Form FAA Form 5370-1 FAA Form 5370-1 Construction Progress and Inspection Report

Airports Grants Program

faa-form-5370-1-construction-progress-inspection-report-not-extended-2023

Airports Grants Program - Performance Measurement

OMB: 2120-0569

Document [pdf]
Download: pdf | pdf
U.S. Department
of Transportation
Federal Aviation
Administration

FAA Form 5370-1, Construction Progress and Inspection Report
Paperwork Reduction Act Statement
A federal agency may not conduct or sponsor, and a person is not required to respond to, nor
shall a person be subject to a penalty for failure to comply with a collection of information
subject to the requirements of the Paperwork Reduction Act unless that collection of information
displays a currently valid OMB Control Number. The OMB Control Number for this information
collection is 2120-0569. Public reporting for this collection of information is estimated to be
approximately 8 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, completing and reviewing
the collection of information. All responses to this collection of information may be required
under Title 49 Section 47105 to retain a benefit and to meet the reporting requirements of 2
CFR 200. Send comments regarding this burden estimate or any other aspect of this collection
of information, including suggestions for reducing this burden to: Information Collection
Clearance Officer, Federal Aviation Administration, 10101 Hillwood Parkway, Fort Worth, TX
76177-1524.

Instructions for Preparing FAA Form 5370-1
Submit one copy for each report. If additional space is required to complete any of the items,
continue on a separate sheet of plain paper, identifying it with the project number.

OMB CONTROL NUMBER: 2120-0569
EXPIRATION DATE: 6/30/2023

Period Ending

Construction Progress and Inspection Report
U.S. Department
of Transportation
Federal Aviation
Administration

Project Number

Airport Grant Program

Airport Name
Contractor’s Name

Project Description
1. Contract Time

No. Days Charged to Date

Last Working Day Charged (Date)

2. Brief Weather Summary this Period, including Approximate Rainfall and Periods of Below Freezing Temperature
(On earthwork jobs, include soil conditions.)

3. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading,
drainage, base, surface, lighting, etc.)

4. Work Completed or In Progress this Period

5a. Summary of Laboratory and Field Testing this Period (Note failing tests and any retests. Summarize out-of-tolerance.)

5b. Material (Identify material subject to pay reduction.)

6. Description of Anticipated Work by Contractor for Next Period

7. Problem Areas/Other Comments (Include revisions to plans and specifications approved or denied, delays, difficulties,
etc. and actions taken.)

SPONSOR’S INSPECTOR OR REPRESENTATIVE
Date

Typed or Printed Name and Title

FAA Form 5370-1 (7/21) SUPERCEDES PREVIOUS EDITION

Signature


File Typeapplication/pdf
File TitleForm 5370-1, Construction Progress and Inspection Report (7/2021)
Subject5370-1, construction, AIP, reporting
AuthorFAA Airport Engineering Division (AAS-100), 202-267-7669
File Modified2023-05-31
File Created2014-05-06

© 2024 OMB.report | Privacy Policy