such implementation.

•

If the NPDES permitting authority has not granted a CWA Section 316(a) variance, analyze the
potential impacts of thermal discharges using a weight-of-evidence approach. In this approach,
consider multiple lines of evidence to assess the presence or absence of ecological impairment
(i.e., noticeable or detectable impact) on the aquatic environment. For instance, as its lines of
evidence, the ER might consider characteristics of the cooling water discharge system design, the
results of thermal studies performed at the facility, and trends in fish and shellfish population
abundance indices. The ER should then consider these lines of evidence together to predict the
level of impact that the aquatic environment is likely to experience over the course of the license
renewal term. In support of this assessment, the applicant should provide with the ER copies of
the NPDES permit, NPDES permit renewal application (if applicable), CWA Section 316(a)
demonstration studies and other information submitted to the NPDES permitting authority
pursuant to CWA 316(a), and relevant correspondence with the permitting agency.

Rev. 2 of RG 4.2, Supplement 1, Page 51

The thermal impact analysis should also consider
•

thermal plume characteristics, such as areal extent of the plume and thermal contour maps

•

thermal tolerances of local species or their surrogates

•

other relevant life history characteristics of local species, such as seasonal absence or presence,
population abundances and distributions, special species statuses and designations, and regional
management objectives

•

data on fish kill events related to nuclear power plant operation

•

physical or biological factors that might concentrate or attract organisms to the thermal plume

Water Use Conflicts with Aquatic Resources (Plants with Cooling Ponds or Cooling Towers Using
Makeup Water from a River)
This issue concerns water use conflicts that may arise at nuclear power plants with cooling ponds
or cooling towers that use makeup water from a river and how those conflicts could affect aquatic
resources during an initial LR or SLR term.
Table B-1 states the following:
Nuclear power plants could consume water at rates that cause occasional or intermittent
water use conflicts with nearby and downstream aquatic communities. Such impacts
could noticeably affect aquatic plants or animals or alter characteristics of the ecological
environment during the license renewal term. The one plant where impacts have occurred
successfully mitigated the impact. Impacts are expected to be small at most nuclear
power plants but could be moderate at some.
Specifically, 10 CFR 51.53(c)(3)(ii)(A) requires, in part, the following:
If the applicant’s plant utilizes cooling towers or cooling ponds and withdraws makeup
water from a river, an assessment of the impact of the proposed action on water
availability and competing water demands, the flow of the river, and related impacts on
stream (aquatic)…ecological communities must be provided.
Section 4.6.1.2.10 of the LR GEIS discusses water use conflicts with aquatic resources. This
Category 2 issue applies to nuclear power plants with cooling ponds or cooling towers that withdraw
makeup water from a river. Notably, this issue also applies to nuclear power plants with hybrid cooling
systems that withdraw makeup water from a river (i.e., once-through cooling systems with helper cooling
towers) (e.g., Ref. 54). Applicants that meet these conditions should provide the information and analysis
described below. All other applicants should note in the ER that this issue is not relevant; these applicants
need not provide additional information.
Information and Analysis Content
The ER format should follow the general approach described in RG Section 4.6.1 for all
ecological resource issues. Specific information and analysis relevant to this issue is as follows.

Rev. 2 of RG 4.2, Supplement 1, Page 52

Describe the following, with a focus on the interfaces with the aquatic environment and how site
procedures, permits, and other controls minimize or mitigate impacts on the terrestrial environment.
•

Summarize the baseline hydrologic regime of the affected surface waters, including seasonal
fluctuations in flow, and conditions that could lead to extreme periods of low flow.

•

Summarize current and anticipated consumptive water use by the nuclear power plant.

•

Identify other users relying on the affected surface waters, including downstream municipal,
agricultural, or industrial users, with which the nuclear power plant may compete.

•

Identify aquatic habitats and species that would be especially sensitive to reduced water
availability (e.g., nearshore habitat, aquatic plants, early life stages of fish and shellfish, species
that rely on specific microhabitats that may not be available under low flow conditions).

•

Discuss regional, State, Federal, and Indian Tribes’ permits and controls concerning water use
and any agreements with water resources control boards.

•

Summarize any other current or proposed practices and measures to control or limit operational
water-use impacts.

•

Describe past water use conflicts with aquatic resources, if any, and evaluate whether such
conflicts would be likely to arise again during the license renewal term.

Refer to the ER analyses of water use conflicts with surface water resources and terrestrial
resources, to the extent that these are appropriate, to avoid duplication of information.
4.6.4

Federally Protected Ecological Resources
The following ecological resources-related Category 2 issues require a plant-specific assessment.

Endangered Species Act: Federally Listed Species and Critical Habitats Under U.S. Fish and
Wildlife Service Jurisdiction
This issue concerns the potential effects of continued nuclear power plant operation during an
initial LR or SLR term on federally listed species and critical habitats protected under the ESA and under
the jurisdiction of the U.S. Fish and Wildlife Service.
Table B-1 states the following:
The potential effects of continued nuclear power plant operation and refurbishment on
federally listed species and critical habitats would depend on numerous site-specific
factors, including the ecological setting; listed species and critical habitats present in the
action area; and plant-specific factors related to operations, including water withdrawal,
effluent discharges, and other ground-disturbing activities. Consultation with the U.S.
Fish and Wildlife Service under Endangered Species Act Section 7(a)(2) would be
required if license renewal may affect listed species or critical habitats under this
agency's jurisdiction.

Rev. 2 of RG 4.2, Supplement 1, Page 53

Specifically, 10 CFR 51.53(c)(3)(ii)(E) requires the following:
All license renewal applicants shall assess the impact of refurbishment, continued
operations, and other license-renewal-related construction activities on important plant
and animal habitats. Additionally, the applicant shall assess the impact of the proposed
action on federally protected ecological resources in accordance with Federal laws
protecting such resources, including but not limited to, the Endangered Species Act, the
Magnuson-Stevens Fishery Conservation and Management Act, and the National Marine
Sanctuaries Act.
Section 4.6.1.3.1 of the LR GEIS discusses federally listed species and critical habitats under U.S.
Fish and Wildlife Service jurisdiction. This Category 2 issue applies to all nuclear power plants whose
operation may affect federally listed terrestrial and freshwater species or their critical habitat. Listed
species under U.S. Fish and Wildlife Service jurisdiction are likely to occur near most operating nuclear
power plants. Applicants that meet these conditions should provide the information and analysis
described below. All other applicants should note in the ER that this issue is not relevant; these applicants
need not provide additional information.
Information and Analysis Content
The ER format should follow the general approach described in RG Section 4.6.1 for all
ecological resource issues. Specific information and analysis relevant to this issue is as follows. Notably,
in addition to analyzing the impacts of this issue, the ER should contain sufficient information to support
the NRC staff’s interagency consultation with the U.S. Fish and Wildlife Service.
Analyze the potential effects of license renewal on each federally listed species and designated
critical habitat determined in Chapter 3 of this RG to be potentially present in the action area. Consistent
with the suggested contents of a biological assessment at 50 CFR 402.12(f), consider including the
following information, as applicable:
•

the results of site surveys, studies, and inspections of the action area to determine if listed or
proposed species are present or occur seasonally

•

the views of recognized experts on the species at issue

•

a review of pertinent scientific literature and related information

•

an analysis of the effects of the action on the species and habitat, including cumulative effects,
and the results of any related studies

•

an analysis of alternate actions

Rev. 2 of RG 4.2, Supplement 1, Page 54

If formal consultation 13 may be required, provide the following information in accordance with
50 CFR 402.14(c):
•

a description of the proposed action and any mitigation measures in sufficient detail to assess the
effects of the action on protected species and critical habitat, including the following:
–

the purpose, duration, timing, and location of the action

–

the specific components of the action and how they will be carried out

–

maps, drawings, blueprints, or similar schematics of the action

–

any other available information related to the nature and scope of the proposed action
relevant to its effects on protected species or critical habitat

•

a map or description of the action area

•

available information on the presence, abundance, density, or periodic occurrence of listed
species and the condition and location of the species’ habitat, including any critical habitat

•

a description of the effects of the action and an analysis of any cumulative effects

•

a summary of any relevant information provided by the applicant or licensee

•

any other relevant available information on the effects of the proposed action, including any EISs,
EAs, or other relevant reports

Report findings in accordance with terminology used in the ESA and its implementing
regulations as identified in Table 4-1. Make individual effect determinations for each listed species and
critical habitat; the number of ESA findings for a given license renewal will depend on the number of
listed species and critical habitats present in the action area.
Table 4-1. Possible ESA Effect Determinations Made by the Federal Action Agency
Listed Species

Proposed Species

“may affect and is likely to
adversely affect”

“may affect and is likely to
adversely affect”

Designated or Proposed
Critical Habitat
“is likely to destroy or adversely
modify”

“may affect but is not likely to
adversely affect”

“may affect but is not likely to
adversely affect”

“is not likely to destroy or
adversely modify”

“no effect”

“no effect”

“no effect”

Applicants are strongly encouraged to coordinate with the U.S. Fish and Wildlife Service on this
issue during preparation of the ER, especially for those license renewals that may require formal
consultation. Include copies of any relevant correspondence in the ER and give special consideration to
the Service’s views when making ESA effect determinations.
13

Formal ESA Section 7 consultation is appropriate when a Federal agency determines that an action “may affect
and is likely to adversely affect” listed species or critical habitats. For any action in which take of listed species or
destruction or adverse modification of critical habitat may occur, formal consultation is required. See
Section 4.6.1.3.1 of the GEIS and Section 4.10.11 of the ESRP for more information on this topic.
Rev. 2 of RG 4.2, Supplement 1, Page 55

