Burden Calculation Tables

1601t11.xlsx

Air Pollution Regulations for Outer Continental Shelf Activities (Renewal)

Burden Calculation Tables

OMB: 2060-0249

Document [xlsx]
Download: xlsx | pdf

Overview

README
Appendix A-1
Appendix A-2
Ex1 (Exp)
Ex2 (AE)
Ex3 (Prod)
Ex4 (Exp)
Ex5 (AE)
Ex6 (Prod)
Ex7 (Exp)
Ex8 (AE)
Ex9 (Prod)
Respondent Summary
Ex10 (Exp)
Ex11 (AE)
Ex12 (Prod)
Ex13
Ex14


Sheet 1: README

README File for EPA Information Collection Request Number 1601.10 for Outer Continental Shelf (OCS) Activities

Burden Estimates for 3-year period: June 1, 2024 - May 31, 2027




Exhibit (Ex) tabs are color-coded to represent annual burden to industry (in orange), State/Local Agencies (in green), and the EPA (in blue).


Exhibit Annual Burden To:

Ex1 to Ex6 Industry

Ex7 to Ex9 State/Local Agencies

Ex10 to Ex13 EPA

Note: Ex14 provides a summary of the combined annual burden and costs for industry, State/Local agencies, and the EPA.



Exhibits are organized by four types of OCS activities: oil and gas phases (Exp, Cons, or Prod) or alternative energy (AE).


Exp Oil and Gas Exploration (Phase 1)

Cons Oil and Gas Construction (Phase 2)

Prod Oil and Gas Development/Production (Phase 3)

AE Alternative Energy



OCS activities are authorized under the EPA or State/Local Agencies.


Exhibits Permitting Authority

Ex1 (Exp) Industry Permit Burden to EPA

Ex2 (AE) Industry Permit Burden to EPA

Ex3 (Prod) Industry Permit Burden to EPA

Ex4 (Exp) Industry Permit Burden to State/Local

Ex5 (AE) Industry Permit Burden to State/Local

Ex6 (Prod) Industry Permit Burden to State/Local

Ex7 (Exp) State/Local Permit Review Burden

Ex8 (AE) State/Local Permit Review Burden

Ex9 (Prod) State/Local Permit Review Burden

Ex10 (Exp) EPA Permit Review Burden

Ex11 (AE) EPA Permit Review Burden

Ex12 (Prod) EPA Permit Review Burden

Ex13 EPA Annual Burden related to consistency updates and overseeing State/Local Activities



NOTE: This entire excel file is a draft document for public review and comment - do not quote or cite


Sheet 2: Appendix A-1



Appendix A-1





LABOR RATES










Contractor Rates [1]






2023 Hourly Hourly Wage Rate Benefits, Overhead & Profit Total


$108.00 $48.88 2.2 $107.54








Respondent Rates [2]






2023 Hourly Hourly Wage Rate Benefits & Overhead Total


$101.00 $50.43 2 $100.86








State/Local Agency Rates [3]






2023 Hourly Hourly Wage Rate Benefits & Overhead Total


$92.00 $46.19 2 $92.38








EPA Rates [4]






2023 Hourly Hourly Wage Rate Benefits Total


$62.00 $38.61 1.6 $61.78








[1] Industry contractor rate based on mean hourly wages for Environmental Engineers obtained from "Occupational Employment and Wages, May 2022; 17-2081 Environmental Engineers" U.S. Deaprtment of Labor, Bureau of Labor Statistics. (http://www.bls.gov/oes/current/oes172081.htm accessed in November 2023) Benfits and overhead assumed to total 100% of wages; profit margin assumed to be 10% on top of "loaded" total. See wage escalation calculations below.
[2] Respondent in-house rate based on mean hourly wages for Environmental Engineers obtained from "Occupational Employment and Wages, May 2022; 17-2081 Environmental Engineers" U.S. Deaprtment of Labor, Bureau of Labor Statistics. (http://www.bls.gov/oes/current/oes172081.htm accessed in November 2023) Benfits and overhead assumed to total 100% of wages. See wage escalation calculations below.
[3] State/Local rates based on 25th percentile hourly wages for Environmental Engineers obtained from "Occupational Employment and Wages, May 2022; 17-2081 Environmental Engineers" U.S. Deaprtment of Labor, Bureau of Labor Statistics. (http://www.bls.gov/oes/current/oes172081.htm accessed in November 2023) Benfits and overhead assumed to total 100% of wages. See wage escalation calculations below.
[4] Federal Labor Cost obtained from U.S. Office of Personnel Management 2023 General Schedule Table 2023-GS. Hourly labor rate assumed is GS-12, Step 5 (Technical Labor). 60% benefits assumed. See https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2023/GS_h.pdf. Accessed November 2023.














