Burden Calculations Table

2258t06.xlsx

PM2.5 National Ambient Air Quality Standards (NAAQS) State Implementation Plan (SIP) Requirements Rule (Renewal)

Burden Calculations Table

OMB: 2060-0611

Document [xlsx]
Download: xlsx | pdf

Overview

PM25 ICR summary
PM25 by State
PM25Reg sum
PM25By Region
PM25 Present Value Costs
pm25annual
Updated labor rates
Reg lookup


Sheet 1: PM25 ICR summary

The annual burden to the state respondents for this information collection averaged over the first 3 years of this ICR is estimated to be a total of 74,700 labor hours at an average of 24,900 labor hours per year at an annual labor cost of $1.76 million (present value) over the 3-year period or approximately $294 thousand per state for the 6 state respondents. The average annual reporting burden is 6,225 hours per response, with approximately 2 responses per state for 12 responses. There are no capital and operating and maintenance costs associated with the proposed rule requirements. Burden is defined at 5 CFR 1320.3(b).
























labor hours:
74,700
annual labor cost:
$1,761,782
cost per state:
$293,630
State respondents:
6
hrs/response:
6,225
Responses/state:
2.00
# responses:
12

Sheet 2: PM25 by State


Data





State Max of EPA Region Count of Nonattainment Area for PM2.5 NAAQS Sum of 3-year Burden Estimate (Hours)



AK 10 1 18,000



AZ 9 1 300



CA 9 6 55,200



OR 10 1 300



PA 3 1 300



UT 8 2 600



Total Result 10 12 74,700



































State EPA Region No. of Areas or Parts of Areas Additional hours Additional hours Year 2 Additional hours Year 3
3 yr burden
Year 1

AK 10 1 6,000 6,000 6,000
18000
AZ 9 1 100 100 100
300
CA 9 6 18,400 18,400 18,400
55200
OR 10 1 100 100 100
300
PA 3 1 100 100 100
300
UT 8 2 200 200 200
600
Total 12 24,900 24,900 24,900
74700









6 12





State respondents Number of responses





Sheet 3: PM25Reg sum

EPA Region Sum of 3-year Burden Estimate (Hours) Sum of 3-year Burden Estimate (2023 Dollars)
3 300 24105
8 600 48210
9 55,500 4459425
10 18,300 $1,470,405
Total Result 74,700 6002145

Sheet 4: PM25By Region

2023 Estimated total weighted direct and indirect hourly equivalent salary 80.35













Table 1. Areas Designated Nonattainment for 1997, 2006 and/or 2012 PM2.5 NAAQS: Estimated Burden for PM2.5 NAAQS Attainment Plan or Maintenance Plan






















Nonattainment Area for PM2.5 NAAQS State EPA Region Potential Actions during ICR period 2/1/2024-1/31/2027 3-year Burden Estimate (Hours) 3-year Burden Estimate (2023 Dollars)

Fairbanks AK 10 2006 189(d) SIP Revision 18,000 $1,446,300

West Central Pinal AZ 9 2006 Maintenance Plan 300 $24,105

Imperial CA 9 2006 Maintenance Plan 300 $24,105

Los Angeles-South Coast Air Basin CA 9 2006/2012 SIP Revisions ; 1997 Maintenance Plan 18,300 $1,470,405

Plumas County CA 9 2012 SIP Revision 18,000 $1,446,300

Sacramento CA 9 2006 Maintenance Plan 300 $24,105

San Francisco CA 9 2006 Maintenance Plan 300 $24,105

San Joaquin Valley CA 9 1997/2006/2012 SIP Revisions 18,000 $1,446,300

Klamath Falls OR 10 2006 Maintenance Plan 300 $24,105

Allegheny PA 3 1997/2006/2012Maintenance Plan 300 $24,105

Provo UT 8 2006 Maintenance Plan 300 $24,105

Salt Lake City UT 8 2006 Maintenance Plan 300 $24,105

TOTAL


74,700 $6,002,145
$2,000,715







Yearly state cost (all states)

Sheet 5: PM25 Present Value Costs




EPA




Region State Total Hours by Region State Total Cost by Region Yr 1 EPA Region hrs Yr 2 EPA Region hrs Yr 3 EPA Reg. Hr EPA Regional Total Yr 1 EPA Region Cost Yr 2 EPA Region Cost Yr 3 EPA Region Cost EPA Regional Total Yr 1 EPA Region hrs (37.5) Yr 2 EPA Region hrs (37.5) Yr 3 EPA Reg. Hr (25)

