Part C—Hydroelectric
§15881. Hydroelectric production incentives
(a) Incentive payments
For electric energy generated and sold by a qualified hydroelectric facility during the incentive period, the Secretary shall make, subject to the availability of appropriations, incentive payments to the owner or operator of such facility. The amount of such payment made to any such owner or operator shall be as determined under subsection (e) of this section. Payments under this section may only be made upon receipt by the Secretary of an incentive payment application which establishes that the applicant is eligible to receive such payment and which satisfies such other requirements as the Secretary deems necessary. Such application shall be in such form, and shall be submitted at such time, as the Secretary shall establish.
(b) Definitions
For purposes of this section:
(1) Qualified hydroelectric facility
The term "qualified hydroelectric facility" means a turbine or other generating device owned or solely operated by a non-Federal entity—
(A) that generates hydroelectric energy for sale; and
(B)(i) that is added to an existing dam or conduit; or
(ii)(I) that has a generating capacity of not more than 20 megawatts;
(II) for which the non-Federal entity has received a construction authorization from the Federal Energy Regulatory Commission, if applicable; and
(III) that is constructed in an area in which there is inadequate electric service, as determined by the Secretary, including by taking into consideration—
(aa) access to the electric grid;
(bb) the frequency of electric outages; or
(cc) the affordability of electricity.
(2) Existing dam or conduit
The term "existing dam or conduit" means any dam or conduit the construction of which was completed before November 15, 2021, and which does not require any construction or enlargement of impoundment or diversion structures (other than repair or reconstruction) in connection with the installation of a turbine or other generating device.
(3) Conduit
The term "conduit" has the same meaning as when used in
The terms defined in this subsection shall apply without regard to the hydroelectric kilowatt capacity of the facility concerned, without regard to whether the facility uses a dam owned by a governmental or nongovernmental entity, and without regard to whether the facility begins operation on or after November 15, 2021.
(c) Eligibility window
Payments may be made under this section only for electric energy generated from a qualified hydroelectric facility which begins operation during the period of 22 fiscal years beginning with the first full fiscal year occurring after August 8, 2005.
(d) Incentive period
A qualified hydroelectric facility may receive payments under this section for a period of 10 fiscal years (referred to in this section as the "incentive period"). Such period shall begin with the fiscal year in which electric energy generated from the facility is first eligible for such payments.
(e) Amount of payment
(1) In general
Payments made by the Secretary under this section to the owner or operator of a qualified hydroelectric facility shall be based on the number of kilowatt hours of hydroelectric energy generated by the facility during the incentive period. For any such facility, the amount of such payment shall be 1.8 cents per kilowatt hour (adjusted as provided in paragraph (2)), subject to the availability of appropriations under subsection (g), except that no facility may receive more than $1,000,000 in 1 calendar year.
(2) Adjustments
The amount of the payment made to any person under this section as provided in paragraph (1) shall be adjusted for inflation for each fiscal year beginning after calendar year 2005 in the same manner as provided in the provisions of
(f) Sunset
No payment may be made under this section to any qualified hydroelectric facility after the expiration of the period of 32 fiscal years beginning with the first full fiscal year occurring after August 8, 2005, and no payment may be made under this section to any such facility after a payment has been made with respect to such facility for a period of 10 fiscal years.
(g) Authorization of appropriations
There is authorized to be appropriated to the Secretary to carry out this section $125,000,000 for fiscal year 2022, to remain available until expended.
(
Editorial Notes
Amendments
2021—Subsec. (b).
Subsec. (b)(2).
Subsec. (e)(1).
Subsec. (g).
2020—Subsec. (b)(1).
Subsec. (c).
Subsec. (e)(2).
Subsec. (f).
Subsec. (g).
Statutory Notes and Related Subsidiaries
Wage Rate Requirements
For provisions relating to rates of wages to be paid to laborers and mechanics on projects for construction, alteration, or repair work funded under div. D or an amendment by div. D of
§15882. Hydroelectric efficiency improvement incentives
(a) Incentive payments
The Secretary shall make incentive payments to the owners or operators of hydroelectric facilities at existing dams to be used to make capital improvements in the facilities that are directly related to improving the efficiency of such facilities by at least 3 percent.
(b) Limitations
Incentive payments under this section shall not exceed 30 percent of the costs of the capital improvement concerned and not more than 1 payment may be made with respect to improvements at a single facility. No payment in excess of $5,000,000 may be made with respect to improvements at a single facility in any 1 fiscal year.
(c) Authorization of appropriations
There is authorized to be appropriated to carry out this section $75,000,000 for fiscal year 2022 to remain available until expended.
(
Editorial Notes
Amendments
2021—
Subsec. (b).
Subsec. (c).
2020—Subsec. (c).
Statutory Notes and Related Subsidiaries
Wage Rate Requirements
For provisions relating to rates of wages to be paid to laborers and mechanics on projects for construction, alteration, or repair work funded under div. D or an amendment by div. D of
§15883. Maintaining and enhancing hydroelectricity incentives
(a) Definition of qualified hydroelectric facility
In this section, the term "qualified hydroelectric facility" means a hydroelectric project that—
(1)(A) is licensed by the Federal Energy Regulatory Commission; or
(B) is a hydroelectric project constructed, operated, or maintained pursuant to a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to the Federal Power Act (
(2) is placed into service before November 15, 2021; and
(3)(A) is in compliance with all applicable Federal, Tribal, and State requirements; or
(B) would be brought into compliance with the requirements described in subparagraph (A) as a result of the capital improvements carried out using an incentive payment under this section.
(b) Incentive payments
The Secretary shall make incentive payments to the owners or operators of qualified hydroelectric facilities for capital improvements directly related to—
(1) improving grid resiliency, including—
(A) adapting more quickly to changing grid conditions;
(B) providing ancillary services (including black start capabilities, voltage support, and spinning reserves);
(C) integrating other variable sources of electricity generation; and
(D) managing accumulated reservoir sediments;
(2) improving dam safety to ensure acceptable performance under all loading conditions (including static, hydrologic, and seismic conditions), including—
(A) the maintenance or upgrade of spillways or other appurtenant structures;
(B) dam stability improvements, including erosion repair and enhanced seepage controls; and
(C) upgrades or replacements of floodgates or natural infrastructure restoration or protection to improve flood risk reduction; or
(3) environmental improvements, including—
(A) adding or improving safe and effective fish passage, including new or upgraded turbine technology, fish ladders, fishways, and all other associated technology, equipment, or other fish passage technology to a qualified hydroelectric facility;
(B) improving the quality of the water retained or released by a qualified hydroelectric facility;
(C) promoting downstream sediment transport processes and habitat maintenance; and
(D) improving recreational access to the project vicinity, including roads, trails, boat ingress and egress, flows to improve recreation, and infrastructure that improves river recreation opportunity.
(c) Limitations
(1) Costs
Incentive payments under this section shall not exceed 30 percent of the costs of the applicable capital improvement.
(2) Maximum amount
Not more than 1 incentive payment may be made under this section with respect to capital improvements at a single qualified hydroelectric facility in any 1 fiscal year, the amount of which shall not exceed $5,000,000.
(d) Authorization of appropriations
There is authorized to be appropriated to the Secretary to carry out this section $553,600,000 for fiscal year 2022, to remain available until expended.
(
Editorial Notes
References in Text
The Federal Power Act, referred to in subsec. (a)(1)(B), is act June 10, 1920, ch. 285,
Statutory Notes and Related Subsidiaries
Wage Rate Requirements
For provisions relating to rates of wages to be paid to laborers and mechanics on projects for construction, alteration, or repair work funded under div. D or an amendment by div. D of