§ 824j–1

TITLE 16—CONSERVATION

resale and notice, hearing, and determinations by Commission.
Subsec. (c). Pub. L. 102–486, § 721(4), struck out pars.
(1), (3), and (4), and substituted ‘‘which requires the
transmitting’’ for ‘‘which requires the electric’’ in introductory provisions of par. (2). Prior to amendment,
pars. (1), (3), and (4) read as follows:
‘‘(1) No order may be issued under subsection (a) of
this section unless the Commission determines that
such order would reasonably preserve existing competitive relationships.
‘‘(3) No order may be issued under the authority of
subsection (a) or (b) of this section which is inconsistent with any State law which governs the retail marketing areas of electric utilities.
‘‘(4) No order may be issued under subsection (a) or
(b) of this section which provides for the transmission
of electric energy directly to an ultimate consumer.’’
Subsec. (d). Pub. L. 102–486, § 721(5), in first sentence
substituted ‘‘transmitting’’ for ‘‘electric’’ before ‘‘utility’’ in two places, in second sentence inserted ‘‘each
affected transmitting utility,’’ before ‘‘and each affected electric utility’’, in par. (1) substituted ‘‘, or’’
for period at end of subpar. (B) and added subpar. (C),
and in par. (3)(B) substituted ‘‘transmitting’’ for ‘‘electric’’ before ‘‘utility’’.
1986—Subsec. (c)(2)(B). Pub. L. 99–495 inserted provisions that nothing in this subparagraph shall prevent
an application for an order hereunder to be filed prior
to termination or modification of an existing rate
schedule, provided that such order shall not become effective until termination of such rate schedule or the
modification becomes effective.
1980—Subsec. (a). Pub. L. 96–294 added applicability to
geothermal power producers.
EFFECTIVE DATE OF 1986 AMENDMENT
Amendment by Pub. L. 99–495 effective with respect
to each license, permit, or exemption issued under this
chapter after Oct. 16, 1986, see section 18 of Pub. L.
99–495, set out as a note under section 797 of this title.
STATE AUTHORITIES; CONSTRUCTION
Nothing in amendment by Pub. L. 102–486 to be construed as affecting or intending to affect, or in any way
to interfere with, authority of any State or local government relating to environmental protection or siting
of facilities, see section 731 of Pub. L. 102–486, set out
as a note under section 796 of this title.

§ 824j–1. Open access by unregulated transmitting utilities
(a) Definition of unregulated transmitting utility
In this section, the term ‘‘unregulated transmitting utility’’ means an entity that—
(1) owns or operates facilities used for the
transmission of electric energy in interstate
commerce; and
(2) is an entity described in section 824(f) of
this title.
(b) Transmission operation services
Subject to section 824k(h) of this title, the
Commission may, by rule or order, require an
unregulated transmitting utility to provide
transmission services—
(1) at rates that are comparable to those
that the unregulated transmitting utility
charges itself; and
(2) on terms and conditions (not relating to
rates) that are comparable to those under
which the unregulated transmitting utility
provides transmission services to itself and
that are not unduly discriminatory or preferential.

Page 1284

(c) Exemption
The Commission shall exempt from any rule
or order under this section any unregulated
transmitting utility that—
(1) sells not more than 4,000,000 megawatt
hours of electricity per year;
(2) does not own or operate any transmission
facilities that are necessary for operating an
interconnected transmission system (or any
portion of the system); or
(3) meets other criteria the Commission determines to be in the public interest.
(d) Local distribution facilities
The requirements of subsection (b) shall not
apply to facilities used in local distribution.
(e) Exemption termination
If the Commission, after an evidentiary hearing held on a complaint and after giving consideration to reliability standards established
under section 824o of this title, finds on the basis
of a preponderance of the evidence that any exemption granted pursuant to subsection (c) unreasonably impairs the continued reliability of
an interconnected transmission system, the
Commission shall revoke the exemption granted
to the transmitting utility.
(f) Application to unregulated transmitting utilities
The rate changing procedures applicable to
public utilities under subsections (c) and (d) of
section 824d of this title are applicable to unregulated transmitting utilities for purposes of
this section.
(g) Remand
In exercising authority under subsection
(b)(1), the Commission may remand transmission rates to an unregulated transmitting
utility for review and revision if necessary to
meet the requirements of subsection (b).
(h) Other requests
The provision of transmission services under
subsection (b) does not preclude a request for
transmission services under section 824j of this
title.
(i) Limitation
The Commission may not require a State or
municipality to take action under this section
that would violate a private activity bond rule
for purposes of section 141 of title 26.
(j) Transfer of control of transmitting facilities
Nothing in this section authorizes the Commission to require an unregulated transmitting
utility to transfer control or operational control
of its transmitting facilities to a Transmission
Organization that is designated to provide nondiscriminatory transmission access.
(June 10, 1920, ch. 285, pt. II, § 211A, as added Pub.
L. 109–58, title XII, § 1231, Aug. 8, 2005, 119 Stat.
955.)
§ 824k. Orders
wheeling

requiring

interconnection

or

(a) Rates, charges, terms, and conditions for
wholesale transmission services
An order under section 824j of this title shall
require the transmitting utility subject to the

