Download:
pdf |
pdfFederal Register / Vol. 89, No. 80 / Wednesday, April 24, 2024 / Notices
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: April 17, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–08716 Filed 4–23–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
khammond on DSKJM1Z7X2PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP24–672–000.
Applicants: Entergy New Orleans,
LLC, Delta States Utilities NO, LLC.
Description: Joint Petition for Limited
Waiver of Capacity Release Regulations,
et al. of Entergy New Orleans, LLC, et
al.
Filed Date: 4/17/24.
Accession Number: 20240417–5200.
Comment Date: 5 p.m. ET 4/29/24.
Docket Numbers: RP24–673–000.
Applicants: Entergy Louisiana, LLC,
Delta States Utilities LA, LLC.
Description: Joint Petition for Limited
Waiver of Capacity Release Regulations,
et al. of Entergy Louisiana, LLC et al.
Filed Date: 4/17/24.
Accession Number: 20240417–5201.
Comment Date: 5 p.m. ET 4/29/24.
Docket Numbers: RP24–674–000.
VerDate Sep<11>2014
16:48 Apr 23, 2024
Jkt 262001
Applicants: Centra Pipelines
Minnesota Inc.
Description: § 4(d) Rate Filing:
Updated Index of Shippers June 2024 to
be effective 6/1/2024.
Filed Date: 4/18/24.
Accession Number: 20240418–5073.
Comment Date: 5 p.m. ET 4/30/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: April 18, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–08780 Filed 4–23–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC24–14–000]
Commission Information Collection
Activities (FERC–921); Comment
Request; Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
31197
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection, FERC–
921, OMB Control No. 1902–0257,
Ongoing Electronic Delivery of Data
from Regional Transmission
Organization and Independent System
Operators.
SUMMARY:
Comments on the collection of
information are due June 24, 2024.
ADDRESSES: You may submit comments
(identified by Docket No. IC24–14–000)
by either of the following methods:
Electronic filing through http://
www.ferc.gov is preferred.
• Electronic Filing: Documents must
be filed in acceptable native
applications and print-to-PDF, but not
in scanned or picture format.
• For those unable to file
electronically, comments may be filed
by USPS mail or by hand (including
courier) delivery:
Æ Mail via U.S. Postal Service Only:
Addressed to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (including courier) Delivery:
Deliver to: Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/ferc-online/overview. For
user assistance, contact FERC Online
Support by email at ferconlinesupport@
ferc.gov, or by phone at (866) 208–3676
(toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/ferconline/overview.
FOR FURTHER INFORMATION CONTACT: Jean
Sonneman may be reached by email at
[email protected], telephone at
(202) 502–6362.
SUPPLEMENTARY INFORMATION:
Title: FERC–921, Ongoing Electronic
Delivery of Data from Regional
Transmission Organization and
Independent System Operators.
OMB Control No.: 1902–0257.
Type of Request: Three-year extension
of the FERC–921 information collection
requirements with no changes to the
current reporting requirements.
Abstract: The collection of data in
FERC–921 is an effort by the
Commission, implemented under Order
DATES:
E:\FR\FM\24APN1.SGM
24APN1
31198
Federal Register / Vol. 89, No. 80 / Wednesday, April 24, 2024 / Notices
No. 760,1 to detect potential anticompetitive or manipulative behavior or
ineffective market rules by requiring
Regional Transmission Organizations
(RTO) and Independent System
Operators (ISO) to electronically submit,
on a continuous basis, data relating to
physical and virtual offers and bids,
market awards, resource outputs,
marginal cost estimates, shift factors,
financial transmission rights, internal
bilateral contracts, uplift, and
interchange pricing. Although provision
was made by the Commission that
market monitoring units (MMUs) may
provide datasets, all data for this
collection has (and is expected to
continue to) come from each RTO or
ISO and not the MMUs. Therefore, any
associated burden is counted as a
burden on RTOs and ISOs.
While the ongoing delivery of data
under FERC–921 is continuous and
routine, each RTO or ISO makes
sporadic changes to its individual
market with Commission approval.
When those changes occur, the RTO or
ISO may need to change the data being
routinely sent to the Commission to
ensure compliance with Order No. 760.
Such changes typically require
respondents to alter the ongoing
delivery of data under FERC–921.
