All facilities | ||||
Number of Existing Facilities | 13 | |||
Number of New Facilities | 0 | |||
Total | 13 | |||
Industry Wages | ||||
May 2019 National Industry-Specific Occupational Employment and Wage Estimates | ||||
Sectors 31, 32, and 33 - Manufacturing | ||||
Category | Occupation Code | Title | 2019 Wage | Loaded Wage |
Technical | 17-2081 | Architecture and Engineering Occupations | 48.4 | 101.64 |
Clerical | 43-6014 | Office and Administrative Support Occupations | 22.65 | 47.57 |
Managerial | 11-9041 | Management Occupations | 66.36 | 139.36 |
https://www.bls.gov/oes/current/naics4_3250A1.htm#11-0000 | ||||
EPA Wages | ||||
Hourly Mean Wage | With Fringe & Overhead | |||
(GS- 12, step 1) - Tech. | 30.9 | $49.44 | ||
(GS- 13, step 5) - Mgmt. | 41.64 | $66.62 | ||
(GS-6, step 3) - Cler. | 16.72 | $26.75 | ||
https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2019/GS_h.pdf | ||||
or https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/ | ||||
Table 1 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Cyanide Chemicals Manufacturing RTR - Year 1 | |||||||||||||
Burden Item | (A) Respondent Hours per Occurrence (Technical hours) |
(B) Non Labor Costs Per Occurrence |
(C) Number of Occurrences Per Respondent Per Year |
(D) Technical Hours per Respondent Per Year (A X C) |
(E) Number of Respondents Per Year |
(F) Technical Hours per Year (D X E) |
(G) Clerical Hours per Year (F X 0.1) |
(H) Management Hours per Year (F X .05) |
(I) Total Hours per Year (F + G + H) |
(J) Total Labor Costs Per Year |
(K) Total Non-Labor Costs Per Year (B x C x E) |
(L) Total Number of Responses per Year (C X E) |
Footnotes |
1. Applications | NA | ||||||||||||
2. Surveys and Studies | NA | ||||||||||||
3. Reporting Requirements | |||||||||||||
A. Read Rule | 8 | $0 | 1 | 8 | 13 | 104 | 10 | 5 | 120 | $11,790 | $0 | 0 | a, b |
B. Required Activities | c | ||||||||||||
1. Wastewater Applicability/Compliance Calculations | 0.5 | $0 | 1 | 0.5 | 13 | 6.5 | 0 | 0 | 7 | $709 | $0 | 13 | d |
2. Wastewater sampling - applicability/compliance sampling | 0.5 | $50 | 2 | 1 | 13 | 13 | 0 | 1 | 14 | $1,418 | $1,300 | 26 | e, f |
C. Create Information | Inc. in 3B | ||||||||||||
D. Gather Information | Inc. in 3E | ||||||||||||
E. Report Preparation | c | ||||||||||||
1. Notification of Compliance Status | |||||||||||||
a. Process Wastewater Control Applicability Performace Test/Compliance Demionstration | 2 | $0 | 1 | 2 | 13 | 26 | 3 | 1 | 30 | $2,947 | $0 | 13 | |
Reporting Subtotal | 150 | 13 | 7 | 170 | $16,864 | $1,300 | 52 | ||||||
4. Recordkeeping Requirements | c | ||||||||||||
A. Read Instructions | Inc. in 3.A | ||||||||||||
B. Implement Activities | NA | ||||||||||||
C. Develop Record System | NA | ||||||||||||
D. Record information | |||||||||||||
1. Process wastewater notification and report records | 0.5 | $0 | 1 | 1 | 13 | 7 | 1 | 0 | 7 | $737 | $0 | 0 | |
2. Process wastewater control applicability/compliance records | 2 | $0 | 1 | 2 | 13 | 26 | 3 | 1 | 30 | $2,947 | $0 | 0 | |
E. Understand Requirements and Adjust Compliance Plan | 20 | $0 | 1 | 20 | 13 | 260 | 26 | 13 | 299 | $29,475 | $0 | 0 | |
F. Time for Audits | NA | ||||||||||||
Recordkeeping Subtotal | 293 | 29 | 15 | 336 | $33,159 | $0 | 0 | ||||||
TOTAL | 442 | 42 | 22 | 507 | $50,023 | $1,300 | 52 | ||||||
Footnotes: | |||||||||||||
(a) There are 13 currently operating facilities. We assumed that there would be no new facilities that would commence operations within three years after promulgation of the rule. As such, costs are estimated for 13 facilities. This is a conservative estimate that assumes none of the 13 existing facilities are new facilities subject to the current cyanide chemicals manufacturing MACT.. | |||||||||||||
(b) This is a one-time cost incurred only in year 1. | |||||||||||||
