Contractor’s Certificate of Actual Cost Section 232 |
U.S.
Department of Housing |
OMB Approval No. 2502-0605 (exp. 11/30/2022) |
Public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. The information is being collected to obtain the supportive documentation that must be submitted to HUD for approval, and is necessary to ensure that viable projects are developed and maintained. The Department will use this information to determine if properties meet HUD requirements with respect to development, operation and/or asset management, as well as ensuring the continued marketability of the properties. Response to this request for information is required in order to receive the benefits to be derived from the National Housing Act Section 232 Healthcare Facility Insurance Program. This agency may not collect this information, and you are not required to complete this form unless it displays a currently valid OMB control number. While no assurance of confidentiality is pledged to respondents, HUD generally discloses this data only in response to a Freedom of Information Act request.
Warning: Anyone who knowingly submits a false claim or makes a false statement is subject to criminal and/or civil penalties, including confinement for up to 5 years, fines, and civil and administrative penalties. (18 U.S.C. §§ 287, 1001, 1010, 1012; 31 U.S.C. §3729, 3802).
Project Name: |
FHA Project Number: |
Building Number: |
|
Project Address: |
|||
Borrower Name: |
Contractor Name: |
Div. |
Trade Item |
Paid in Cash |
To Be Paid In Cash |
Total |
Name of Subcontractor or Payee |
Line |
3 |
Concrete |
|
|
|
|
1 |
4 |
Masonry |
|
|
|
|
2 |
5 |
Metals |
|
|
|
|
3 |
6 |
Rough Carpentry |
|
|
|
|
4 |
6 |
Finish Carpentry |
|
|
|
|
5 |
7 |
Waterproofing |
|
|
|
|
6 |
7 |
Insulation |
|
|
|
|
7 |
7 |
Roofing |
|
|
|
|
8 |
7 |
Sheet Metal |
|
|
|
|
9 |
8 |
Doors |
|
|
|
|
10 |
8 |
Windows |
|
|
|
|
11 |
8 |
Glass |
|
|
|
|
12 |
9 |
Lath and Plaster |
|
|
|
|
13 |
9 |
Drywall |
|
|
|
|
14 |
9 |
Tile Work |
|
|
|
|
15 |
9 |
Acoustical |
|
|
|
|
16 |
9 |
Wood Flooring |
|
|
|
|
17 |
9 |
Resilient Flooring |
|
|
|
|
18 |
9 |
Painting and Decorating |
|
|
|
|
19 |
10 |
Specialties |
|
|
|
|
20 |
11 |
Special Equipment |
|
|
|
|
21 |
11 |
Cabinets |
|
|
|
|
22 |
11 |
Appliances |
|
|
|
|
23 |
12 |
Blinds and Shades, Artwork |
|
|
|
|
24 |
12 |
Carpets |
|
|
|
|
25 |
13 |
Special Construction |
|
|
|
|
26 |
14 |
Elevators |
|
|
|
|
27 |
15 |
Plumbing and Hot Water |
|
|
|
|
28 |
15 |
Heat and Ventilation |
|
|
|
|
29 |
15 |
Air Conditioning |
|
|
|
|
30 |
16 |
Electrical |
|
|
|
|
31 |
|
Subtotal (Structures) |
|
|
|
|
32 |
|
Accessory Structures |
|
|
|
|
33 |
|
Total (Structures) |
|
|
|
|
|
|
|
|
Div. |
Trade Item |
Paid in Cash |
To be Paid Cash |
Total |
Name of Subcontractor or Payee |
Line |
2 |
Earth Work |
|
|
|
|
35 |
2 |
Site Utilities |
|
|
|
|
36 |
2 |
Roads and Walks |
|
|
|
|
37 |
2 |
Site Improvements |
|
|
|
|
38 |
2 |
Lawns and Planting |
|
|
|
|
39 |
2 |
Unusual Site Conditions |
|
|
|
|
40 |
|
Total (Land Improvements) |
|
|
|
|
41 |
|
Total (Structure and Land Improvements) |
|
|
|
|
42 |
1 |
General Requirements |
|
|
|
|
43 |
|
General Overhead |
|
|
|
|
44 |
|
Miscellaneous (Labor and Materials) * |
|
|
|
|
45 |
|
Bond Premium |
|
|
|
|
46 |
|
Other Fees–Paid by Contractor |
|
|
|
|
47 |
|
|
|
|
|
|
48 |
|
Total Costs |
|
|
|
|
49 |
* Total purchases of materials and cost of labor amounting to less than $1,000 may be included as a lump sum under miscellaneous materials and labor. Costs exceeding this amount for materials and labor must be allocated to the trade item under which they were expended on HUD-92330-A-ORCF worksheets 3 and 4.
