Table C-2 Optional PSM Wksht

PSM On-Site Consultation Agreements (29 CFR 1908)

Table C-2 Optional PSM Wksht

OMB: 1218-0281

Document [docx]
Download: docx | pdf

Table C-2: Relief System Design and Design Basis Used at the Establishment (Optional)

Spot check location

Relief valve description

(29 CFR 1910.119(d)(3) (i)(D))

Is relief system design and design basis complete?

(29 CFR 1910.119 (d)(3)(i)(D))

RAGAGEP/design codes and standards used?

(29 CFR 1910.119(d)(3)(ii)&(iii))

Additional findings (e.g., equipment in deficient condition is used; 29 CFR 1910.119(j)(5))