WAGE ESCALATION CALCULATIONS












Industry contractor and in-house hourly wage rate





48.88 May 2022 http://www.bls.gov/oes/current/oes172081.htm


Mean hourly wage for Environmental Engineers = $48.88/hr

Escalating to June 2023 using the Employment Cost Index (ECI) for wages and salaries for Private Industry Workers - All Workers found at https://www.bls.gov/eci/home.htm#data. accessed November 13, 2023





ECI Sept 2022 =
154.1



ECI June 2023 =
159.0
(Note that September 2023 was the most recent ECI available the when website accessed 11/13/23)
50.43 June 2023 wages in $/hr
hourly wage May 2022 x (ECI Sept 2022/ECI June 2023)









State/Local hourly wage rate





45.1 May-22 http://www.bls.gov/oes/current/oes172081.htm


25th percentile hourly wage for Environmental Engineers = $36.32/hr

Escalating to June 2023 using the Employment Cost Index (ECI) for wages and salaries for State and Local Government Workers - Public Administration found at https://www.bls.gov/eci/home.htm#data. accessed November 13, 2023





ECI Sept 2022 =
157.4



ECI June 2023 =
161.2
(Note that September 2023 was the most recent ECI available the when website accessed 11/13/23)
46.19 June 2023 wages in $/hr
hourly wage May 2022 x (ECI Sept 2022/ECI June 2023)



Sheet 3: Appendix A-2


Appendix A-2


Universe of Respondents





Estimates


Sources under EPA authority

# New exploration sources 1 represents the number of expected oil and gas exploration permits to be issued during ICR period
# Existing exploration sources 1 represents the number of existing oil and gas exploration permits at the start of the ICR period
# Exploration wells to be drilled 1 projected exploration well in this ICR period
# New development/production sources 1

# Existing development/production sources 9

# Decommissioning sources 0

# Construction mod to existing sources 0

# New alternative energy sources 24 projected number of wind farms to be permitted for this ICR period
# Existing alternative energy sources 9 existing wind farms already permitted




Sources under state/local authority


# New exploration sources 0

# Existing exploration sources 0

# Exploration wells to be drilled 0

# New development/production sources 0

# Existing development/production sources 24

# Decommissioning sources 3

# Construction mod to existing sources 2

# New alternative energy sources 3

# Existing alternative energy sources 2

Total Number of Sources 74 does not include # exploration wells (row 8) or modified existing sources (row 18) as this would be double counting




State/local agencies overseeing sources 7 Three (3) states (Delaware,Maryland, and Virginia) and the four (4) California local agencies (South Coast Air Quality Management District CA, Ventura County Air Pollution Control District CA, Santa Barbara Air Pollution Control District CA, San Luis Obispo Air Pollution Control District) CA




Total Number of Respondents 81





Most activity for OCS has been with the development of alternative energy sources (windfarms mainly along the eastern seaboard)



Sheet 4: Ex1 (Exp)

EXHIBIT 1. NEW AND PREVIOUSLY PERMITTED EXPLORATION SOURCES UNDER EPA AUTHORITY




















RESPONDENTS' ANNUAL BURDEN

























Respondent Labor O&M






Collection Activities Number of Respondents Frequency of Action in 3 Year Period Occurrences per year Industry Hours per Occurrence1 Industry Labor Hours Per Year Industry Labor Cost per Occurrence Industry Labor Costs Per Year Contractors Hours per Occurrence Contractor Labor Hours Per Year Contractors Dollars per Occurrence Contractor Labor Costs Per Year Non-Labor Contractor O&M Costs per Occurrence Non-Labor Contractor O&M Costs per Year TOTAL O&M Cost Per Occurance Total O&M Costs per Year Capital Costs per Occurrence Total Capital Costs per Year Total Non-Labor Costs Per Year Total Costs Per Year


Labor Rates




$101.00


$108.00











Read regulations2 1 1 0.33 5.00 1.67 $505.00 $168.33 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $168.33