Type of Respondent: Regional
Transmission Organizations (RTOs) and
Independent System Operators (ISOs).
Estimate of Annual Burden: 2 The
Commission estimates the total annual
burden and cost for this information
collection by calculating the total hourly
cost (including both mean wages and
benefits) of three occupations and then
by multiplying that total hourly cost by
Category
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average burden & cost per
response
Total annual
burden hours
& cost
Annual cost
per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
52 hrs.;
$4,577.56.
480 hrs.;
$42,254.40.
312 hrs.;
$27,465.36.
2,880 hrs.;
$253,526,40.
$4,577.56
........................
3,192 hrs.;
$280,991.76.
46,831.96
6
1
46
..................................
6
1
6
Total ..................................................................................
6
2
12
Ongoing Electronic Delivery of Data ........................................
Data Delivery Changes Over the
Year 5
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
khammond on DSKJM1Z7X2PROD with NOTICES
the number of hours needed for each
response.
The total hourly cost applied in this
calculation is $88.03, calculated as the
sum of weighted mean hourly wages
and benefits of the following
occupations: 3
• Computer Systems Analysts
(Occupational Code: 15–1211): $56.57
(base hourly wage) ÷ 70.7% (benefits) =
$80.01 × 75 percent of the time needed
for each response = $60.0075;
• Legal (Occupational Code: 23–
0000): $104.10 (base hourly wage) ÷
70.7% (benefits) = $147.24 × 12.5
percent of the time needed for each
response = $18.405; and
• Database Administrators
(Occupational Code: 15–1242): $54.40
(base hourly wage) ÷ 70.7% (benefits) =
$76.94 × 12.5 percent of the time needed
for each response = $9.6175.
1 Enhancement of Electricity Market Surveillance
and Analysis through Ongoing Electronic Delivery
of Data from Regional Transmission Organizations
and Independent System Operators, Order No. 760,
139 FERC ¶ 61,053 (2012)
2 ‘‘Burden’’ is the total time, effort, or financial
resources expended by persons to generate,
maintain, retain, or disclose or provide information
to or for a Federal agency. For further explanation
of what is included in the information collection
burden, refer to title 5 Code of Federal Regulations
1320.3.
VerDate Sep<11>2014
16:48 Apr 23, 2024
Jkt 262001
Dated: April 18, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
ACTION:
42,254.40
Notice.
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR), Air
Emission Standards for Tanks, Surface
Impoundments and Containers (EPA
ICR Number 1593.12, OMB Control
Number 2060–0318) to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act. This is a
proposed extension of the ICR, which is
currently approved through April 30,
2024. Public comments were previously
requested via the Federal Register on
December 11, 2023 during a 60-day
comment period. This notice allows for
30 days for public comments.
SUMMARY:
[FR Doc. 2024–08778 Filed 4–23–24; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OLEM–2023–0584, FRL–11866–
01–OMS]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; Air Emission Standards for
Tanks, Surface Impoundments and
Containers (Renewal)
Comments may be submitted on
or before May 24, 2024.
AGENCY:
Environmental Protection
Agency (EPA).
DATES:
3 Costs (for wages and benefits) are based on the
mean wage estimate by the Bureau of Labor
Statistics’ (BLS) Occupational Employment and
Wage Statistics (OEWS) program from May 2023
(https://www.bls.gov/oes/current/naics2_22.htm.)
and benefits information for private industry
workers (https://www.bls.gov/news.release/
ecec.nr0.htm.)
4 Each RTO/ISO electronically submits data daily.
To match with past filings, we are considering the
collection of daily responses to be a single response.
5 The hour burden associated with a ‘‘Data
Delivery Change Over the Year’’ varies considerably
based on the significance of the specific change;
therefore, the estimate is intended to reflect the
incremental burden for an average change. Based on
historical patterns, staff estimates there to be about
one and a half changes of this nature per RTO or
ISO per year. Based on our estimate that the total
time required for a single change is 320 hours, and
there are, on average, 1.5 changes annually, the total
time for this category of response is 480 hours (1.5
× 320 hours).
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
E:\FR\FM\24APN1.SGM
24APN1
File Type | application/pdf |
File Modified | 2024-04-24 |
File Created | 2024-04-24 |