Endangered Species Act: Federally Listed Species and Critical Habitats Under National Marine
Fisheries Service Jurisdiction
This issue concerns the potential effects of continued nuclear power plant operation during an
initial LR or SLR term on federally listed species and critical habitats protected under the ESA and under
the jurisdiction of the National Marine Fisheries Service.
Table B-1 states the following:
The potential effects of continued nuclear power plant operation and refurbishment on
federally listed species and critical habitats would depend on numerous site-specific
factors, including the ecological setting; listed species and critical habitats present in
the action area; and plant-specific factors related to operations, including water
withdrawal, effluent discharges, and other ground-disturbing activities. Consultation
with the National Marine Fisheries Service under Endangered Species Act
Section 7(a)(2) would be required if license renewal may affect listed species or critical
habitats under this agency's jurisdiction.
Specifically, 10 CFR 51.53(c)(3)(ii)(E) requires the following:
All license renewal applicants shall assess the impact of refurbishment, continued
operations, and other license-renewal-related construction activities on important plant
and animal habitats. Additionally, the applicant shall assess the impact of the proposed
action on federally protected ecological resources in accordance with Federal laws
protecting such resources, including but not limited to, the Endangered Species Act, the
Magnuson-Stevens Fishery Conservation and Management Act, and the National
Marine Sanctuaries Act.
Section 4.6.1.3.2 of the LR GEIS discusses federally listed species and critical habitats under
National Marine Fisheries Service jurisdiction. This Category 2 issue applies to all nuclear power plants
whose operation may affect federally listed marine and anadromous species or their critical habitat. In
general, listed species and critical habitats under National Marine Fisheries Service jurisdiction are only
of concern at nuclear power plants that withdraw or discharge from estuarine or marine waters. However,
anadromous listed species under National Marine Fisheries Service jurisdiction may be seasonally present
in the action area of plants located within freshwater reaches of rivers well upstream of the saltwater
interface. Applicants that meet these conditions should provide the information and analysis described
below. All other applicants should note in the ER that this issue is not relevant; these applicants need not
provide additional information.
Information and Analysis Content
The ER format should follow the general approach described in RG Section 4.6.1 for all
ecological resource issues. Specific information and analysis relevant to this issue is as follows. Notably,
in addition to analyzing the impacts of this issue, the ER should contain sufficient information to support
the NRC staff’s interagency consultation with the National Marine Fisheries Service.
The recommended content for this issue is identical to the information and analysis content
identified above under the issue of “Endangered Species Act: Federally Listed Species and Critical
Habitats Under U.S. Fish and Wildlife Service Jurisdiction.”

Rev. 2 of RG 4.2, Supplement 1, Page 56

Applicants are strongly encouraged to coordinate with the National Marine Fisheries Service on
this issue during preparation of the ER, especially for those license renewals that may require formal
consultation. Include copies of any relevant correspondence in the ER and give special consideration to
the Service’s views when making ESA effect determinations.
Magnuson-Stevens Act: Essential Fish Habitat
This issue concerns the potential effects of continued nuclear power plant operation during an
initial LR or SLR term on EFH protected under the MSA.
Table B-1 states the following:
The potential effects of continued nuclear power plant operation and refurbishment on
essential fish habitat would depend on numerous site-specific factors, including the
ecological setting; essential fish habitat present in the area, including habitats of
particular concern; and plant-specific factors related to operations, including water
withdrawal, effluent discharges, and other activities that may affect aquatic habitats.
Consultation with the National Marine Fisheries Service under Magnuson-Stevens Act
Section 305(b) would be required if license renewal could result in adverse effects to
essential fish habitat.
Specifically, 10 CFR 51.53(c)(3)(ii)(E) requires the following:
All license renewal applicants shall assess the impact of refurbishment, continued
operations, and other license-renewal-related construction activities on important plant
and animal habitats. Additionally, the applicant shall assess the impact of the proposed
action on federally protected ecological resources in accordance with Federal laws
protecting such resources, including but not limited to, the Endangered Species Act, the
Magnuson-Stevens Fishery Conservation and Management Act, and the National
Marine Sanctuaries Act.
Section 4.6.1.3.3 of the LR GEIS discusses EFH. This Category 2 issue applies to all nuclear
power plants whose operation may affect EFH, including HAPCs. EFH may occur at nuclear power
plants located on or near estuaries, coastal inlets and bays, and the ocean. EFH is generally not relevant
for license renewal reviews of plants located on rivers well above the saltwater interface or confluence
with marine waters; plants located on freshwater lakes, including the Great Lakes; or at plants that draw
cooling water from human-made cooling ponds or canals that do not hydrologically connect to natural
surface waters. One exception is in cases where a plant draws cooling water from the freshwater portion
of a river that is inhabited by diadromous prey of federally managed species (herein referred to as “EFH
species”) with designated EFH downstream of the plant. Applicants that meet these conditions should
provide the information and analysis described below. All other applicants should note in the ER that this
issue is not relevant; these applicants need not provide additional information.
Information and Analysis Content
The ER format should follow the general approach described in RG Section 4.6.1 for all
ecological resource issues. Specific information and analysis relevant to this issue is as follows. Notably,
in addition to analyzing the impacts of this issue, the ER should contain sufficient information to support
the NRC staff’s interagency consultation with the National Marine Fisheries Service.

Rev. 2 of RG 4.2, Supplement 1, Page 57

Analyze the potential effects of license renewal on the EFH by species and life stage determined
in Chapter 3 of this RG to be present in the affected area. Consistent with the required contents of an EFH
assessment at 50 CFR 600.920(e)(2) (Ref. 58), include the following information:
•

a description of the action

•

an analysis of the potential adverse effects on EFH and EFH species

•

conclusions regarding the effects of the action on EFH

•

proposed mitigation, if applicable

•

If appropriate, the EFH assessment should also include the following (50 CFR 600.920(e)(4)):

•

the results of site surveys, studies, and inspections that evaluate the habitat and the site-specific
effects of the project

•

the views of recognized experts on the habitat or species that may be affected

•

a review of pertinent scientific literature and related information

•

an analysis of alternate actions

•

any other relevant information

Consider prey of EFH species in the analysis. For instance, if a given species with designated
EFH downstream of a nuclear power plant consumes diadromous fish that occur upriver of the facility,
effects of license renewal on those prey fish would be relevant to the analysis.
Report findings in accordance with terminology used in the MSA and its implementing
regulations as identified in Table 4-2. Make individual effect determinations for each EFH species and
life stage; the number of EFH findings for a given license renewal will depend on the number of EFH
species and life stages with EFH present in the action area. Importantly, EFH effect determinations
characterize the effects on the habitat of the EFH species and their life stages. They do not characterize
the effects on the species or the life stages themselves. Similarly, effect determinations for EFH prey
characterize the effects on the prey as a food resource rather than the effects on the prey species
themselves. For instance, a proposed action that involves water withdrawal from a river for cooling
purposes could cause habitat loss (i.e., temporary or permanent physical loss of a portion of the water
column). Associated effluent discharge could cause chemical or biological (i.e., temperature and
dissolved oxygen content) alterations to the habitat. With respect to prey species, water withdrawals could
impinge or entrain prey organisms, which would represent a reduction in available food resources for
EFH species within that habitat.

Rev. 2 of RG 4.2, Supplement 1, Page 58

Table 4-2. Possible EFH Effect Determinations Made by the Federal Action Agency
EFH Effect Determinations
“substantial adverse effects”
“more than minimal but less than
substantial adverse effects”
“minimal adverse effects”
“no adverse effects”

Spatial Extent

Duration

surface area, depth, and
seasonality described in writing
with explicit measurements, to
the extent possible, or pictorially
on a map

temporary v. permanent
short-term v. long-term

Give special attention to HAPCs. The Fishery Management Councils and National Marine
Fisheries Service identify HAPCs within designated EFH based on the importance of the habitat’s
ecological function; the extent to which the habitat is sensitive to human-induced environmental
degradation; whether, and to what extent, development activities are, or will be, stressing the habitat type;
and the rarity of the habitat type (50 CFR 600.815(a)(8)). If an HAPC is present, make separate effect
determinations for the EFH and the HAPC within that EFH. Actions that occur in HAPCs may receive
more scrutiny by the National Marine Fisheries Service during EFH consultation when developing
conservation recommendations.
Applicants are strongly encouraged to coordinate with the National Marine Fisheries Service on
this issue during preparation of the ER, especially for those license renewals that may require EFH
consultation. Include copies of any relevant correspondence in the ER and give special consideration to
the Service’s views when making EFH effect determinations.
National Marine Sanctuaries Act: Sanctuary Resources
This issue concerns the potential effects of continued nuclear power plant operation during an
initial LR or SLR term on sanctuary resources protected under the NMSA.
Table B-1 states the following:
The potential effects of continued nuclear power plant operation and refurbishment on
sanctuary resources would depend on numerous site-specific factors, including the
ecological setting; national marine sanctuaries present in the area, and plant-specific
factors related to operations, including water withdrawal, effluent discharges, and other
activities that may affect aquatic habitats. Consultation with the Office of National
Marine Sanctuaries under National Marine Sanctuaries Act Section 304(d) would be
required if license renewal could destroy, cause the loss of, or injure sanctuary
resources.
Specifically, 10 CFR 51.53(c)(3)(ii)(E) requires the following:
All license renewal applicants shall assess the impact of refurbishment, continued
operations, and other license-renewal-related construction activities on important plant
and animal habitats. Additionally, the applicant shall assess the impact of the proposed
action on federally protected ecological resources in accordance with Federal laws
protecting such resources, including but not limited to, the Endangered Species Act, the
Magnuson-Stevens Fishery Conservation and Management Act, and the National
Marine Sanctuaries Act.
Section 4.6.1.3.4 of the LR GEIS discusses sanctuary resources. This Category 2 issue applies to
all nuclear power plants whose operation may affect the resources of a national marine sanctuary.
Rev. 2 of RG 4.2, Supplement 1, Page 59

