RFS2 Renewable Electricity Generator – Production Report (Report Form ID: RFS4300): Instructions for Completing
Who must report
Generally, a Renewable Electricity Generator producing renewable electricity for use to produce a biogas-derived renewable fuel must comply with the reporting requirement found at 40 CFR § 80.150(c).
Reporting Deadlines
Renewable Electricity Generators must submit such information or reports on monthly biogas batches by the end of the subsequent calendar month.
Please check the RFS reporting web site for updated instructions and templates:
https://www.epa.gov/fuels-registration-reporting-and-compliance-help/reporting-fuel-programs
For information on submitting this report using EPA’s Central Data Exchange (CDX) visit: https://www.epa.gov/fuels-registration-reporting-and-compliance-help/user-guides-otaqdcfuel-central-data-exchange-cdx
Field Instructions:
Field |
Field Name |
Units |
Field Formats, Codes & Special Instructions |
1. |
Report Form ID |
|
AAAAAAA; Character. RFS4300: Form ID for the RFS Renewable Electricity Generator Producer Report. |
2. |
Report Type |
|
A; Character. Indicate whether this is the original report or a resubmission. Submit only one Original report, submit any corrections or updates as Resubmission(s): O: Original R: Resubmission |
3. |
CBI |
|
A; Character. Specify if the data contained within the report is being claimed as Confidential Business Information (CBI) under 40 CFR Part 2, subpart B:
Y:
Confidential
Business
Information |
4. |
Report Date |
|
MM/DD/YYYY; Character. Enter the date the original or resubmitted report is submitted. |
5. |
Report Year |
|
YYYY; Character. Indicate the compliance period (year) of the report. |
6. |
Company/Entity ID |
|
AAAA; Character. Enter the four-digit, EPA-assigned company/entity ID. |
7. |
Company Name |
|
AAAAAAA…; Character (125 Max). The reporting party’s name (Your company name). |
8 |
Compliance Period Code |
|
AA; Character. Indicate the compliance period for which the information is being reported. Month ranges are provided below to assist in labeling quarters:
Q1: First Quarter (January – March) Q2: Second Quarter (April – June)
Q3:
Third
Quarter
(July
–
September) |
9 |
Total volume of electricity produced |
kWh |
9999999999; Number. Total volume of electricity produced by the renewable electricity generator facility during the compliance period. |
10 |
Total volume of electricity used |
kWh |
9999999999; Number. Total volume of electricity used by the renewable electricity generator facility during the compliance period |
11 |
Comments |
|
AAAAAAA...; Character (1000 Max). Optional. Enter any necessary comments or recordkeeping information. |
Paperwork Reduction Act Statement
This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2060-####). Responses to this collection of information are mandatory (40 CFR part 80). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The public reporting and recordkeeping burden for this collection of information is estimated to be less than one hour per response. Send comments on the Agency’s need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address.