(c) Assumes all facilities will read the rule and perform one-time activities (i.e., determine/calculate process wastewater control applicability/compliance) in year 1. | |||||||||||||
(d) Includes labor hour costs to gather data and do calculations to determine process wastewater control applicability. Assumes that owners and operators have the necessary information to perform analyses readily-available for HAP other than free cyanide wastewater stream concentration (burden associated with obtaining sampling concentration for free cyanide assumed under 3.B.2. | |||||||||||||
(e) Assumes a one time nonlabor cost (in the first year) of $50 to sample wastewater stream for free cyanide to determine applicability to wastwater process requirements for existing sources. It is assumed that each existing facility will incur this cost. | |||||||||||||
(f) Assumes a one time nonlabor cost (in the first year) of $50 to sample wastewater stream for free cyanide to determine compliance with concentration limit compliance options under the wastewater stream process requirements for existing sources. | |||||||||||||
Table 2 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Cyanide Chemicals Manufacturing RTR - Year 2 | |||||||||||||
Burden Item | (A) Respondent Hours per Occurrence (Technical hours) |
(B) Non Labor Costs Per Occurrence |
(C) Number of Occurrences Per Respondent Per Year |
(D) Technical Hours per Respondent Per Year (A X C) |
(E) Number of Respondents Per Year |
(F) Technical Hours per Year (D X E) |
(G) Clerical Hours per Year (F X 0.1) |
(H) Management Hours per Year (F X .05) |
(I) Total Hours per Year (F + G + H) |
(J) Total Labor Costs Per Year |
(K) Total Non-Labor Costs Per Year (B x C x E) |
(L) Total Number of Responses per Year (C X E) |
Footnotes |
1. Applications | NA | ||||||||||||
2. Surveys and Studies | NA | ||||||||||||
3. Reporting Requirements | |||||||||||||
A. Read Rule | 8 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a, b |
B. Required Activities | c | ||||||||||||
1. Wastewater Control Applicability Calculations/Data | 0.5 | $0 | 0 | 13 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | d |
2. Wastewater sampling - applicability/compliance sampling | 0.5 | $50 | 13 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e,f | |
C. Create Information | Inc. in 3B | ||||||||||||
D. Gather Information | Inc. in 3E | ||||||||||||
E. Report Preparation | c | ||||||||||||
1. Notification of Compliance Status | |||||||||||||
a. Process Wastewater Control Applicability Performace Test/Compliance Demionstration | 2 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
Reporting Subtotal | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4. Recordkeeping Requirements | c | ||||||||||||
A. Read Instructions | Inc. in 3.A | ||||||||||||
B. Implement Activities | NA | ||||||||||||
C. Develop Record System | NA | ||||||||||||
D. Record information | |||||||||||||
1. Process wastewater notification and report records | 0.25 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
2. Process wastewater control applicability records | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
E. Understand Requirements and Adjust Compliance Plan | 20 | $0 | 1 | 20 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
F. Time for Audits | NA | ||||||||||||
Recordkeeping Subtotal | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
TOTAL | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
Footnotes: | |||||||||||||
(a) There are 13 currently operating facilities. We assumed that there would be no new facilities that would commence operations within three years after promulgation of the rule. As such, costs are estimated for 13 facilities. This is a conservative estimate that assumes none of the 13 existing facilities are new facilities subject to the current cyanide chemicals manufacturing MACT. | |||||||||||||