National marine sanctuaries occur in coastal and marine waters as well as within certain Great Lakes.
This issue is generally not relevant for license renewal reviews of plants located on rivers or freshwater
lakes or at plants that draw cooling water from human-made cooling ponds or canals that do not
hydrologically connect to natural surface waters. Applicants that meet these conditions should provide the
information and analysis described below. All other applicants should note in the ER that this issue is not
relevant; these applicants need not provide additional information.
Information and Analysis Content
The ER format should follow the general approach described in RG Section 4.6.1 for all
ecological resource issues. Specific information and analysis relevant to this issue is as follows. Notably,
in addition to analyzing the impacts of this issue, the ER should contain sufficient information to support
the NRC staff’s interagency consultation with the National Oceanic and Atmospheric Administration’s
Office of National Marine Sanctuaries.
Analyze the potential effects of license renewal on sanctuary resources of the national marine
sanctuary determined in Chapter 3 of this RG to be potentially present in the affected area. Consistent
with the Office of National Marine Sanctuaries’ “Overview of Conducting Consultation Pursuant to
Section 304(d) of the National Marine Sanctuaries Act” (Ref. 59), consider including the following
information, as applicable:
•

the purpose or objectives of the proposed action

•

the location of the action and any alternative locations

•

the methods and means for carrying out the action and any alternative methods available

•

the equipment proposed to be used and any alternative equipment

•

documentation that supports the determination of the likelihood of the action causing injury to
sanctuary resources

•

the results of site surveys, studies, and inspections that evaluate the affected area of the project

•

the views of recognized experts on the sanctuary resources that may be affected

•

a review of pertinent scientific literature and related information

•

an analysis of alternate actions considered

•

copies of any Federal, territory, State, local, or Indian Tribes’ authorizations, permits, licenses, or
other forms of approval (or applications for authorizations, permits, or licenses, if not yet granted)
required for the project or a summary of such approvals that have been sought

•

copies of pertinent reports, including, but not limited to, any EIS, environmental assessment, or
biological assessment prepared, and any other relevant information
Report findings in accordance with terminology used in the NMSA as identified in Table 4-3.

Rev. 2 of RG 4.2, Supplement 1, Page 60

Table 4-3. Possible NMSA Effect Determinations Made by the Federal Action Agency
NMSA Effect Determinations
“may affect and is likely to destroy, cause the loss of, or injure”
“may affect but is not likely to destroy, cause the loss of, or injure”
“no effect”

Notably, sanctuary resources can include historic resources in addition to ecological resources.
Thus, this analysis should be coordinated with the historic and cultural resource analysis if any historic
sanctuary resources are present, and the two analyses may be cross-referenced, as appropriate.
Applicants are strongly encouraged to coordinate with the Office of National Marine Sanctuaries
on this issue during preparation of the ER, especially for those license renewals that may require NMSA
consultation. Include copies of any relevant correspondence in the ER and give special consideration to
the Service’s views when making sanctuary resource effect determinations.
4.7

Historic and Cultural Resources
The following Category 2 issue requires a plant-specific assessment.

Historic and Cultural Resources
Table B-1 states the following:
Impacts from continued operations and refurbishment on historic and cultural resources
located onsite and in the transmission line ROW are analyzed on a plant-specific basis.
The NRC will perform a National Historic Preservation Act (NHPA) Section 106
review, in accordance with 36 CFR Part 800 which includes consultation with the State
and Tribal Historic Preservation Officer, Indian Tribes, and other interested parties.
Specifically, 10 CFR 51.53(c)(ii)(K) requires the following:
All applicants shall identify any potentially affected historic and cultural resources and
historic properties and assess whether future plant operations and any planned
refurbishment activities would affect these resources in accordance with Section 106 of
the National Historic Preservation Act and in the context of the National
Environmental Policy Act.
Section 4.7 of the LR GEIS discusses historic and cultural resources. Section 106 of the NHPA
requires that Federal agencies consider the effects of the agency’s undertaking (including issuance of a
license) on historic properties included in, or eligible for, the NRHP and, before approval of an
undertaking, give the Advisory Council on Historic Preservation a reasonable opportunity to comment on
the undertaking. The NHPA defines “undertakings” as any project or activity that is funded or under the
direct jurisdiction of a Federal agency, or any project or activity that requires a “Federal permit, license, or
approval.” The Advisory Council on Historic Preservation’s regulations at 36 CFR Part 800, “Protection
of Historic Properties,” set forth the procedures that define how Federal agencies meet Section 106
responsibilities.
The applicant should provide the information and analysis needed for the NRC to comply with
Section 106 requirements in a manner that minimizes the potential for delays in the environmental review.
The applicant should identify any activities and impacts associated with continued operations (including
maintenance activities) and any refurbishment activities that could affect historic properties within the
Rev. 2 of RG 4.2, Supplement 1, Page 61

direct and indirect APE. Applicants should involve and seek input from the SHPO, local historic
preservation officials, THPO, and Indian Tribes in the assessment and include letters that support these
interactions. The applicant should also consider the effects of continued nuclear plant operations and
refurbishment activities on historic and cultural resources that do not meet the criteria to be considered a
historic property under the NHPA, but could be considered by the SHPO, THPO, Indian Tribes, or local
historians to have local historic value and could contribute substantially to an area’s sense of historic
character.
Information and Analysis Content
The applicant should include the following information in the ER (with appropriate reference to
Chapter 3 of the ER to avoid duplication of information):
•

Identify any activities associated with continued operations, maintenance, and refurbishment that
could affect onsite or offsite historic and cultural resources located within the direct and indirect
APEs. Such activities include ground-disturbing activities (e.g., land clearing, grading,
excavating, road work), increases in traffic, and noise and visual intrusions.

•

Identify and assess effects to historic properties found in the direct and indirect APEs that may be
affected by the proposed undertaking (i.e., initial LR or SLR). Use the criteria specified in 36
CFR 800.5 to assess adverse effects on historic properties. Provide a basis and documentation for
how a conclusion is reached.

•

Identify and assess effects to historic and cultural resources that are not determined to be historic
properties but may be considered important in the context of NEPA (e.g., sacred sites, cemeteries,
local gathering areas).

•

Discuss the direct and indirect effects (e.g., ground disturbance, physical, visual, auditory,
atmospheric such as fugitive dust, light, and traffic), if any, from the proposed project, and from
any associated transmission lines on nearby historic properties or important historic and cultural
resources.
The assessment should lead to one of three conclusions for NHPA (see 36 CFR 800.4):

•

No historic properties present, the undertaking will have no effect to historic properties

•

Historic properties present, but the undertaking will have no adverse effect upon them

•

Historic properties present: the undertaking will have an adverse effect upon them (see 36 CFR
800.5)

If a qualified professional has recommended a “no historic properties present” determination,
then the applicant should provide supporting documentation in the ER.
If a qualified professional has recommended a finding of “no adverse effect to historic
properties,” the applicant should develop a plan that outlines protective measures to minimize or avoid
these effects. The applicant should engage the SHPO, THPO, Indian Tribes, and interested parties in the
formalization of these protection plans and document this within the ER.
If a qualified professional determines that adverse effects to historic properties could occur, the
applicant should engage with the SHPO, THPO, Indian Tribes, and interested parties and document this
Rev. 2 of RG 4.2, Supplement 1, Page 62

determination in the ER. The ER should describe any procedures and cultural resource management plans
developed by the applicant to protect historic and cultural resources as well as any measures to avoid,
minimize, or mitigate adverse effects. These procedures should also include steps to take in the event of
inadvertent discoveries, including the discovery of human remains.
The applicant should be aware that the NRC, as a Federal agency, is responsible for consulting
with the SHPO, THPO, Indian Tribes, and interested parties as part of the Section 106 compliance
process. If the NRC determines an adverse effect may occur, it will, in accordance with 36 CFR Part 800,
develop proposed measures in consultation with identified consulting parties that might avoid, minimize,
or mitigate such effects. Such measures, as appropriate, would be discussed in the NRC staff’s SEIS. The
applicant will have the responsibility for implementing the measures identified and agreed upon by the
consulting parties to avoid, minimize, or mitigate the effects.
For historic or cultural resources that do not meet the criteria to be considered a historic property
under the NHPA, the applicant should assess whether there are any potential significant impacts through
the NEPA process as a result of continued operations and provide documentation to support the
assessment in the ER.
4.8

Socioeconomics

Socioeconomic impacts are evaluated in the LR GEIS and are generic (the same or similar at all
plants) or Category 1. The applicant should discuss any new and significant information in the ER, if
applicable; otherwise, socioeconomic impacts do not need to be analyzed.
4.9

Human Health
The following human health-related Category 2 issues require a plant-specific assessment.

Microbiological Hazards to the Public
Table B-1 states the following about the public health effects of microbiological (thermophilic)
organisms:
These microorganisms are not expected to be a problem at most operating plants except
possibly at plants using cooling ponds, lakes, canals, or that discharge into waters of the
United States accessible by the public. Impacts would depend on site-specific
characteristics.
Specifically, 10 CFR 51.53(c)(3)(ii)(G) requires the following:
If the applicant’s plant uses a cooling pond, lake, canal, or discharges into waters of the
United States accessible to the public, an assessment of the impact of the proposed
action on public health from thermophilic organisms in the affected water must be
provided.
Section 4.9.1.1.3 of the LR GEIS discusses this issue. Nuclear plants that use cooling ponds,
lakes, canals, or that discharge into waters of the United States accessible to the public have a potential to
enhance the concentration of thermophilic microorganisms. Microbiological organisms of concern for
public and occupational health include enteric pathogens (bacteria that typically exist in the intestines of
animals and humans [e.g., Pseudomonas aeruginosa]), thermophilic fungi, bacteria (e.g., Legionella spp.
and Vibrio spp.), free-living amoebae (e.g., Naegleria fowleri and Acanthamoeba spp.), as well as

Rev. 2 of RG 4.2, Supplement 1, Page 63

organisms that produce toxins that affect human health (e.g., dinoflagellates [Karenia brevis] and bluegreen algae).
Information and Analysis Content
If the applicant can show that the nuclear plant does not use cooling ponds, lakes, canals and does
not discharge into waters of the United States accessible to the public, the ER should note this fact, and
further information or analysis need not be provided. If the plant does use cooling ponds, lakes, canals, or
discharges to waters of the United States accessible to the public, the applicant should provide the
following information in the ER:
•

If the State advises that tests should be conducted for concentration of N. fowleri or other
thermophilic microorganisms in the receiving waters, perform the tests when the facility has been
operating at a power level typical of the level anticipated during the license renewal period for at
least 1 month to ensure a steady-state population during the sampling. Collect samples at
locations of potential public use.

