OMB CONTROL NUMBER: 0710-0017
OMB EXPIRATION DATE: XX/XX/XXXX
AGENCY DISCLOSURE NOTICE
The public reporting burden for this collection of information, 0710-0017, is estimated to average 30 minutes per survey, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, at [email protected]. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
ROADWAY DAMAGE
The purpose of this survey is to gain information from area transportation agencies on economic losses due to roadway flooding. These estimates will be used by the Corps of Engineers in economic evaluations. Please provide any information based on damage that occurred (DATE). Note: some questions ask for total cost or number of 8-hour man-days, while others ask for material and labor. Thank you for your participation.
1. How many miles of roadway damage did your jurisdiction experience during the (DATE) flood?
________________ MILES
2. Please estimated cost of roadway repairs following the (DATE) flood:
2a. Cost to repair erosion to roadway embankment:
$____________
2b. Cost to repair roadway pavement:
$____________
2c. Cost to repair roadway shoulder:
$____________
3. Please estimate the costs to monitor roadways for flooding/safety impacts and alert public and agencies affected by an event: $________ or ________man-days
4. Please estimate the costs associated with installation and removal of detour signs and road barricades for the flood roadways in your jurisdiction: $________ or ________man-days.
5. Please estimate the costs of flood protection and other operations provided during the (DATE) flood:
5a. Sandbagging $ __________ and ________ man-days (includes installation, operation, removal and disposal)
5b. pumping materials $_________ and ________ man-days of
6. Please estimated costs of post-flood roadway clean-up the (DATE) flood:
6a. street and gutter sweeping: $________ or ________man-days
6b. cleaning of drainage structures $______total or ________ man days.
7. Please estimate the costs of additional maintenance activities for scour of critical bridges and culverts following the (DATE) flood:
7a. inspection costs: $_________total or ______ man days (per structure)
7b. scour protection measures $ _______ of materials and ______ man days
7c. debris removal on piers/abutments: $________ of materials and _______man-days (per structure)
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
Author | Schuff, Nicholas A CTR WHS ESD |
File Modified | 0000-00-00 |
File Created | 2024-07-26 |