(b) This is a one-time cost incurred only in year 1. | |||||||||||||
(c) Assumes all facilities will read the rule and perform one-time activities (i.e., determine/calculate process wastewater control applicability/compliance) in year 1. | |||||||||||||
(d) Includes labor hour costs to gather data and do calculations to determine process wastewater control applicability. Assumes that owners and operators have the necessary information to perform analyses readily-available for HAP other than free cyanide wastewater stream concentration (burden associated with obtaining sampling concentration for free cyanide assumed under 3.B.2. | |||||||||||||
(e) Assumes a one time nonlabor cost (in the first year) of $50 to sample wastewater stream for free cyanide to determine applicability to wastwater process requirements for existing sources. It is assumed that each existing facility will incur this cost. | |||||||||||||
(f) Assumes a one time nonlabor cost (in the first year) of $50 to sample wastewater stream for free cyanide to determine compliance with concentration limit compliance options under the wastewater stream process requirements for existing sources. |
Table 3 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Cyanide Chemicals Manufacturing RTR - Year 3 | |||||||||||||
Burden Item | (A) Respondent Hours per Occurrence (Technical hours) |
(B) Non Labor Costs Per Occurrence |
(C) Number of Occurrences Per Respondent Per Year |
(D) Technical Hours per Respondent Per Year (A X C) |
(E) Number of Respondents Per Year |
(F) Technical Hours per Year (D X E) |
(G) Clerical Hours per Year (F X 0.1) |
(H) Management Hours per Year (F X .05) |
(I) Total Hours per Year (F + G + H) |
(J) Total Labor Costs Per Year |
(K) Total Non-Labor Costs Per Year (B x C x E) |
(L) Total Number of Responses per Year (C X E) |
Footnotes |
1. Applications | NA | ||||||||||||
2. Surveys and Studies | NA | ||||||||||||
3. Reporting Requirements | |||||||||||||
A. Read Rule | 8 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a, b |
B. Required Activities | c | ||||||||||||
1. Wastewater Control Applicability Calculations/Data | 0.5 | $0 | 0 | 13 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | d |
2. Wastewater sampling - applicability/compliance sampling | 0.5 | $50 | 0 | 13 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e,f |
C. Create Information | Inc. in 3B | ||||||||||||
D. Gather Information | Inc. in 3E | ||||||||||||
E. Report Preparation | |||||||||||||
1. Notification of Compliance Status | |||||||||||||
a. Process Wastewater Control Applicability Performace Test/Compliance Demionstration | 2 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
Reporting Subtotal | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4. Recordkeeping Requirements | |||||||||||||
A. Read Instructions | Inc. in 3.A | c | |||||||||||
B. Implement Activities | NA | ||||||||||||
C. Develop Record System | NA | ||||||||||||
D. Record information | |||||||||||||
1. Process wastewater notification and report records | 0.25 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
2. Process wastewater control applicability records | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
E. Understand Requirements and Adjust Compliance Plan | 20 | $0 | 1 | 20 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
F. Time for Audits | NA | ||||||||||||
Recordkeeping Subtotal | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
TOTAL | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
Footnotes: | |||||||||||||
(a) There are 13 currently operating facilities. We assumed that there would be no new facilities that would commence operations within three years after promulgation of the rule. As such, costs are estimated for 13 facilities. This is a conservative estimate that assumes none of the 13 existing facilities are new facilities subject to the current cyanide chemicals manufacturing MACT. | |||||||||||||