•

Assess the data collected to determine the magnitude of potential impacts of thermophilic
microorganisms on public health during the license renewal term.

•

Describe proposed mitigation measures to minimize the exposure to members of the public and
the rationale for not implementing any measures that were considered but rejected.

Electric Shock Hazards
Table B-1 states the following:
Electrical shock potential is of small significance for transmission lines that are
operated in adherence with the National Electrical Safety Code (NESC). Without a
review of conformance with NESC criteria of each nuclear power plant’s in-scope
transmission lines, it is not possible to determine the significance of the electrical shock
potential.
Specifically, 10 CFR 51.53(c)(3)(ii)(H) requires the following:
If the applicant’s transmission lines that were constructed for the specific purpose of
connecting the plant to the transmission system do not meet the recommendations of
the National Electrical Safety Code for preventing electric shock from induced
currents, an assessment of the impact of the proposed action on the potential shock
hazard from the transmission lines must be provided.
Section 4.9.1.1.5 of the LR GEIS discusses this issue, which concerns only the in-scope
transmission lines. Sections 3.1.1 and 3.1.6.5 of the LR GEIS specifically define which transmission lines
are considered in-scope with respect to license renewal environmental reviews. The issue of electric
shock potential is reviewed as part of the construction permit. Most transmission lines were designed to
comply with the NESC recommendations for electric shock hazard. However, unless the utility has had
an active program of transmission line management aimed at reviewing changes in land use in the ROW
and the operating characteristics of the transmission line, as well as ensuring compliance with changes in
the NESC, the line may not meet current NESC recommendations.

Rev. 2 of RG 4.2, Supplement 1, Page 64

Information and Analysis Content
If the in-scope transmission lines meet current NESC clearance standards, the discussion in the
ER should demonstrate that fact. The demonstration should take one of two forms, either (1) a calculation
that demonstrates adherence to the current NESC standard and a description of an ongoing program of
transmission line ROW supervision and management aimed at ensuring that current electrical shock
provisions of the NESC are met, or (2) a transmission line survey. The survey should consider the
transmission line characteristics, clearances, and human uses of the transmission corridor and describe
measures that could be taken to meet the standards, the measures the applicant plans or proposes to
undertake, and whether those measures will meet the standards. It should also consider basic electrical
design parameters, including transmission design voltage or voltages, line capacity, conductor type and
configuration, spacing between phases, minimum conductor clearances to ground, maximum predicted
electrical field strength(s) at 1 meter above ground, the predicted electrical field strength at the edge of the
ROW in kilovolts per meter, and the design bases for these values.
Pursuant to 10 CFR 51.53(c)(3)(iii), if any in-scope transmission lines do not meet current NESC
clearance standards, the applicant should describe the mitigating alternatives available for reducing any
adverse impacts. If applicable, the applicant should explain in detail the rationale for concluding that the
standards are not appropriate to the situation (such as other governing standards) or the rationale for not
making modifications to meet the standards.
Postulated Accidents
In the June 2013 Revisions to Environmental Review for Renewal of Nuclear Power Plant
Operating License, Final Rule (78 FR 37282) (Ref. 60), the Commission reaffirmed that a site-specific
consideration of severe accident mitigation alternatives (SAMAs) will be required at the time of license
renewal unless the applicant has previously performed a SAMA analysis for a given nuclear plant. If an
applicant has not previously performed a SAMA analysis for their plant, then refer to RG 4.2,
Supplement 1, Revision 1 (Ref. 61). In the revised LR GEIS (NUREG-1437, Revision 2), the NRC
reviewed postulated accidents including severe accidents and determined they are Category 1. Further
information regarding postulated accidents is provided in Chapter 5 of this RG.
4.10

Environmental Justice
The following Category 2 issue requires a plant-specific assessment.

Impacts on Minority Populations, Low-Income Populations, and Indian Tribes
Table B-1 states the following:
Impacts on minority populations, low-income populations, Indian Tribes, and
subsistence consumption resulting from continued operations and refurbishment
associated with license renewal will be addressed in plant-specific reviews.
Specifically, 10 CFR 51.53(c)(3)(ii)(N) requires the following:
Applicants shall provide information on the general demographic composition of
minority and low-income populations and communities (by race and ethnicity) and
Indian Tribes in the vicinity of the nuclear power plant that could be disproportionately
affected by license renewal, including continued reactor operations and refurbishment
activities.

Rev. 2 of RG 4.2, Supplement 1, Page 65

Section 4.10 of the LR GEIS discusses environmental justice. Executive Order 12898, “Federal
Actions To Address Environmental Justice in Minority Populations and Low-Income Populations,”
issued February 11, 1994 (Ref. 62), directs each Federal agency to “make achieving environmental
justice part of its mission by identifying and addressing, as appropriate, disproportionately high and
adverse human health or environmental effects of its programs, policies, and activities on minority
populations and low-income populations.” Independent agencies, including the NRC, are not required to
follow the terms of Executive Order 12898, but are “requested to comply with the provisions of [the]
order.” In a letter to the President, former NRC Chairman Ivan Selin pledged the NRC would “endeavor
to carry out the measures set forth in Executive Order 12898 … as part of NRC’s efforts to comply with
NEPA” (Ref. 63).
CEQ has oversight of the Federal government’s compliance with Executive Order 12898 and
NEPA. In consultation with EPA, the Environmental Justice Interagency Working Group, and other
affected agencies, CEQ developed guidance to further assist Federal agencies with their NEPA
procedures so that environmental justice concerns are effectively identified and addressed. On
December 10, 1997, CEQ issued “Environmental Justice: Guidance under the National Environmental
Policy Act” (Ref. 64). CEQ developed this guidance to “further assist Federal agencies with their
National Environmental Policy Act (NEPA) procedures.” As a matter of policy, the NRC considers CEQ
guidance on environmental justice in its NEPA review process.
CEQ provides the following information on disproportionately high and adverse human health
and environmental effects in its guidance:
Disproportionately High and Adverse Human Health Effects – Adverse health effects
are measured in terms of the risks and rates of fatal or nonfatal exposure to an
environmental hazard are significant (as employed by NEPA), or above generally
accepted norms. Adverse health effects may include bodily impairment, infirmity,
illness, or death. Disproportionately high and adverse human health effects occur when
the risk or rate of exposure to an environmental hazard for a minority population, lowincome population, or Indian Tribe to an environmental hazard is significant (as
employed by NEPA) and appreciably exceeds or is likely to appreciably exceed the risk
or exposure rate for the general population or for another appropriate comparison
group. Whether health effects occur in a minority population, low-income population,
or Indian Tribe affected by cumulative or multiple adverse exposures from
environmental hazards.
Disproportionately High and Adverse Environmental Effects – Disproportionately high
and adverse environmental effects occur when an impact on the natural or physical
environment significantly (as employed by NEPA) and adversely affects a minority
population, low-income population, or Indian Tribe. Such effects may include
ecological, cultural, human health, economic, or social impacts on minority
communities, low-income communities, or Indian Tribes when those impacts are
interrelated to impacts on the natural or physical environment; and the environmental
effects are significant (as employed by NEPA) and are or may be having an adverse
impact on minority populations, low-income populations, or Indian Tribes that
appreciably exceeds or is likely to appreciably exceed those on the general population
or other appropriate comparison group; and the environmental effects occur or would
occur in a minority population, low-income population, or Indian Tribe affected by
cumulative or multiple adverse exposures from environmental hazards.

Rev. 2 of RG 4.2, Supplement 1, Page 66

In 2004, the Commission issued its “Policy Statement on the Treatment of Environmental Justice
Matters in NRC Regulatory and Licensing Actions” (69 FR 52040) (Ref. 65), which states, “The
Commission is committed to the general goals set forth in E.O. 12898, and strives to meet those goals as
part of its NEPA review process.” This policy statement further states that the “NRC’s goal is to identify
and adequately weigh or mitigate effects on low-income and minority communities by assessing impacts
peculiar to those communities…EJ is a tool, within the normal NEPA context, to identify communities
that might otherwise be overlooked and identify impacts due to their uniqueness as part of the NRC’s
NEPA review process.” The following guidance is consistent with this policy statement.
The environmental justice review involves identifying minority and low-income populations and
Indian Tribes in the vicinity of the nuclear power plant that may be affected by license renewal and any
concerns and potential environmental and human health effects that may affect these populations. This
includes identifying the geographic areas of comparison, as well as the significance of any concerns and
potential environmental and human health effects and whether these effects would be disproportionately
high and adverse when compared to impacts on the general population. If the effects would be
disproportionately high and adverse, the review should consider possible mitigation measures to reduce or
eliminate these effects. The NRC will perform the environmental justice review to determine whether
there would be disproportionately high and adverse human health and environmental effects on minority
populations, low-income populations, and Indian Tribes for the plant-specific SEIS. The review will be
based on information provided in the ER and scoping.
Information and Analysis Content
The applicant should include the following information in the ER to assist NRC staff in its
environmental justice review:
•

Based on information about minority and low-income populations, Indian Tribes, and
communities residing in the immediate vicinity of the nuclear power plant (as presented in
Section 3.10 of this RG that addresses ER Section 3.10), identify any potential human health and
environmental concerns these populations and communities may have about continued reactor
operations. Also discuss the potential for disproportionately high and adverse human health and
environmental effects on these populations and communities.