Note: If additional space is required for these or other items, append Rider thereto, with references and initial. When more than one subcontractor is performing a trade item, the attached work sheet must be completed giving the information indicated.
Itemized Breakdown
|
|||||
General Requirements (Job Overhead) |
|
Other Fees–Paid by Contractor |
|
||
Item |
|
Total |
Item |
|
Total |
Supervision |
$ |
|
|
$ |
|
Field Engineering |
|
|
|
|
|
Field Office Expense |
|
|
|
|
|
Temporary Facilities |
|
|
|
|
|
Temporary Utilities |
|
|
|
|
|
Cleaning and Rubbish Removal |
|
|
|
|
|
|
|
|
|
|
|
Watchmen Wages |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total for General Requirements |
$ |
|
Total |
$ |
|
The undersigned hereby certifies that: (Check One)
There has not been and is not now any identity of interest between borrower and/or general contractor on the one hand and any subcontractor, material supplier or equipment lessor on the other.
The accompaniment contains a statement fully describing any identities of interest. Identity of Interest is defined as follows: When there is any financial interest of the party of the first part in the party of the second part; when one or more of the officers, directors or stockholders or the part of the first part is also an officer, director or stockholder of the party of the second part; when any officer, director or stockholder of the party of the first part has any financial interest whatsoever in the party of the second part; when the part of the second part advances any funds to the party of the first part; when the party of the second part provides and pays on behalf of the party of the first part the cost of any architectural services or engineering services other than those of a surveyor, general superintendent, or engineer employed by a general contract in connection with its obligations under the construction contract; when the party of the second part takes stock or any interest in the party of the first part as part of the consideration to be paid them; when there exist or come into being any side deals, agreements, contracts or undertakings entered into or contemplated, thereby altering, amending or cancelling any of the required closing documents except as approved by HUD.
All amounts shown have been reduced to give effect to the amount(s) of any kickbacks, rebates, adjustments, discounts, or any other devices which had the effect of reducing the actual cost, and all amounts shown above as “to be paid in cash” will be so paid within forty-five (45) days after final endorsement.
Note: This certificate must be supported by a certification as to actual cost by an independent Certified Public Accountant or by an independent public accountant as required for Form HUD-93305-ORCF.
I hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is true and accurate.
Signature: |
Date: |
Div. |
Trade Item |
Paid in Cash |
To Be Paid In Cash |
Total |
Name of Subcontractor or Payee |
3 |
Concrete |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Masonry |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Metals |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Rough Carpentry |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Finish Carpentry |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Waterproofing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Insulation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Roofing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Sheet Metal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Doors |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Windows |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Glass |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Lath and Plaster |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Drywall |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Tile Work |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Acoustical |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Div. |
Trade Item |
Paid in Cash |
To Be Paid In Cash |
Total |
Name of Subcontractor or Payee |
9 Wood Flooring
9 Resilient Flooring
|
Wood Flooring |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 Painting and Decorating |
Resilient Flooring |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Painting and Decorating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10 |
Specialties |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
Special Equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
Cabinets |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
Appliances |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
Blinds and Shades, Artwork |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
Carpets |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13 |
Special Construction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14 |
Elevators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15 |
Plumbing and Hot Water |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15 |
Heat and Ventilation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15 |
Air Conditioning |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
16 |
Electrical |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Earth Work |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Site Utilities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Roads and Walks |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Site Improvements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Lawns and Planting |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Unusual Site Conditions |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Previous
versions obsolete Page
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
Author | H22192 |
File Modified | 0000-00-00 |
File Created | 2023-09-01 |