(b) This is a one-time cost incurred only in year 1. | |||||||||||||
(c) Assumes all facilities will read the rule and perform one-time activities (i.e., determine/calculate process wastewater control applicability/compliance) in year 1. | |||||||||||||
(d) Includes labor hour costs to gather data and do calculations to determine process wastewater control applicability. Assumes that owners and operators have the necessary information to perform analyses readily-available for HAP other than free cyanide wastewater stream concentration (burden associated with obtaining sampling concentration for free cyanide assumed under 3.B.2. | |||||||||||||
(e) Assumes a one time nonlabor cost (in the first year) of $50 to sample wastewater stream for free cyanide to determine applicability to wastwater process requirements for existing sources. It is assumed that each existing facility will incur this cost. | |||||||||||||
(f) Assumes a one time nonlabor cost (in the first year) of $50 to sample wastewater stream for free cyanide to determine compliance with concentration limit compliance options under the wastewater stream process requirements for existing sources. |
Table 4 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Cyanide Chemicals Manufacturing RTR | |||||||
Year | Technical Hours | Clerical Hours | Management Hours | Total Labor Hours | Labor Costs | Non Labor (Annualized Capital/Startup and O&M) Costs | Total Costs |
1 | 442 | 42 | 22 | 507 | $50,023 | $1,300 | $51,323 |
2 | 0 | 0 | 0 | 0 | $0 | $0 | $0 |
3 | 0 | 0 | 0 | 0 | $0 | $0 | $0 |
Total | 442 | 42 | 22 | 507 | $50,023 | $1,300 | $51,323 |
Average | 147 | 14 | 7 | 169 | $16,674 | $433 | $17,108 |
Year | Number of Respondents | Number of Responses | Reporting Hours | Recordkeeping Hours | Total Hours | Hours per Response | Hours Per Respondent |
1 | 13 | 52 | 170 | 336 | 507 | 10 | 39 |
2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total | 13 | 52 | 170 | 336 | 507 | 10 | 39 |
Average | 4 | 17 | 57 | 112 | 169 | 3 | 13 |
Table 5 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Cyanide Chemicals Manufacturing RTR - Year 1 | ||||||||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | |||||||||||||||||
Burden Item | Number of Occurrences Per Year | Technical Hours Per Occurrence | Tech Hours Per Year (C=A x B) |
Management Hours Per Year (D = C x 0.05) |
Clerical Hours Per Year (E = C x 0.1) |
Total Hours Per Year (C+D+E) | Total Cost Per Year | |||||||||||||||||
1. | Applications | not applicable | ||||||||||||||||||||||
2. | Read and Understand Rule Requirements | 6 | 8 | 48 | 2 | 5 | 55 | $2,661 | a | |||||||||||||||
3. | Required Activities | |||||||||||||||||||||||
C. | Create Information | not applicable | ||||||||||||||||||||||
D. | Gather Information | not applicable | ||||||||||||||||||||||
E. | Report Reviews | |||||||||||||||||||||||
1. | Review notification of compliance status | |||||||||||||||||||||||
a. Process Wastewater Control | 2 | 5 | 10 | 1 | 1 | 12 | $554 | |||||||||||||||||
2. | Review compliance reports | |||||||||||||||||||||||
a. Process Wastewater Control Applicability Testing/Calculations | 4 | 2 | 8 | 0 | 1 | 9 | $444 | |||||||||||||||||
F. | Prepare annual summary report | 1 | 4 | 4 | 0 | 0 | 5 | $222 | ||||||||||||||||
TOTAL | 70 | 4 | 7 | 81 | $3,881 | |||||||||||||||||||
Footnotes: | ||||||||||||||||||||||||
a | Number of occurrences is the number of states and EPA Regions with affected sources (4 states + 2 EPA regions = 6 respondents). | |||||||||||||||||||||||
Percent of Stack Tests Observed | 20% | |||||||||||||||||||||||
Estimated Percent Retesting | 10% | |||||||||||||||||||||||
Estimated Percent Emission Exceedences | 10% |