•

To the extent that information is available, describe any observed subsistence consumption
behavior patterns – specifically fish and wildlife consumption – by minority and low-income
populations and Indian Tribes in the vicinity of the nuclear power plant (see Section 4-4 of
Executive Order 12898). This subsistence consumption behavior could consist of hunting,
fishing, and trapping of game animals and any other general food-gathering activities (e.g.,
collecting nuts and berries) conducted by minority and low-income populations and Indian Tribes
in the vicinity of the nuclear power plant.

•

To the extent that information is available, provide any information about current or past wildlife
sampling and testing for radioactivity in game animals such as deer, squirrel, turkey, pheasant,
duck, and other game birds and animals that may have been conducted in the vicinity of the
nuclear power plant.

•

If it is determined that reactor operations and other license renewal-related activities could affect
minority and/or low-income populations and Indian Tribes, describe any mitigation measures that
have been or could be implemented.

Rev. 2 of RG 4.2, Supplement 1, Page 67

4.11

Waste Management

Impacts associated with waste management activities evaluated in the LR GEIS are generic (the
same or similar at all plants) or Category 1. The applicant should discuss any new and significant
information in the ER, if applicable; otherwise, waste management impacts do not need to be analyzed.
4.12

Greenhouse Gas Emissions and Climate Change

Impacts associated with GHG emissions are evaluated in the LR GEIS and are generic or
Category 1. The applicant should discuss any new and significant information in the ER, if applicable;
otherwise, the impact on climate change from the plant’s GHG emissions does not need to be analyzed.
The following Category 2 issue requires a plant-specific assessment.
Climate Change Impacts
Table B-1 states the following:
Climate change can have additive effects on environmental resource conditions that may
also be directly impacted by continued operations and refurbishment during the license
renewal term. The effects of climate change can vary regionally and climate change
information at the regional and local scale is necessary to assess trends and the impacts
on the human environment for a specific location. The impacts of climate change on
environmental resources during the license renewal term are location-specific and cannot
be evaluated generically.
Specifically, 10 CFR 51.53(c)(3)(ii)(Q) requires the following:
Applicants shall include an assessment of the effects of any observed and projected
changes in climate on environmental resource areas that are affected by license renewal,
as well as any mitigation measures implemented at the applicant’s plant to address
climate change impacts.
Section 4.12 of the LR GEIS discusses GHG emissions and climate change impacts.
Information and Analysis Content
The climate change impact analysis should focus on the climate change impacts on those resource
areas where there are incremental impacts by continued nuclear power plant operations and any
refurbishment activities during the license renewal term. The applicant should include the following
information in the ER:
•

Climate change projections: Future regional climate change projections for the 20-year license
renewal term from climate change models, studies, and reports (e.g., U.S. Global Climate Change
Research Program). The geographic scope considered for climate change projections should not
be greater than the U.S. National Climate Assessment regions (Northeast, Southeast, Midwest,
etc.), and when available, local scale projections should be used. Changes in climate parameters
(e.g., climate change indicators) should be quantified, including changes in, but not limited to,
ambient temperature, precipitation, surface water temperature and levels, length of growing
season, and flooding, as appropriate. Climate change projections presented in the ER should
specify which future GHG emission scenario(s) were considered.

Rev. 2 of RG 4.2, Supplement 1, Page 68

•

Climate change impacts: The scope of the climate change impact analysis should focus on those
resource areas that could be incrementally affected by the proposed action (license renewal),
including consideration of any observed and projected changes in climate on environmental
resource areas. The analysis should discuss the impacts and implications from projected climate
change parameters on the resource area baseline conditions that were discussed in Chapter 3 of
the ER (e.g., elevated water intake temperatures can result in increases in cooling water
withdrawals).

•

Mitigation measures: Describe mitigation measures, including adaptation and climate change
resilience measures, to avoid or minimize climate change impacts on resource areas that are
impacted by the proposed action.

4.13

Cumulative Effects
The following Category 2 issue requires a plant-specific assessment.

Cumulative Effects
Table B-1 states the following:
Cumulative effects or impacts of continued operations and refurbishment associated with
license renewal must be considered on a nuclear plant-specific basis. The effects depend
on regional resource characteristics, the incremental resource-specific effects of license
renewal, and the cumulative significance of other factors affecting the environmental
resource.
Specifically, 10 CFR 51.53(c)(3)(ii)(O) requires the following:
Applicants shall provide information about other past, present, and reasonably
foreseeable actions occurring in the vicinity of the nuclear power plant that may result in
a cumulative effect.
Section 4.13 of the LR GEIS discusses cumulative effects. CEQ defines cumulative effects in 40
CFR 1508.1(g)(3) as “the effects on the environment that result from the incremental effects of the action
when added to the effects of other past, present, and reasonably foreseeable actions regardless of what
agency (Federal or non-Federal) or person undertakes such other actions. Cumulative effects can result
from individually minor but collectively significant actions taking place over a period of time.”
Cumulative effect analyses should consider new and ongoing activities, such as license renewal that are
conducted, regulated, or approved by a Federal agency. The goal of the analysis is to introduce
environmental considerations into the planning process as early as needed to improve decisionmaking.
The analysis should focus on environmental resources that could be affected by the proposed
license renewal action, including continued reactor operations and refurbishment activities. CEQ discusses
the assessment of cumulative effects in its 1997 publication “Considering Cumulative Effects Under the
National Environmental Policy Act” (Ref. 66). EPA presents useful perspectives on assessing cumulative
impacts in EPA 315-R-99-002, “Consideration of Cumulative Impacts in EPA Review of NEPA
Documents,” issued May 1999 (Ref. 67).

Rev. 2 of RG 4.2, Supplement 1, Page 69

The cumulative effects analysis in the ER should include the following considerations:
•

The geographic region of influence that encompasses the areas of potential environmental effects
and the distance at which the environmental effects of the proposed action and past, present, and
reasonably foreseeable actions may be experienced. Geographic regions of influence vary by
affected resource.

•

The timeframe for the cumulate effects analysis incorporates the incremental effects of the
proposed action (initial LR or SLR) with past, present, and reasonably foreseeable future actions
because these combined effects may accumulate or develop over time. Past and present actions
include all actions up to and including the date of the license renewal request. The timeframe for
the consideration of reasonably foreseeable future actions is the 20-year license renewal (initial
LR or SLR) term. Reasonably foreseeable future actions include current and ongoing planned
activities, approved and funded for implementation, or generally have a high probability of being
implemented.

•

The environmental effects from past and present actions are accounted for in baseline
assessments presented in affected environment discussions in Chapter 3 of the ER. Chapter 4 of
the ER accounts for the incremental effects or impacts of license renewal.

•

The incremental effects of the proposed action (license renewal) when added to the effects from
past, present, and reasonably foreseeable actions, and other actions (including trends such as
global climate change) result in the overall cumulative effect. A qualitative cumulative effects
analysis is conducted in instances where the incremental effects of the proposed action (license
renewal) and past, present, and reasonably foreseeable future actions are uncertain or not well
known.

•

For some resource areas (e.g., water and aquatic resources), the incremental contributions of
ongoing actions within a region are regulated and monitored through a permitting process (e.g.,
NPDES) under State or Federal authority. In these cases, it may be assumed that cumulative
effects are managed as long as these actions (e.g., facility operations) are in compliance with their
respective permits.

If, however, the cumulative effects analysis indicates that moderate to large impacts would occur
because of license renewal, the ER should identify mitigation measures to reduce and/or avoid any
adverse effects. Recent license renewal reviews have found cumulative effects to be small for most
environmental resources near a nuclear power plant, with some exceptions.
4.14

Impacts Common to All Alternatives: Uranium Fuel Cycle

Impacts associated with the uranium fuel cycle evaluated in the LR GEIS are generic (the same or
similar at all plants) or Category 1. The applicant should discuss any new and significant information in
the ER, if applicable; otherwise, uranium fuel cycle impacts do not need to be analyzed.
Transportation impacts is a Category 1 issue, and impacts are small as long as nuclear fuel is not
enriched beyond 5-percent uranium-235 and the average level of burnup for the peak rod does not exceed
62,000 megawatt-days per metric ton of uranium (MWd/MTU). Applicants that use or plan to seek
approval for use of nuclear fuel enriched beyond 5-percent uranium-235 or operate at an average burnup
for the peak rod beyond 62,000 MWd/MTU should request early guidance from NRC staff on how to
address this issue in the ER.

Rev. 2 of RG 4.2, Supplement 1, Page 70

4.15

Termination of Nuclear Power Plant Operations and Decommissioning

Impacts associated with the termination of plant operations and decommissioning are generic (the
same or similar at all plants) or Category 1. The applicant should discuss any new and significant
information in the ER, if applicable; otherwise, termination of reactor operations and decommissioning
impacts do not need to be analyzed.
Chapter 5

Assessment of New and Significant Information

Section C.1 of this RG discusses the regulatory requirement to report new and significant
information. While new and significant information can be identified from site visits, environmental
audits, and public comments on the draft SEIS, it is also critical for the applicant to identify new and
significant information prior to the beginning of the initial LR or SLR environmental review. For each
Category 1 issue, the applicant must determine whether any new and significant information exists that
would provide a seriously different picture of the environmental consequences of the proposed (license
renewal) action than previously considered in the LR GEIS, such as an environmental impact finding
different from that codified in Table B-1 (see Section C.1 of this RG for a definition of “new and
significant information”) and if so, describe those differences and assess any relevant plant-specific
environmental impacts. Applicants should also describe the methods used to identify potential new and
significant information. Chapter 5 of the ER should summarize the following information:
•

Describe the process for gathering and reviewing new and significant information for the ER.
Explain how the process resulted in the identification of any new and significant information for
Category 1 issues and any other issues. The explanation should address (1) the process used to
identify new information and (2) the process for determining the significance of any new
information. The process for identifying new information could include the review of
environmental monitoring reports, scientific literature, interviews with environmental and
operations staff, discussions with licensees and other peer groups and industry organizations,
consultations with experts knowledgeable about the local environment, and consultations with
other Federal, State, and local agencies, environmental justice communities, and Indian Tribes, as
well as natural resource, permitting, and land use planning agencies. If there is no new and
significant information, the applicant should state this determination in the ER.

•

Describe any environmental impacts associated with the new and significant information.

•

Describe any mitigation measures considered, and implemented, for any adverse impact.

The applicant need not include a detailed description about the discovery of any new and
significant information, but such information should be referenced in the ER and made available for
review by NRC staff.
If a SAMA review has previously been completed, an applicant must provide an assessment of
new and significant information with respect to a prior SAMA analysis. Guidance is provided in NEI 1704, Revision 1, “Model SLR New and Significant Assessment Approach for SAMA,” dated August 2019
(Ref. 68). NEI 17-04 is endorsed in this RG for plant-specific environmental reviews.

Rev. 2 of RG 4.2, Supplement 1, Page 71

Chapter 6
6.1

Summary of License Renewal Impacts and Mitigating Actions

License Renewal Impacts

In the ER, the applicant should present a table summarizing the environmental impacts of
continued plant operations during the license renewal term (initial LR or SLR). The table should be
organized by environmental resource areas in the order of the environmental issues listed in Table B-1 in
Appendix B to Subpart A of 10 CFR Part 51.
6.2

Mitigation

The ER should also summarize in tabular form any mitigation measures considered for
implementation.
6.3

Unavoidable Adverse Impacts

The ER should summarize “any adverse environmental effects which cannot be avoided should
the proposal be implemented,” as required by 10 CFR 51.45(b)(2). Chapters 4 and 5 of the ER should
identify unavoidable adverse effects, providing a level of detail commensurate with the significance of the
effects.
6.4

Irreversible or Irretrievable Resource Commitments

The ER should summarize “any irreversible and irretrievable commitments of resources which
would be involved in the proposed action should it be implemented,” as required by 10 CFR 51.45(b)(5).
Irreversible and irretrievable commitments of resources include energy, materials, and resources
committed and consumed in conjunction with continued nuclear power plant operations and any license
renewal-related refurbishment activities and additional waste materials generated. The applicant should
briefly describe the magnitude and significance of the resource commitments in the ER. Discussions
should be proportionate to the significance of the resource commitments.
6.5

Short-Term Use Versus Long-Term Productivity of the Environment

The ER should summarize “the relationship between local short-term uses of man’s environment
and the maintenance and enhancement of long-term productivity,” as required by 10 CFR 51.45(b)(4).
For operational impacts, “short-term” indicates the operating life of the nuclear power plant (including
any extension of reactor operations through license renewal), and “long-term” indicates the period after
reactor operations end, continuing as long as the nuclear power plant could have a discernible
environmental effect. The term “productivity” should be interpreted broadly to include both the
productivity of resources useful for human activity and the productivity and stability of ecological
systems, even those that are not used directly by humans.
Chapter 7

Alternatives to the Proposed Action

Regarding alternatives, 10 CFR 51.45(b)(3) states, in part, the following:
The discussion of alternatives shall be sufficiently complete to aid the Commission in
developing and exploring, pursuant to section 102(2)(E) of NEPA, “appropriate
alternatives to recommended courses of action in any proposal which involves unresolved
conflicts concerning alternative uses of available resources.” To the extent practicable,
the environmental impacts of the proposal and the alternatives should be presented in
comparative form.

Rev. 2 of RG 4.2, Supplement 1, Page 72

In addition, 10 CFR 51.53(c)(2) states, in part, the following:
[T]he applicant shall discuss in this report the environmental impacts of alternatives and
any other matters described in § 51.45. The report is not required to include discussion of
need for power or economic costs and economic benefits of the proposed action or of
alternatives to the proposed action except insofar as such costs and benefits are either
essential for a determination regarding the inclusion of an alternative in the range of
alternatives considered or relevant to mitigation. The environmental report need not
discuss other issues not related to the environmental effects of the proposed action and the
alternatives.
The regulation at 10 CFR 51.53(c)(3)(iii) states the following:
The report must contain a consideration of alternatives for reducing adverse impacts, as
required by § 51.45(c), for all Category 2 license renewal issues in appendix B to subpart
A of this part. No such consideration is required for Category 1 issues in appendix B to
subpart A of this part.
Section 5, “Alternatives including the Proposed Action,” of Appendix A to Subpart A of 10 CFR
Part 51 presents requirements for the treatment of alternatives in an EIS. These requirements are
consistent with the CEQ regulations implementing NEPA (40 CFR 1502.14), which require an EIS do the
following:
•

Evaluate reasonable alternatives to the proposed action, and, for alternatives that the agency
eliminated from detailed study, briefly discuss the reasons for their elimination.

•

Discuss each alternative considered in detail, including the proposed action, so that reviewers
may evaluate their comparative merits.

•

Include the no action alternative.

•

Identify the agency’s preferred alternative or alternatives, if one or more exists, in the draft
statement and identify such alternative in the final statement unless another law prohibits the
expression of such a preference.

•

Include appropriate mitigation measures not already included in the proposed action or
alternatives.

•

Limit their consideration to a reasonable number of alternatives.

Alternatives to the proposed action include the use of other energy sources potentially capable of
meeting the purpose and need of the proposed action (initial LR or SLR). A reasonable replacement
energy alternative must be commercially viable on a utility scale and operational before the expiration of
the reactor’s operating license or expected to become commercially viable on a utility scale, and
operational before the expiration of the reactor’s operating license. Reasonable alternatives should also
include mitigation measures that would reduce or avoid adverse effects. In deciding whether to renew the
operating license, the NRC will consider the environmental impacts of alternatives as well as those of the
proposed action. The NRC considers environmental effects of license renewal according to 10 CFR
51.103(a)(5), which states the following:

Rev. 2 of RG 4.2, Supplement 1, Page 73

In making a final decision on a license renewal action pursuant to Part 54 of this chapter,
the Commission shall determine whether or not the adverse environmental impacts of
license renewal are so great that preserving the option of license renewal for energy
planning decisionmakers would be unreasonable.
7.1

Alternative Energy Sources

Alternatives Considered
The purpose and need for the proposed action, as stated in the LR GEIS and in Chapter 1 of this
RG, is to provide an option that allows for baseload power generation capability beyond the term of the
current nuclear power plant operating license to meet future system generating needs. Such needs may be
determined by other energy-planning decisionmakers.
In addition to considering the environmental effects, or impacts, of the proposed action (license
renewal), the NRC must also consider the environmental effects of alternatives to replace or offset the
generating capacity of the nuclear power plant. Alternatives that meet the purpose and need include
(1) replacing existing nuclear generating capacity using other energy sources (i.e., constructing and
operating new fossil fuel, nuclear, and renewable energy power plants), and (2) offsetting existing nuclear
generation capacity using conservation and energy efficiency (demand-side management), delayed
retirement, or purchased power. These alternatives must also be commercially viable on a utility scale and
operational before the expiration of the reactor’s operating license or expected to become commercially
viable on a utility scale and operational before the expiration of the reactor’s operating license.
In the ER, the applicant should describe the process used to identify reasonable replacement
energy alternatives (see also Section 2.6 of this RG). The applicant should describe each of the
replacement energy alternatives selected for detailed analysis. In addition, the applicant should explain
why certain alternatives were eliminated from detailed study. The applicant should also indicate which
alternatives have been considered by State, utility, or other Federal authorities (e.g., public service
commissions; environmental, natural resource, or energy agencies; or other interest groups vested with
energy-planning authority, depending on existing energy regulatory structures) and how these
considerations relate to the applicant’s selection. This discussion should include State regulations that
promote, enhance, prohibit, or challenge alternatives.
Environmental Impacts of Alternative Energy Sources
The ER should describe the environmental impacts of the replacement energy alternatives
selected for detailed study in sufficient detail and in similar format to the proposed action so NRC staff
can compare the effects of the replacement power alternatives with the effects of continued plant
operations. The analyses should address construction and operations impacts (as appropriate) affecting
land use and visual resources, air quality and noise, geology and soils, water resources (surface water and
groundwater), ecological resources, historic and cultural resources, socioeconomics, human health,
environmental justice, and waste management and pollution prevention. The analysis should consider
direct and indirect effects and identify unavoidable adverse impacts, irreversible and irretrievable
resource commitments, and tradeoffs between short-term use and the long-term productivity of the
environment. Each alternative should be analyzed on a site-specific basis. Applicants should consider
analyzing the impacts of a replacement energy alternative at either the existing power plant site, at other
existing plant or brownfield sites, or on a State- or region-specific basis, depending on the applicant’s
service area (when applicable) or the power market into which the applicant sells electricity. The
applicant should analyze each impact in proportion to its significance. Chapter 4 of the LR GEIS includes
the results of an analysis of the generic environmental impacts of several electricity generating
Rev. 2 of RG 4.2, Supplement 1, Page 74

technologies. The applicant may use these results to the extent that they are applicable and brought up to
date. Any findings on impact levels for alternatives included in the LR GEIS are intended to illustrate
likely impacts and must be revisited on a site- and plant-specific basis in the ER.
7.2

