Burden Calculations Table

0660t14.xlsx

NSPS for Metal Coil Surface Coating (40 CFR part 60, subpart TT) (Renewal)

Burden Calculations Table

OMB: 2060-0107

Document [xlsx]
Download: xlsx | pdf

Overview

Summary
Table 1
Table 2
Capital O&M
Responses
Respondents


Sheet 1: Summary

ICR Summary Information
Hours per Response 39
Number of Respondents 158
Total Estimated Burden Hours 16,200
Total Estimated Costs $2,200,000
Annualized Capital O&M $151,000
Total Annual Responses 411
Form Number Not Applicable

Sheet 2: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Metal Coil Surface Coating (40 CFR Part 60, Subpart TT) (Renewal)






















Burden item (A)
Person-hours
per occurrence
(B)
Annual occurrences
per respondent
(C)
Person-hours
per respondent
per year (AxB)
(D)
Respondents
per year a
(E)
Technical hours per
year (CxD)
(F)
Management hours per year (Ex0.05)
(G)
Clerical hours
per year
(Ex0.10)
(H)
Annual cost
($) b



1. Applications N/A







Labor Rates
2. Surveys and studies N/A







Management $163.17
3. Reporting requirements








Technical $130.28
A. Familiarization with regulatory requirementsa 1 1 1 158 158 8 16 22,911.50
Clerical $65.71
B. Required activities










Initial performance test c 30 0.07 2 0 0 0 0 0.00


Repeat performance test c 30 0.07 2 0 0 0 0 0.00


C. Gather existing information See 3B









D. Write report










Notification of construction/reconstructionc 2 1 2 0 0 0 0 0.00


Notification of actual startupc 2 1 2 0 0 0 0 0.00


Notification of CMS demonstration date 2 1 2 0 0 0 0 0.00


Report of performance testc See 3B









VOC emissions reportd 5 2 10 142 1,420 71 142 205,913.49


Excess emissions reportd 5 4 20 16 320 16 32 46,403.04


Temperature variance report e 4 0.5 2 126 252 12.6 25.2 36,542.39


Subtotal for Reporting Requirements



2,473 311,770


4. Recordkeeping requirements










A. Familiarization with regulatory requirements See 3A









B. Plan activities See 3B









C. Implement activities










Monthly VOC weighted average calculationsf 1 12 12 32 384 19.2 38.4 55,683.65


D. Develop record system










Records of temperaturee 0.25 365 91.25 126 11,498 575 1,150 1,667,246.73


Records of data used to support monthly VOC calculationsf 0.25 12 3.0 32 96 4.8 9.6 13,920.91
hrs/response 39
Subtotal for Recordkeeping Requirements



13,774 1,736,851


TOTAL ANNUAL BURDEN AND COST (ROUNDED)g



16,200 2,050,000


Total CAPITAL and O&M COST (rounded)g




151,000


GRAND TOTAL (rounded)g



16,200 2,200,000














a On average, EPA estimates 158 existing sources will be subject to the NSPS. No new sources will become subject to the standard over the three-year period of this ICR. This ICR assumes each respondent will incur a burden to re-familiarize themselves with the regulatory requirements each year.


b This ICR uses the following labor rates: $163.17 ($77.70 + 110%) per hour for Executive, Administrative, and Managerial labor; $130.28 ($62.04 + 110%) per hour for Technical labor, and $65.71 ($31.29 + 110%) per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2022, “Table 2. Civilian workers by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.


c This is a one-time requirement and does not apply since no new sources are estimated. EPA assumes 20% of new sources must repeat performance testing due to failure.










d EPA assumes 10% of respondents have excess VOC emissions and must report quarterly instead of semi-annually. The remaining 90% of sources report semi-annually.


e EPA assumes 80% of facilities will use incineration, and will file a temperature variance report every other year. These facilities will also have to maintain daily temperature records of incinerator combustion temperature (for therm incineration) or gas temperature (for catalytic incineration)


f EPA assumes the remaining 20% of sources do not have control devices will comply using the monthly weighted average VOC calculation approach.


g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 3: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Metal Coil Surface Coating (40 CFR Part 60, Subpart TT) (Renewal)






















Burden item (A)
EPA
person-hours
per occurrence
(B)
Annual occurrences
per respondent
(C)
EPA person-hours
per respondent
per year (AxB)
(D)
Respondents
per year a
(E)
Technical hours
per year
(CxD)
(F)
Management
hours per year
(Ex0.05)
(G)
Clerical hours
per year
(Ex0.10)
(H)
Annual cost
($) b



Initial performance test








Labor Rates
New plantc 24 0.07 2 0 0 0 0 0
Management $73.46
Repeat performance test








Technical $54.51
New plant c 24 1 24 0 0 0 0 0
Clerical $29.50
Report review










New plantc










Notification of construction/reconstruction 2 1 2 0 0 0 0 0


Notification of actual startup 0.5 1 0.5 0 0 0 0 0


Notification of CMS demonstration date 0.5 1 0.5 0 0 0 0 0


Review test results 8 1 8 0 0 0 0 0


Existing plant










VOC emissions reportd 2 2 4 142 568 28.4 56.8 34,724


Excess emissions reportd 2 4 8 16 128 6.4 12.8 7,825


Temperature variance report e 2 0.5 1 126 126 6.3 12.6 7,703


TOTAL ANNUAL BURDEN AND COST (ROUNDED)f



945 50,300














a On average, EPA estimates 158 existing sources will be subject to the NSPS. No new sources will become subject to the standard over the three-year period of this ICR.


b The cost is based on the following labor rates: Managerial rate of $73.456 (GS-13, Step 5, $45.91 + 60%), Technical rate of $54.512 (GS-12, Step 1, $34.07 + 60%), and Clerical rate of $29.504 (GS-6, Step 3, $18.44 + 60%). These rates are from the Office of Personnel Management (OPM), 2023 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c This is a one-time requirement and does not apply since no new sources are expected.


d EPA assumes 10% of sources will have excess emissions and will file a quarterly report instead of the semi-annual frequency submitted from the other 90% of sources.


e EPA assumes 80% of facilities will use incineration, and will file a temperature variance report every other year.


f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 4: Capital O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs 

(A) (B) (C) (D) (E) (F) (G)

Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents a Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M b Total O&M,
(E X F)


Temperature Monitoring System N/A N/A $0 $1,200a 126 $151,200

Method 25 Performance Test $18,750b 0 $0 N/A N/A $0  

Total (Rounded)c

$0

$151,000
$151,000









a According to industry consultation comment received on an ICR for a related rulemaking (40 CFR part 63 subpart SSSS), the O&M cost to maintain continuous temperature measuring monitor is $1,200 per respondent. The cost covers replacement of temperature sensor each calendar year. This cost is applied to the 80 percent of respondents assumed to use an incinerator to comply with the requirements.

b Costs included to contract out for a one-time initial performance test using Method 25 or Method 25A for facilities with control devices. It is assumed that all existing facilities have conducted an initial performance test.

c Totals have been rounded to 3 significant digits. Figures may not add exactly due to rounding.


Sheet 5: Responses

Total Annual Responses
(A)
Information Collection Activity
(B)
Number of Respondents
(C)
Number of Responses
(D)
Number of Existing Respondents That Keep Records But Do Not Submit Reports
(E)
Total Annual Responses
E=(BxC)+D
Notification of construction/reconstruction 0 1 0 0
Notification of actual startup 0 1 0 0
Notification of CMS demonstration date 0 1 0 0
Notification of performance test 0 1 0 0
VOC emissions report 142 2 0 284
Excess emissions report 16 4 0 64
Temperature variance report 126 0.5 0 63



Total 411

Sheet 6: Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents





(E=A+B+C-D)
1 0 158 0 0 158
2 0 158 0 0 158
3 0 158 0 0 158
Average 0 158 0 0 158
1 New respondents include sources with constructed, reconstructed, and modified affected facilities.




File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy