Download:
pdf |
pdfU.S. Department of the Interior
OMB Control Number: 1010-0151
OMB Approval Expires: x/xx/202x
Bureau of Ocean Energy Management
OCS PLAN INFORMATION FORM
General Information
Type of OCS Plan:
Exploration Plan (EP)
Development Operations Coordination Document (DOCD)
Company Name:
BOEM Operator Number:
Address:
Contact Person:
Phone Number:
E-Mail Address:
If a service fee is required under 30 CFR 550.125(a), provide the
Amount paid
Receipt No.
Project and Worst Case Discharge (WCD) Information
Lease(s):
Objective(s)
Area:
Oil
Gas
Platform/Well Name:
Block(s):
Sulphur
Salt
Project Name (If Applicable):
Onshore Support Base(s):
Total Volume of WCD:
Distance to Closest Land (Miles):
API Gravity:
Volume from uncontrolled blowout:
Have you previously provided information to verify the calculations and assumptions for your WCD?
Yes
No
Do you propose to use new or unusual technology to conduct your activities?
Yes
No
Do you propose to use a vessel with anchors to install or modify a structure?
Yes
No
Do you propose any facility that will serve as a host facility for deepwater subsea development?
Yes
No
If so, provide the Control Number of the EP or DOCD with which this information was provided
Description of Proposed Activities and Tentative Schedule (Mark all that apply)
Proposed Activity
Start Date
End Date
No. of Days
Exploration drilling
Development drilling
Well completion
Well test flaring (for more than 48 hours)
Installation or modification of structure
Installation of production facilities
Installation of subsea wellheads and/or manifolds
Installation of lease term pipelines
Commence production
Other (Specify and attach description)
Description of Drilling Rig
Description of Structure
Jackup
Drillship
Caisson
Tension leg platform
Gorilla Jackup
Platform rig
Fixed platform
Compliant tower
Semisubmersible
Submersible
Spar
Guyed tower
DP Semisubmersible
Other (Attach Description)
Floating production
system
Other (Attach Description)
Drilling Rig Name (If Known):
Description of Lease Term Pipelines
From (Facility/Area/Block)
To (Facility/Area/Block)
Diameter (Inches)
Form BOEM- 0137 (Month Year- Supersedes all previous editions of this form which may not be used.)
Length (Feet)
Page 1 of 4
OCS PLAN INFORMATION FORM (CONTINUED)
Include one copy of this page for each proposed well/structure
Proposed Well/Structure Location
Previously reviewed under an approved EP or
DOCD?
Well or Structure Name/Number (If renaming well or
structure, reference previous name):
Yes
No If this is an existing well or structure, list the
Is this an existing well
or structure?
Complex ID or API No.
Do you plan to use a subsea BOP or a surface BOP on a floating facility to conduct your proposed activities?
WCD info
For wells, volume of uncontrolled
blowout (Bbls/day):
Surface Location
Lease No.
OCS
For structures, volume of all storage and
pipelines (Bbls):
Bottom-Hole Location (For Wells)
Yes
No
Yes
No
API Gravity of
fluid
Completion (For multiple completions,
enter separate lines)
OCS
OCS
OCS
Area Name
Block No.
Blockline
Departures
(in feet)
Lambert XY
coordinates
Latitude/
Longitude
N/S Departure:
F
L
N/S Departure:
F
L
E/W Departure:
F
L
E/W Departure:
F
L
X:
X:
Y:
Y:
Latitude
Latitude
Longitude
Longitude
Water Depth (Feet):
MD (Feet):
TVD (Feet):
Anchor Radius (if applicable) in feet:
N/S Departure:
N/S Departure:
N/S Departure:
E/W Departure:
E/W Departure:
E/W Departure:
X:
X:
X:
Y:
Y:
Y:
Latitude
Latitude
Latitude
Longitude
Longitude
Longitude
MD (Feet):
MD (Feet):
MD (Feet):
F
F
F
F
F
F
TVD (Feet):
TVD (Feet):
TVD (Feet):
Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary)
Anchor Name
or No.
Area
Block
X Coordinate
Y Coordinate
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
Length of Anchor Chain on Seafloor
Form BOEM- 0137 (Month Year- Supersedes all previous editions of this form which may not be used.)
Page 2 of 4
L
L
L
L
L
L
OCS PLAN INFORMATION FORM (CONTINUED)
Provide the following information for the well with the highest Worst Case Discharge volume:
Worst Case Discharge (WCD) Well Information
WCD Well
Name
Surface Lease
Surface
Area/Block
OCS Lease
Well No.
Bottom Lease
Bottom
Area/Block
Product Type
MD
Analog Well(s)
Area/Block
API No.
Geologic Data for WCD
Open Hole Interval for WCD
Top (TVD in feet)
Base (TVD in feet)
Sand 1
Sand 2
Sand 3
Sand 4
Sand 5
Formation Data
Sand Name
Estimated Top TVD
Estimated Base TVD
Estimated Net Sand Height MD
(Net Pay if hydrocarbon)
Estimated Net Sand Height
TVT (Net Pay if hydrocarbon)
Fluid Type
Used in WCD? (Yes/No)
Seismic Survey Used
Engineering Data for WCD
WCD Engineering Items
WCD (STB/Day)
WCD Calculated at
Flow Correlation
Outlet Pressure (Psia)
Gas Turbulence Factor
Software Model Used
Mudline
Sand 1
Yes
No
Sand 2
Atmosphere
Sand 3
Yes
Sand 4
No
Sand 5
Formation Data
Sand Name
Permeability (mD)
Initial Pressure (PSIA)
Form BOEM- 0137 (Month Year- Supersedes all previous editions of this form which may not be used.)
Page 3 of 4
TVD
OCS PLAN INFORMATION FORM (CONTINUED)
Sand 1
Sand 2
Sand 3
Sand 4
Sand 5
Formation Data
Reservoir Temperature (F)
Porosity (0.00)
Water Saturation (0.00)
Rock Compressibility
(microsips)
Water Salinity (ppm)
Drive Mechanism
Drainage Area (acres)
Oil Reservoir Data
Bubble Point Pressure (PSIA)
Initial Bo (RB/STB)
Bo (RB/STB) @ Bubble Point
Rsi (SCF/STB)
Initial Oil Viscosity (Cp)
Oil Viscosity (CP) @ Bubble
Point
Oil Compressibility (1/PSIA)
Oil API Gravity (API)
Specific Gas Gravity (0.00)
Gas Reservoir Data
Condensate API Gravity (API)
Specific Gas Gravity (0.00)
Yield (STB/MMCF)
Source of Permeability Used
Permeability from MDT
Permeability from Core Analysis
Percussion core
Rotary sidewall core
Conventional core
Pressure Transient Analysis
Permeability from CMR or NMR log
analysis
Permeability from other source
Provide Model Input Values for Relative Permeability:
Residual Oil to Gas fraction (=1-Slc-Swc)
Residual Oil to Water fraction (=Soc)
Critical Gas fraction (Sgc, Gas/Oil-Water Systems)
Residual Gas to Water fraction (Sgc, Gas/Gas-Water Systems)
Kro Oil Curve Endpoint (fraction of absolute permeability)
Krg Gas Curve Endpoint (fraction of absolute permeability)
Krw Water Curve Endpoint (fraction of absolute permeability)
Paperwork Reduction Act of 1995 Statement: The Paperwork Reduction Act of 1995 (44 U.S.C. 2501 et seq.) requires us to
inform you that BOEM collects this information as part of an applicant’s Exploration Plan or Development Operations
Coordination Document submitted for BOEM approval. We use the information to facilitate our review and data entry for OCS
plans. We will protect proprietary data according to the Freedom of Information Act and 30 CFR 550.197. An agency may not
conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office
of Management and Budget Control Number. Responses are mandatory (43 U.S.C. 1334). The public reporting burden for this
form is included in the burden for preparing Exploration Plans and Development Operations Coordination Documents. We
estimate that burden to average 600 hours with an accompanying EP, or 700 hours with an accompanying DPP or DOCD, including
the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the forms associated with
subpart B. Direct comments regarding the burden estimate or any other aspect of this form to the Information Collection Clearance
Officer, Bureau of Ocean Energy Management, 45600 Woodland Road, Sterling, Virginia 20166.
Form BOEM- 0137 (Month Year- Supersedes all previous editions of this form which may not be used.)
Page 4 of 4
File Type | application/pdf |
File Title | BOEM 0137 OCS Plan Info |
Author | Michael Joseph Tolbert |
File Modified | 2023-05-23 |
File Created | 2015-03-26 |