3 300 $24,105 10 10 10 30 $804 $804 $804 $2,411 11 11 8

8 600 $48,210 20 20 20 60 $1,607 $1,607 $1,607 $4,821 23 23 15

9 55500 $4,459,425 1,850 1,850 1,850 5,550 $148,648 $148,648 $148,648 $445,943 2081 2081 1388

10 18300 $1,470,405 610 610 610 1,830 $49,014 $49,014 $49,014 $147,041 686 686 458

Subtotal 74,700 $6,002,145 2,490 2,490 2,490 7,470 200,072 $200,072 $200,072 $600,215 2801 2801 1868

















EPA HEADQUARTERS

249 249 249 747 $20,007 $20,007 $20,007 $60,021 280 280 187

TOTAL EPA BURDEN

2,739 2,739 2,739 8,217 $220,079 $220,079 $220,079 $660,236 3081 3081 2054

















Average Yearly Burden (hours)




82,917








States 24,900







EPA 2,739






Total 27,639









Discount rate at 8.25% Bank Prime Rate (6/16/23) Larry Sorrels




Present value costs
2nd year rate 1.171806 3rd year rate 1.268480265625



2nd year 3rd year Subtotal Total










States $1,707,377 $1,577,254 $3,284,631 $5,285,346 $1,761,781.84









EPA $187,811 $173,498 $361,309 $581,388 $193,796.00









Total $1,895,188 $1,750,751 $3,645,940 $5,866,734 $1,955,577.84











































Total 3-yr burden hours
82,917











Sheet 6: pm25annual

2023Estimated total weighted direct and indirect hourly equivalent salary 80.35























Table 1. Areas Designated Nonattainment for 1997, 2006 and/or 2012 PM2.5 NAAQS: Estimated Burden for PM2.5 NAAQS Attainment Plan or Maintenance Plan





































Nonattainment Area for PM2.5 NAAQS State EPA Region Potential Actions during ICR period 02/2024-01/2027 3-year Burden Estimate (Hours) 3-year Burden Estimate (2023 Dollars)
Yr 1 hrs Yr 2 hrs Yr 3 hrs Yr 1 cost Yr 2 cost Yr 3 cost
Fairbanks AK 10 2006 189(d) SIP Revision 18,000 $1,446,300
6,000 6,000 6,000 $482,100 $482,100 $482,100
West Central Pinal AZ 9 2006 Maintenance Plan 300 $24,105
100 100 100 $8,035 $8,035 $8,035
Imperial CA 9 2006/2012 Maintenance Plan 300 $24,105
100 100 100 $8,035 $8,035 $8,035
Los Angeles-South Coast Air Basin CA 9 2006/2012 SIP Revisions; 1997 Maintenance Plan 18,300 $1,470,405
6,100 6,100 6,100 $490,135 $490,135 $490,135
Plumas County CA 9 2012 Serious SIP Revision 18,000 $1,446,300
6,000 6,000 6,000 $482,100 $482,100 $482,100
Sacramento CA 9 2006 Maintenance Plan 300 $24,105
100 100 100 $8,035 $8,035 $8,035
San Francisco CA 9 2006 Maintenance Plan 300 $24,105
100 100 100 $8,035 $8,035 $8,035
San Joaquin Valley CA 9 1997/2006/2012 SIP Revisions 18,000 $1,446,300
6,000 6,000 6,000 $482,100 $482,100 $482,100
Klamath Falls OR 10 2006 Maintenance Plan 300 $24,105
100 100 100 $8,035 $8,035 $8,035
Allegheny PA 3 1997/2006/2012 Maintenance Plan 300 $24,105
100 100 100 $8,035 $8,035 $8,035
Provo UT 8 2006 Maintenance Plan 300 $24,105
100 100 100 $8,035 $8,035 $8,035
Salt Lake City UT 8 2006 Maintenance Plan 300 $24,105
100 100 100 $8,035 $8,035 $8,035
TOTAL


74,700 $6,002,145
24,900 24,900 24,900 $2,000,715 $2,000,715 $2,000,715

Sheet 7: Updated labor rates


2009 weighted direct salary per employee
2009 weighted indirect cost per employee
2009 Estimated total weighted direct and indirect hourly equivalent salary
LOCALITY PAY AREA GS-11 Step 3 (Staff) GS-13 Step 3 (Mgmt) 1/11 of GS-13 Step 3 GS-6 Step 6 (Support staff) 1/8 of GS-6 Step 6 Weighted direct labor estimate total
Benefits - 16% weighted labor rate Sick/Annual leave - 10% weighted labor rate Overhead - 32% weighted labor rate















SAN JOSE-SAN FRANCISCO-OAKLAND, CA


























WASHINGTON-BALTIMORE-NORTHERN VIRGINIA, DC-MD-VA-WV-


























Average labor rates $33.34 $47.51
$22.17






















Weighted direct labor estimate parts $33.34
$4.32
$2.77





















Weighted direct labor estimate total




$40.43
$6.47 $4.04 $12.94
$63.88









Subtotal $23.45





Matched if used 16% for support staff instead of 1/8 ratio















$41.20
$6.59 $4.12 $13.18
$65.10









Subtotal $23.90













































2012 weighted direct salary per employee
2012 weighted indirect cost per employee
2012 Estimated total weighted direct and indirect hourly equivalent salary
LOCALITY PAY AREA GS-11 Step 3 (Staff) GS-13 Step 3 (Mgmt) 1/11 of GS-13 Step 3 GS-6 Step 6 (Support staff) 1/8 of GS-6 Step 6 Weighted direct labor estimate total
Benefits - 16% weighted labor rate Sick/Annual leave - 10% weighted labor rate Overhead - 32% weighted labor rate















SAN JOSE-SAN FRANCISCO-OAKLAND, CA $34.74 $49.51
$23.10






















WASHINGTON-BALTIMORE-NORTHERN VIRGINIA, DC-MD-VA-WV- $31.93 $45.51
$21.23






















Average labor rates $33.34 $47.51
$22.17






















Weighted direct labor estimate parts $33.34
$4.32
$2.77





















Weighted direct labor estimate total




$40.42
$6.47 $4.04 $12.94
$63.87









Subtotal $23.45













































2023 weighted direct salary per employee
2023 weighted indirect cost per employee
2023 Estimated total weighted direct and indirect hourly equivalent salary
LOCALITY PAY AREA GS-11 Step 3 (Staff) GS-13 Step 3 (Mgmt) 1/11 of GS-13 Step 3 GS-6 Step 6 (Support staff) 1/8 of GS-6 Step 6 Weighted direct labor estimate total
Benefits - 16% weighted labor rate Sick/Annual leave - 10% weighted labor rate Overhead - 32% weighted labor rate















SAN JOSE-SAN FRANCISCO-OAKLAND, CA $43.70 $62.29
$29.06






















WASHINGTON-BALTIMORE-NORTHERN VIRGINIA, DC-MD-VA-WV- $40.17 $57.25
$26.71






















Average labor rates $41.94 $59.77
$27.89






















Weighted direct labor estimate parts $41.94
$5.43
$3.49





















Weighted direct labor estimate total




$50.85
$8.14 $5.09 $16.27
$80.35









Subtotal $29.50



Sheet 8: Reg lookup

Abbn State EPA Region
AK Alaska 10
AL Alabama 4
AR Arkansas 6
AZ Arizona 9
CA California 9
CO Colorado 8
CT Connecticut 1
DC District of Columbia 3
DE Delaware 3
FL Florida 4
GA Georgia 4
HI Hawaii 9
IA Iowa 7
ID Idaho 10
IL Illinois 5
IN Indiana 5
KS Kansas 7
KY Kentucky 4
LA Louisiana 6
MA Massachusetts 1
ME Maine 1
MD Maryland 3
MI Michigan 5
MN Minnesota 5
MO Missouri 7
MS Mississippi 4
MT Montana 8
NC North Carolina 4
ND North Dakota 8
NE Nebraska 7
NH New Hampshire 1
NJ New Jersey 2
NM New Mexico 6
NV Nevada 9
NY New York 2
OH Ohio 5
OK Oklahoma 6
OR Oregon 10
PA Pennsylvania 3
RI Rhode Island 1
SC South Carolina 4
SD South Dakota 8
TN Tennessee 4
TX Texas 6
UT Utah 8
VT Vermont 1
VA Virginia 3
WA Washington 10
WI Wisconsin 5
WV West Virginia 3
WY Wyoming 8
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy