ChemRads Appendix B

ChemRads Appendix B.docx

Disinfectants/Disinfection Byproducts, Chemical and Radionuclides (Renewal)

ChemRads Appendix B

OMB: 2040-0204

Document [docx]
Download: docx | pdf





Appendix B

Consultation Results

Exhibit 1



Consultation Results

Changes in burden estimates based on October 2022 consultations are as follows.

Lead Service Line - Monitoring, Notification, and Burden (Systems)

Original Burden

Activity

System Size

Revised Burden Estimate

Comments

2.5 hrs

Collection and Analysis

Not system size dependent

6.00

Based on finding, inspecting, and selecting sites

0.50 hrs

Notification Preparation

>50,000

3.00

Notification letters typically require multiple levels of review



CWS Public Education Requirements (Other)

Original Burden

Activity

System Size

Revised Burden Estimate

Comments

5 hrs

Burden to Prepare and Mail a PSA

Not system size dependent

15.00

Some systems have many phases of review and revision

3.5 hrs

Burden to Prepare Additional Brochure Language

Not system size dependent

7.00

Some systems have many phases of review and revision

2 hrs

Burden for Consulting with State

Not system size dependent

4.00

 

3.5 hrs

Burden to Post on Website

>100,000

5.00

Includes design, build, test, and post



System Reporting Burden

Original Burden

Activity

System Size

Revised Burden Estimate

Comments

1.5 hrs

Tap Sample Letter

Not system size dependent

4.00

 



Source Water Monitoring for Lead & Copper Burden (Systems)

Original Burden

Activity

Revised Burden Estimate

Comments

1.0 hr

Analysis (Per Sample)

3.00

Includes metals analysis



Tap Monitoring for Lead & Copper Burden (Systems)

Original Burden

Activity

Revised Burden Estimate

Comments

4.0 hrs

Collection and Analysis (Per Sample)

5.00

 



Water Quality Parameter Monitoring Burden (Systems)

Original Burden

Activity

Revised Burden Estimate

Comments

0.4 hrs

Collection (Entry Point)

2.00

For multiple entry points

0.5 hrs

Collection (Tap)

5.00

multiple sites

0.5 hrs

Analysis (Entry Point)

2.00

includes metals analysis

2.0 hrs

Analysis (Tap)

4.00

includes metals analysis



ChemRads ICR – Consultations B-3 October 2022


File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
AuthorRoland, Kevin
File Modified0000-00-00
File Created2023-08-25

© 2024 OMB.report | Privacy Policy