Notification Requirements for
Leak Detection and Repair
New
collection (Request for a new OMB Control Number)
No
Regular
09/27/2023
Requested
Previously Approved
36 Months From Approved
1,000
0
8,000
0
0
0
A person owning or operating a natural
gas pipeline facility is required to provide information to the
Secretary of Transportation at the Secretary's request according to
49 USC 60117. The Pipeline Safety regulations contained within 49
CFR Part 192 require operators to make various notifications upon
the occurrence of certain events. The provisions covered under this
information collection request involve notification requirements
for operators who utilize alternative or expanded technologies and
methods when conducting leak detection and repair activities. These
notification requirements are necessary to ensure safe operation of
pipelines and ascertain compliance with gas pipeline safety
regulations. These mandatory notifications help PHMSA to stay
abreast of issues related to the health and safety of the nation's
pipeline infrastructure. PHMSA proposes to create this information
in conjunction with proposed regulatory changes made in the
Pipeline Safety: Gas Leak Detection and Repair NPRM which requires
operators to notify PHMSA in various instances pertaining to leak
detection and repair activities. PHMSA expects all gas pipeline
operators to be subject to these notification
requirements.
Pipeline Safety: Gas Leak
Detection and Repair NPRM proposes to require pipeline operators to
notify PHMSA if alternative or expanded technologies and methods
are used when conducting leak detection and repair activities.
Requirements include notifying PHMSA in accordance with § 192.18 90
days in advance of using an alternative technology or assessment
method; allowing operators to request the use of human senses, in
lieu of leak detection equipment, when conducting a leak survey if
the operator provides advance notification to PHMSA in accordance
with § 192.18; allowing operators to request to use an alternative
advanced leak detection performance standard if the operator
notifies PHMSA, in accordance with § 192.18; and allowing operators
to request an extension of the leak repair deadline requirements
for an individual grade 3 leak with advance notification to, and
review by, PHMSA pursuant to § 192.18 .
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.