Table 6 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Cyanide Chemicals Manufacturing RTR - Year 2 | ||||||||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | |||||||||||||||||
Burden Item | Number of Occurrences Per Year | Technical Hours Per Occurrence | Tech Hours Per Year (C=A x B) |
Management Hours Per Year (D = C x 0.05) |
Clerical Hours Per Year (E = C x 0.1) |
Total Hours Per Year (C+D+E) | Total Cost Per Year | |||||||||||||||||
1. | Applications | not applicable | ||||||||||||||||||||||
2. | Read and Understand Rule Requirements | 0 | 8 | 0 | 0 | 0 | 0 | $0 | a | |||||||||||||||
3. | Required Activities | |||||||||||||||||||||||
C. | Create Information | not applicable | ||||||||||||||||||||||
D. | Gather Information | not applicable | ||||||||||||||||||||||
E. | Report Reviews | |||||||||||||||||||||||
1. | Review notification of compliance status | |||||||||||||||||||||||
a. Process Wastewater Control | 0 | 5 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
2. | Review compliance reports | |||||||||||||||||||||||
a. Process Wastewater Control Applicability Testing/Calculations | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
F. | Prepare annual summary report | 0 | 4 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
TOTAL | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||||
Footnotes: | ||||||||||||||||||||||||
a | Number of occurrences is the number of states and EPA Regions with affected sources (4 states + 2 EPA regions = 6 respondents) incurred only in Year 1. | Percent of Stack Tests Observed | 20% | |||||||||||||||||||||
Estimated Percent Retesting | 10% | |||||||||||||||||||||||
Estimated Percent Emission Exceedences | 10% |
Table 7 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Cyanide Chemicals Manufacturing RTR - Year 3 | ||||||||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | |||||||||||||||||
Burden Item | Number of Occurrences Per Year | Technical Hours Per Occurrence | Tech Hours Per Year (C=A x B) |
Management Hours Per Year (D = C x 0.05) |
Clerical Hours Per Year (E = C x 0.1) |
Total Hours Per Year (C+D+E) | Total Cost Per Year | |||||||||||||||||
1. | Applications | not applicable | ||||||||||||||||||||||
2. | Read and Understand Rule Requirements | 0 | 8 | 0 | 0 | 0 | 0 | $0 | a | |||||||||||||||
3. | Required Activities | |||||||||||||||||||||||
C. | Create Information | not applicable | ||||||||||||||||||||||
D. | Gather Information | not applicable | ||||||||||||||||||||||
E. | Report Reviews | |||||||||||||||||||||||
1. | Review notification of compliance status | |||||||||||||||||||||||
a. Process Wastewater Control | 0 | 5 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
2. | Review compliance reports | |||||||||||||||||||||||
a. Process Wastewater Control Applicability Testing/Calculations | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
F. | Prepare annual summary report | 0 | 4 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
TOTAL | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||||
Footnotes: | ||||||||||||||||||||||||
a | Number of occurrences is the number of states and EPA Regions with affected sources (4 states + 2 EPA regions = 6 respondents) incurred only in Year 1. | |||||||||||||||||||||||
Percent of Stack Tests Observed | 20% | |||||||||||||||||||||||
Estimated Percent Retesting | 10% | |||||||||||||||||||||||
Estimated Percent Emission Exceedences | 10% |
Table 8 - Summary of Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Cyanide Chemicals Manfufacturing RTR | |||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Labor Costs | Non Labor Costs | Total Costs |
1 | 70 | 4 | 7 | 81 | $3,881 | $0 | $3,881 |
2 | 0 | 0 | 0 | 0 | $0 | $0 | $0 |
3 | 0 | 0 | 0 | 0 | $0 | $0 | $0 |
Total | 70 | 4 | 7 | 81 | $3,881 | $0 | $3,881 |
Average | 23 | 1 | 2 | 27 | $1,294 | $0 | $1,294 |
File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |