5100-142 Sponsor Request for FAA Acknowledgment for Cold Weather

Airports Grants Program

faa-form-5100-142-cold-weather-request-2020

OMB: 2120-0569

Document [pdf]
Download: pdf | pdf
U.S. Department
of Transportation
Federal Aviation
Administration

FAA Form 5100-142, Sponsor Request for FAA Acknowledgment for
Cold Weather Early Start
Paperwork Reduction Act Burden Statement
A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a
person be subject to a penalty for failure to comply with a collection of information subject to the
requirements of the Paperwork Reduction Act unless that collection of information displays a currently
valid OMB Control Number. The OMB Control Number for this information collection is 2120-0569. Public
reporting for this collection of information is estimated to be approximately 8 hours per response,
including the time for reviewing instructions, searching existing data sources, gathering and maintaining
the data needed, completing and reviewing the collection of information. All responses to this collection of
information are required under 49 U.S.C. Section 47105 to retain a benefit and to meet the reporting
requirements of 2 CFR 200. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to: Information Collection
Clearance Officer, Federal Aviation Administration, 10101 Hillwood Parkway, Fort Worth, TX 76177-1524.

Instructions for Form 5100-142,
Sponsor Request for FAA Acknowledgment for Cold Weather Early Start
General
49 USC §47110(b)(2)(D) provides for limited circumstances that allows the Federal Aviation
Administration (FAA) to participate in construction costs that a Sponsor incurs prior to grant execution.
The information in this form is necessary for FAA consideration of a sponsor’s request for early project
start due to shortened construction season availability resulting from regional cold weather climate (FAA
Order 5100.38D, Table 3-60). A sponsor may use a consultant or other representative to prepare this
form. However, this form may only be signed by a duly authorized official of the airport sponsor. The
Sponsor may not delegate either the signature acceptance or the certification acceptance to a consultant
or contractor.

Form items
The numbered instructions below pertain to the numbered items in the form.

Project Information
1. Project Description. Provide clear and concise description of project. (For example:
Mill and overlay 66,000 square yards of asphalt runway surface, including the intersection with Runway
9/27 and three adjoining taxiways (Alpha, Kilo and Sierra)).
2. Total Project Cost. Provide the total amount, including all funding sources.

FAA Form 5100-142

Page i of ii

3. Proposed Funding Plan. Identify all amounts including all categories of Airport Improvement Program
(AIP) funding requested as well as Passenger Facility Charges (PFCs), state funding, local funds, etc.
4. Alternative Funding Plan. Provide the alternative funding source if AIP discretionary funds are not
awarded. If future year AIP funding is the source of alternative funding, provide what the source of interim
funding is until entitlement funds are available. Only future year passenger, cargo, or non-primary
entitlements are allowable sources of AIP funding.
5. Date of Original AIP Funding Request. Provide the date of sponsor's capital improvement plan, or
other document, containing the sponsor's original discretionary request to the FAA for this project. Enter
the date as Month/Day/Year, for example 10/22/2017.
6. Date Bids Were (or will be) Received. Bid Tabulation and Recommendation to Award must be
attached if the project has been bid. If the project will be bid after this request for FAA Acknowledgement
is being submitted, the bid tabulations and the recommendation for award must be submitted to the FAA
prior to Notice to Proceed is issued. Enter the date as Month/Day/Year, for example 10/22/2017.

Construction Information
For phased projects, provide information for only the current phase being requested.
1. Estimated Notice to Proceed (NTP) Date. Enter the date as Month/Day/Year, for example
10/22/2017.
2. Latest NTP Date. Provide the latest date construction can begin to avoid climatic conditions impact to
construction schedule. Enter the date as Month/Day/Year, for example 10/22/2017.
3. Estimated Completion Date. Enter the date as Month/Day/Year, for example 10/22/2017.
4. Impacted Construction Activities. Describe specific construction activities that would be impacted or
interrupted by cold-weather construction, including the nature of the impacts. Include a clear comparison
of the proposed construction with and without early start, and a month-by-month summary of project
impacts.
5. Estimated Cost Impacts. Describe specific construction cost impacts if project is not started or
completed according to the desired schedule. Include only physical construction cost impacts, excluding
impacts related to construction administration.
6. Other Impacts. Describe any other impacts that may result from schedule delays due to cold-weather
climatic conditions.
7. Cold Weather Calculations. For each month of the calendar year, provide the average high and low
air temperature at the airport (in degrees Fahrenheit) in the table provided.
8. Public Data Source. Identify the publicly published source for the above weather data, including a
URL for online resources.

FAA Form 5100-142

Page ii of ii

U.S. Department of Transportation
Federal Aviation Administration

OMB CONTROL NUMBER: 2120-0569
EXPIRATION DATE: 6/30/2023

Sponsor Request for FAA Acknowledgement
for Cold Weather Early Start
Sponsor:
Airport Name:
Airport City, State:
Project Title:
Sponsor hereby requests FAA consideration and acknowledgement of Sponsor intent to incur project
costs prior to the establishment of a grant as allowed per 49 U.S.C. § 47110(b)(2)(D) to accommodate a
shortened construction season as a result of climatic conditions at the project location.

Project Information
1. Project Description:

2. Total Project Cost:
Phase 1:

$

Phase 2 (if applicable): $
3. Proposed Funding Plan:

4. Alternative Funding Plan:

5. Date of Original AIP Funding Request (mm/dd/yyyy):
Phase 1:
Phase 2 (if applicable):
6. Date Bids Were (or will be) Received (mm/dd/yyyy):
Phase 1:
Phase 2 (if applicable):

Construction Information
For phased projects, provide information for only the current phase being requested.
1. Estimated Notice to Proceed (NTP) Date (mm/dd/yyyy):
2. Latest NTP Date (mm/dd/yyyy):
3. Estimated Completion Date (mm/dd/yyyy):
FAA Form 5100-142 (8/20) SUPERSEDES PREVIOUS EDITION

Page 1 of 3

4. Impacted Construction Activities:

5. Estimated Cost Impacts:

6. Other Impacts:

7. Cold Weather Calculations.
For each month of the calendar year, enter the average high and low air temperature at the airport
(in degrees Fahrenheit) in the table below.
Month

Average
High

Average
Low

January
February
March
April
May
June
July
August
September
October
November
December
8. Public Data Source for Weather Information:

FAA Form 5100-142 (8/20) SUPERSEDES PREVIOUS EDITION

Page 2 of 3

Required Sponsor Certifications
Sponsor’s authorized official must initial each certification statement below:
_____

The sponsor understands that there is no guarantee of federal funding and no commitment on
the part of the FAA to provide a future grant agreement for the above project. The sponsor has
an alternate funding source to complete the project should federal funding not be available.

_____

The sponsor understands that the FAA can only consider a grant containing discretionary
funding in the same fiscal year as construction has started and the cost is incurred on the
project.

_____

The sponsor’s written request includes all necessary information required by the FAA to
process the grant application.

_____

The sponsor acknowledges their decision to move forward with the project, even with FAA
acknowledgement, does not raise the priority of the project, nor increase the likelihood of
receiving federal funding.

_____

The sponsor will complete the project in accordance with all applicable FAA standards
regardless of whether AIP discretionary funding is provided.

Official Sponsor Request
FAA acknowledgement does not in any manner signal intent of the FAA to award AIP
Discretionary funds at a particular level or time. FAA action on this request only represents
acknowledgement that the sponsor has taken the necessary steps, submitted the required
documentation and accepted all of the risks should the sponsor choose to issue NTP prior to
receiving a grant.
I hereby request FAA acknowledgement to issue Notice to Proceed prior to grant award.

Sponsor’s Certification
As a duly authorized official with the airport sponsor, I understand and accept all legal and financial risks
(on behalf of the sponsor) associated with this request.
Executed on this

day of

,

.

Name of Sponsor:
Name of Sponsor’s Authorized Official:
Title of Sponsor’s Authorized Official:

Signature of Sponsor’s Authorized Official:
I declare under penalty of perjury that the foregoing is true and correct. I understand that knowingly and
willfully providing false information to the federal government is a violation of 18 USC § 1001 (False
Statements) and could subject me to fines, imprisonment, or both.

Submit by Email
FAA Form 5100-142 (8/20) SUPERSEDES PREVIOUS EDITION

Page 3 of 3

FAA Use Only Below This Line
Date Request Received:
Date Due to Sponsor (30 calendar days after receipt):
ADO/RO Staff Recommendation (Choose one):
Issue FAA acknowledgement
Do not issue FAA acknowledgement for reasons checked below:
Form and/or supporting documentation incomplete
Grant application not received
Construction not impacted by climatic (cold-weather) conditions
No pending AIP Discretionary funding request
Insufficient alternative funding plan
Other issues involving project eligibility or justification
Other issues involving construction procurement
Other (describe):

Reviewed by ADO Manager (before forwarding to Regional Office):
ADO Manager’s Name:
ADO Manager’s Signature: _______________________________
Date of Signature (mm/dd/yyyy):
Date Forwarded to Regional Office (mm/dd/yyyy):
Reviewed by Regional Director, Office of Airports (before forwarding to APP-500):
Regional Director's Name:
Regional Director's Signature: _____________________________
Date of Signature (mm/dd/yyyy):
Date Forwarded to APP-500 (mm/dd/yyyy):

FAA Form 5100-142 (8/20) SUPERSEDES PREVIOUS EDITION

FAA-1 of 2

Reviewed by APP-500:
Reviewer’s Name:
Reviewer’s Signature: ____________________________________
Date of Signature (mm/dd/yyyy):
APP-500 Determination:

ADO Manager or Regional Director, Office of Airports Notification to Sponsor:
Name of Notifying FAA Official:
Title of Notifying FAA Official:
Notification Date (mm/dd/yyyy):

FAA Form 5100-142 (8/20) SUPERSEDES PREVIOUS EDITION

FAA-2 of 2


File Typeapplication/pdf
File TitleFAA Form 5100-142, Sponsor Request for FAA Acknowledgement for Cold Weather Early Start
SubjectAirport Cold Weather Early Start Request form
AuthorAirport Financial Assistance Division (APP-500) 202-267-3831
File Modified2020-08-18
File Created2019-04-26

© 2024 OMB.report | Privacy Policy