Alternatives for Reducing Adverse Impacts

Alternatives Considered
As noted in 10 CFR 51.53(c)(3)(iii), “The report must contain a consideration of alternatives for
reducing adverse impacts, as required by § 51.45(c), for all Category 2 license renewal issues in
Appendix B to subpart A of this part.” Applicants should describe in the ER the process they used to
identify and select alternatives for reducing adverse impacts (see also Section 2.6 of this RG). Applicants
should describe all the alternatives considered and indicate which alternatives they evaluated in detail.
Typical alternatives considered include closed-cycle cooling or intake modification options for
nuclear power plants that currently use once-through cooling.
Environmental Impacts of Alternatives for Reducing Adverse Impacts
The ER should describe the impacts of alternatives for reducing adverse effects in sufficient detail
and in similar format to the proposed action so that NRC staff can compare the effects. The analyses
should address construction and operations impacts (as appropriate) affecting land use and visual
resources, air quality and noise, geology and soils, water resources (surface water and groundwater),
ecological resources, historic and cultural resources, socioeconomics, human health, environmental
justice, and waste management and pollution prevention. The analysis should consider direct and indirect
effects and identify unavoidable adverse impacts, irreversible and irretrievable resource commitments,
and tradeoffs between short-term use and the long-term productivity of the environment. Alternatives
should be analyzed on a site-specific basis and in proportion to their significance.
7.3

No-Action Alternative

The ER must include an analysis of the no-action alternative. For license renewal (initial LR or
SLR), the no-action alternative is a scenario in which the NRC does not renew the applicant’s operating
license, and the nuclear power plant continues to operate until the expiration of the current license. The
applicant/licensee could also decide to terminate reactor operations and begin decommissioning activities
prior to license expiration. Decommissioning is not a consequence of the no-action alternative, however,
because it could occur at any point in time, at license expiration, or whenever the applicant/licensee
decides that the nuclear power plant is no longer economically viable and terminates reactor operations.
The impacts of the no-action alternative are the impacts from terminating reactor operations and
preparing the nuclear power plant for decommissioning. The analysis should consider direct and indirect
effects. The level of detail should be commensurate with the significance of the environmental impacts.
The applicant may also summarize and incorporate by reference information from the LR GEIS to the
extent practicable.
Further, the no-action alternative does not meet the purpose and need for the proposed action as
stated in Section 1.3 of the LR GEIS (i.e., “…to provide an option that allows for baseload power
generation capability beyond the term of the current nuclear power plant operating license to meet future
system generating needs”). Because energy needs may be determined by State, utility, and, where
authorized, Federal agencies (other than NRC) decisionmakers, it may require the applicant, power plant
owners, State regulators, and/or system operators to take action to replace or compensate for lost power

Rev. 2 of RG 4.2, Supplement 1, Page 75

generation. The no-action alternative should consider the impacts of these actions, and the applicant may
incorporate by reference the impacts from analyses developed for the replacement energy alternatives
discussed in Section 7.1.
Chapter 8

Comparison of the Environmental Impact of License Renewal with the Alternatives

The ER should compare the environmental impacts of license renewal, reasonable energy
replacement alternatives, and no-action alternative to assist the NRC in determining “…whether or not the
adverse environmental impacts of license renewal are so great that preserving the option of license
renewal for energy-planning decisionmakers would be unreasonable” (see 10 CFR 51.95(c)(4)). The
applicant may present this comparison in any format, such as Tables 2.4-1 through 2.4-5 in the LR GEIS.
The comparison discussion should emphasize the more significant environmental impacts.
Chapter 9

Status of Compliance

Pursuant to 10 CFR 51.45(d), an applicant must discuss in the ER the status of compliance with
applicable environmental quality standards and requirements:
The environmental report shall list all Federal permits, licenses, approvals and other
entitlements which must be obtained in connection with the proposed action and shall
describe the status of compliance with these requirements. The environmental report
shall also include a discussion of the status of compliance with applicable
environmental quality standards and requirements including, but not limited to,
applicable zoning and land-use regulations, and thermal and other water pollution
limitations or requirements which have been imposed by Federal, State, regional, and
local agencies having responsibility for environmental protection.
Appendix F of the LR GEIS presents a brief discussion of Federal and State laws, regulations,
executive orders, and other requirements that may apply to, or be triggered by, the renewal and continued
reactor operation at NRC-licensed nuclear power plants. These include Federal and State laws,
regulations, and other requirements designed to protect the environment, including land and water use, air
quality, aquatic resources, terrestrial resources, radiological impacts, solid waste, chemical impacts, and
socioeconomic conditions.
Applicable Federal and State laws and regulations include the following:
•

laws and regulations that could require the NRC or the applicant to undergo a new authorization
or consultation process with Federal or State agencies outside the NRC; and

•

laws and executive orders that could require the NRC, or laws that could require the applicant, to
renew authorizations currently granted or hold additional consultations with Federal or State
agencies outside the NRC.

Appendix F of the LR GEIS is provided as a basic overview to assist the applicant in identifying
environmental and natural resources laws that may apply to, or be triggered by, the license renewal
process. The descriptions of each of the laws, regulations, executive orders, and other directives are
general in nature and are not intended to provide a comprehensive analysis or explanation of any of the
items listed. Appendix F is not intended as a complete and final list, and the applicant is reminded that a
variety of additional Federal, State, local, and regional requirements may apply to a license renewal
application for a specific nuclear power plant site.

Rev. 2 of RG 4.2, Supplement 1, Page 76

D. IMPLEMENTATION
The methods described in this RG will be used in reviewing applications for renewal of nuclear
power plant operating licenses (initial LR or SLR), which include information under 10 CFR 51.45,
51.51, 51.52, and 51.53, with respect to compliance with applicable regulations governing the
environmental review of operating nuclear power plants, unless the applicant proposes an acceptable
alternative method for complying with those regulations. Backfitting, issue finality, and forward-fitting
considerations do not apply to the NRC’s use of this RG to support these NRC reviews.

Rev. 2 of RG 4.2, Supplement 1, Page 77

E. REFERENCES 14
1.

U.S. Code of Federal Regulations (CFR), “Requirements for Renewal of Operating Licenses for
Nuclear Power Plants,” Part 54, Title 10, “Energy.” 15

2.

CFR, “Environmental Protection Regulations for Domestic Licensing and Related Regulatory
Functions,” Part 51, Title 10, “Energy.”

3.

National Environmental Policy Act of 1969 (NEPA), as amended, 42 United States Code (U.S.C.)
4321 et seq. 16

4.

Executive Order 11514, “Protection and Enhancement of Environmental Quality.” Federal
Register, 35 FR 4247, March 5, 1970, Office of the President, Washington, DC.

5.

Executive Order 11991, “Environmental Impact Statements,” Federal Register, 42 FR 26967, May
25, 1977, Office of the President, Washington, DC.

6.

CFR, “Chapter V – Council on Environmental Quality – Parts 1500 Through 1508,” Parts 1500–
1508, Title 40, “Protection of Environment.”

7.

Atomic Energy Act of 1954, as amended, 42 U.S.C. 2133 et seq.

8.

Energy Reorganization Act of 1974, as amended, 42 U.S.C. 5841 et seq.

9.

U.S. Nuclear Regulatory Commission (NRC), NUREG-1437, Revision 2, Draft Report for
Comment, “Generic Environmental Impact Statement for License Renewal of Nuclear Plants,”
Washington, DC. (ADAMS Accession No. ML23011A063).

10.

NRC, NUREG-1555, Supplement 1, Revision 2, Draft Report for Comment, “Standard Review
Plans for Environmental Reviews for Nuclear Power Plants, Supplement 1: Operating License
Renewal” Washington, DC. (ADAMS Accession No. ML22165A070).

11.

NRC, “Environmental Review for Renewal of Nuclear Power Plant Operating Licenses.” Federal
Register, Vol. 61, No. 109, June 5, 1996, pp. 28467-28497.

12.

NRC, “Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Final
Rule.” Federal Register, 61 FR 66537. December 18, 1996, Washington, DC.

13.

NRC, “Changes to Requirements for Environmental Review for Renewal of Nuclear Power Plant
Operating Licenses; Final Rule.” Federal Register, 64 FR 48496. September 3, 1999, Washington,
DC.

14

Publicly available NRC published documents are available electronically through the NRC Library on the NRC’s
public web site at http://www.nrc.gov/reading-rm/doc-collections/ and through the NRC’s Agencywide Documents
Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html. The documents can also
be viewed online or printed for a fee in the NRC’s Public Document Room (PDR) at 11555 Rockville Pike,
Rockville, MD. For problems with ADAMS, contact the PDR staff at 301-415-4737 or 800-397-4209; fax 301-4153548; or e-mail [email protected].
15
The Code of Federal Regulations may be obtained electronically from the U.S. Government Printing Office at:
https://www.ecfr.gov/.
16
The United States Code (U.S.C.) can be obtained electronically from the Office of the Law Revision Counsel of
the House of Representatives at https://uscode.house.gov.
Rev. 2 of RG 4.2, Supplement 1, Page 78

14.

NRC, “Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating
Licenses.” Federal Register, 78 FR 37282. June 20, 2013, Washington, DC.

15.

NRC, Regulatory Guide (RG) 4.2, Revision 3, “Preparation of Environmental Reports for Nuclear
Power Stations,” Washington, DC. (ADAMS Accession No. ML18071A400)

16.

CFR, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” Part 52, Title 10,
“Energy.”

17.

Federally Recognized Indian Tribe List Act of 1994, 25 U.S.C. 479a et seq.

18.

CFR, “Agency Rules of Practice and Procedure,” Part 2, Title 10, “Energy.”

19.

NRC, “Nuclear Regulatory Commission International Policy Statement.” Federal Register, 79 FR
39415. July 10, 2014, Washington, DC.

20.

NRC, Management Directive (MD) 6.6, “Regulatory Guides,” Washington, DC.

21.

NRC, NUREG-0750, Volume 74, Book 1, “Nuclear Regulatory Commission Issuances: Opinion
and Decisions of the Nuclear Regulatory Commission with Selected Orders,” Washington, DC.
(ADAMS Accession No. ML14028A554).

22.

Endangered Species Act of 1973, as amended, 16 U.S.C. 1531 et seq.

23.

Magnuson-Stevens Fishery Conservation and Management Act, as amended, 16 U.S.C. 1801 et seq.

24.

National Marine Sanctuaries Act, as amended, 16 U.S.C. 1431 et seq.

25.

National Historic Preservation Act of 1966, 54 U.S.C. 300101 et seq.

26.

CFR, “Identification of historic properties,” Part 800, Title 36, “Parks, Forests, and Public
Property.”

27.

Resource Conservation and Recovery Act of 1976, as amended, 42 U.S.C. 82 et seq.

28.

Multi-Resolution Land Characteristics Consortium (MRLC), 2019, “National Land Cover Database
Class Legend and Description,” https://www.mrlc.gov/data/legends/national-land-cover-databaseclass-legend-and-description.

29.

Coastal Zone Management Act of 1972, as amended, 16 U.S.C. 1456 et seq.

30.

CFR, “National Primary and Secondary Ambient Air Quality Standards,” Part 50, Title 40,
“Protection of Environment.”

31.

Clean Air Act of 1970, as amended, 42 U.S.C. 7401 et seq.

32.

Environmental Protection Agency (EPA), “Revisions to the General Conformity Regulations.”
Federal Register, 75 FR 17254. April 5, 2010, Washington, DC.

33.

United States Department of Agriculture, Natural Resources Conservation Service, “Soil Survey,”
https://www.nrcs.usda.gov/wps/portal/nrcs/main/soils/survey/.

Rev. 2 of RG 4.2, Supplement 1, Page 79

34.

Farmland Protection Policy Act, as amended, 7 U.S.C. 4201 et seq.

35.

Federal Water Pollution Control Act (commonly referred to as the Clean Water Act), as amended,
33 U.S.C. 1251 et seq.

36.

CFR, “State Certification of Activities Requiring a Federal License or Permit,” Part 121, Title 40,
“Protection of Environment.”

37.

EPA, “Clean Water Act Section 401 Certification Rule.” Federal Register, 85 FR 42210. July 13,
2020, Washington, DC.

38.

Migratory Bird Treaty Act, as amended, 16 U.S.C. 703 et seq.

39.

Marine Mammal Protection Act of 1972, as amended, 16 U.S.C. 1361 et seq.

40.

CFR, “Interagency Cooperation—Endangered Species Act of 1973, As Amended,” Part 402,
Title 50, “Wildlife and Fisheries.”

41.

United States Department of Interior, Fish and Wildlife Service, “IPaC: Information for Planning
and Consultation,” https://ipac.ecosphere.fws.gov/.

42.

National Oceanic and Atmospheric Administration (NOAA), National Marine Fisheries Service,
2020, “Essential Fish Habitat (EFH) Mapper,” https://www.habitat.noaa.gov/apps/efhmapper/.

43.

NOAA, Office of National Marine Sanctuaries, “Maps,”
https://sanctuaries.noaa.gov/about/maps.html.

44.

CFR, “National Register of Historic Places,” Part 60, Title 36, “Parks, Forests, and Public
Property.”

45.

CFR, “Procedures for State, Tribal, and Local Government Historic Preservation Programs,”
Part 61, Title 36, “Parks, Forests, and Public Property.”

46.

Institute of Electrical and Electronics Engineers Standards Association (IEEE SA). “National
Electrical Safety Code (NESC),” Piscataway, NJ.17

47.

Nuclear Energy Institute (NEI). 2019. “Industry Groundwater Protection Initiative – Final Guidance
Document, Rev. 1,” NEI 07-07, Revision 1, Washington, DC (ADAMS Accession No.
ML19142A071). 18

48.

CFR, “Standards for Protection Against Radiation,” Part 20, Title 10, “Energy.”

49.

CFR, “Domestic Licensing of Production and Utilization Facilities,” Part 50, Title 10, “Energy.”

17

Copies of Institute of Electrical and Electronics Engineers (IEEE) documents may be purchased from the Institute
of Electrical and Electronics Engineers Service Center, 445 Hoes Lane, PO Box 1331, Piscataway, NJ 08855 or
through the IEEE’s public Web site at https://www.ieee.org/publications_standards/index.html.
18
Publications from the Nuclear Energy Institute (NEI) are available at their Web site: http://www.nei.org/ or by
contacting the headquarters at Nuclear Energy Institute, 1776 I Street NW, Washington, DC 20006-3708, Phone:
202-739-800, Fax 202-785-4019.
Rev. 2 of RG 4.2, Supplement 1, Page 80

50.

Daily, G.C., S. Alexander, P.R. Ehrlich, J. Lubchenco, P.A. Matson, H.A. Mooney, S. Postel,
S.H. Schneider, D. Tilman, and G.M. Woodwell, “Ecosystem Services: Benefits Supplied to
Human Societies by Natural Ecosystems,” Issues in Ecology, 2:1–16, 1997. Available at
http://www.esa.org/science_resources/issues/FileEnglish/issue2.pdf.

51.

EPA, “Guidelines for Ecological Risk Assessment.” Federal Register, 63 FR 26846. May 14, 1998,
Washington, DC.

52.

Council on Environmental Quality (CEQ), 1993, “Incorporating Biodiversity Considerations Into
Environmental Impact Analysis Under the National Environmental Policy Act,” Washington, DC.
Available at https://ceq.doe.gov/docs/ceq-publications/Incorporating_Biodiversity_1993.pdf.

53.

Menzie, C., M.H. Henning, J. Cura, K. Finkelstein, J. Gentile, J. Maughan, D. Mitchell, S. Petron,
B. Potocki, S. Svirsky, and P. Tyler, “Special Report of the Massachusetts Weight-of-Evidence
Workgroup: A Weight-Of-Evidence Approach for Evaluating Ecological Risks,” Human and
Ecological Risk Assessment, 2:277-304, 1996. Available at
https://doi.org/10.1080/10807039609383609.

54.

NRC, NUREG-1437, Supplement 10, Second Renewal, “Generic Environmental Impact Statement
of License Renewal of Nuclear Plants, Regarding Subsequent License Renewal for Peach Bottom
Atomic Power Station, Units 2 and 3, Final Report,” Washington, DC (ADAMS Accession No.
ML20023A937).

55.

CFR, “EPA Administered Permit Programs: The National Pollutant Discharge Elimination
System,” Part 122, Title 40, “Protection of Environment.”

56.

CFR, “Criteria and Standards for the National Pollutant Discharge Elimination System,” Part 125,
Title 40, “Protection of Environment.”

57.

EPA, “National Pollutant Discharge Elimination System—Final Regulations To Establish
Requirements for Cooling Water Intake Structures at Existing Facilities and Amend Requirements
at Phase I Facilities.” Federal Register, 79 FR 48300. August 15, 2014, Washington, DC.

58.

CFR, “Magnuson-Stevens Act Provisions,” Part 600, Title 50, “Wildlife and Fisheries.”

59.

NOAA, Office of National Marine Sanctuaries, 2009, “Overview of Conducting Consultation
Pursuant to Section 304(d) of the National Marine Sanctuaries Act (16 U.S.C. 1434(d)),” Silver
Spring, MD. Available at https://nmssanctuaries.blob.core.windows.net/sanctuariesprod/media/archive/management/pdfs/304d.pdf.

60.

NRC, “Revision to Environmental Review for Renewal of Nuclear Power Plant Operating
Licenses.” Federal Register, 78 FR 37282. June 20, 2013, Washington, DC.

61.

NRC, Regulatory Guide (RG) 4.2, Supplement 1, Revision 1, “Preparation of Environmental
Reports for Nuclear Power Stations,” Washington, DC. (ADAMS Accession No. ML13067A354).

62.

Executive Order 12898, “Federal Actions To Address Environmental Justice in Minority
Populations and Low-Income Populations.” Federal Register, 59 FR 7629, February 11, 1994,
Office of the President, Washington, DC.

Rev. 2 of RG 4.2, Supplement 1, Page 81

63.

NRC, Letter from NRC Chairman Ivan Selin to the President, dated March 31, 1994. (ADAMS
Accession No. ML033210526).

64.

CEQ, 1997, “Environmental Justice: Guidance under the National Environmental Policy Act,”
Washington, DC. Available at https://ceq.doe.gov/docs/ceq-regulations-andguidance/regs/ej/justice.pdf.

65.

NRC, “Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory
and Licensing Actions.” Federal Register, 69 FR 52040. August 24, 2004, Washington, DC.

66.

CEQ, 1997, “Considering Cumulative Effects Under the National Environmental Policy Act.”
(ADAMS Accession No. ML12243A349).

67.

EPA, 315-R-99-002, 1999, “Consideration of Cumulative Impacts in EPA Review of NEPA
Documents.” Available at https://www.epa.gov/sites/default/files/201408/documents/cumulative.pdf.

68.

NEI. 2019. “Model SLR New and Significant Assessment Approach for SAMA,” NEI 17-04,
Revision 1, Washington, DC (ADAMS Accession No. ML19318D216).

Rev. 2 of RG 4.2, Supplement 1, Page 82


File Typeapplication/pdf
File TitlePreparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, Draft Regulatory Guide DG-4027
SubjectDG-4027, RG 4.2 Supplement 1, environmental report, environmental review, nuclear power plants, continued operations, license re