Consult with EPA2 1 1 0.33 5.00 1.67 $505.00 $168.33 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $168.33


Prepare a NOI to construct2 1 1 0.33 30.00 10.00 $3,030.00 $1,010.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,010.00


Prepare major source permit application3 1 1 0.33 50.00 16.67 $5,050.00 $1,683.33 293.00 97.67 $31,644.00 $10,548.00 $0.00 $0.00 $31,644.00 $10,548.00 $0.00 $0.00 $10,548.00 $12,231.33


Prepare minor source permit application3 0 1 0.00 25.00 0.00 $2,525.00 $0.00 146.00 0.00 $15,768.00 $0.00 $0.00 $0.00 $15,768.00 $0.00 $0.00 $0.00 $0.00 $0.00


Perform initial compliance test4 1 1 0.33 100.00 33.33 $10,100.00 $3,366.67 764.00 254.67 $82,512.00 $27,504.00 $0.00 $0.00 $82,512.00 $27,504.00 $0.00 $0.00 $27,504.00 $30,870.67


Prepare operating permit application5 1 1 0.33 42.00 14.00 $4,242.00 $1,414.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,414.00


Conduct record keeping and report data to EPA4 1 3 1.00 32.00 32.00 $3,232.00 $3,232.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,232.00


Total
Responses per Year** 3.00
109
$11,043
352
$38,052
$0
$38,052
$0 $38,052 $49,095

























1. Assumes hours per occurrence is the same as that in the 1998 ICR, except hours added for preparing permit applications





















2. Assumes all new permittees must perform these tasks





















3. Assumes all new permits are major sources permits





















4. Assumes that testing, monitoring, recordkeeping and reporting are required only when an exploratory well is actually drilled





















5. Assumes that all new major source permittees also incorporate operating permit requirements at the same time












































**This number is used in the summary (Exhibit 14)
















































































































































































































































































































































































































































































































































Sheet 5: Ex2 (AE)

EXHIBIT 2. NEW AND PREVIOUSLY PERMITTED ALTERNATIVE ENERGY SOURCES UNDER EPA AUTHORITY




















RESPONDENTS' ANNUAL BURDEN

























Respondent Labor O&M






Collection Activities Number of Respondents Frequency of Action in 3 Year Period Occurrences per year Industry Hours per Occurrence1 Industry Labor Hours Per Year Industry Labor Cost per Occurrence Industry Labor Costs Per Year Contractors Hours per Occurrence Contractor Labor Hours Per Year Contractors Dollars per Occurrence Contractor Labor Costs Per Year Non-Labor Contractor O&M Costs per Occurrence Non-Labor Contractor O&M Costs per Year TOTAL O&M Cost Per Occurance Total O&M Costs per Year Capital Costs per Occurrence Total Capital Costs per Year Total Non-Labor Costs Per Year Total Costs Per Year


Labor Rates




$101.00


$108.00











Read regulations2 24 1 8.00 5 40.00 $505.00 $4,040.00 0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,040.00


Consult with EPA2 24 1 8.00 5 40.00 $505.00 $4,040.00 0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,040.00


Prepare a NOI to construct2 24 1 8.00 30 240.00 $3,030.00 $24,240.00 0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $24,240.00


Prepare major source permit application3 24 1 8.00 50 400.00 $5,050.00 $40,400.00 293 2344.00 $31,644.00 $253,152.00 $0.00 $0.00 $31,644.00 $253,152.00 $0.00 $0.00 $253,152.00 $293,552.00


Prepare minor source permit application3 0 1 0.00 25 0.00 $2,525.00 $0.00 146 0.00 $15,768.00 $0.00 $0.00 $0.00 $15,768.00 $0.00 $0.00 $0.00 $0.00 $0.00


Perform initial and annual performance testing4 24 1 8.00 100 800.00 $10,100.00 $80,800.00 40 320.00 $4,320.00 $34,560.00 $0.00 $0.00 $4,320.00 $34,560.00 $0.00 $0.00 $34,560.00 $115,360.00


Prepare operating permit application4 28 1 9.33 42 392.00 $4,242.00 $39,592.00 0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $39,592.00


Conduct record keeping and report data to EPA5 33 3 33.00 32 1,056.00 $3,232.00 $106,656.00 0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $106,656.00


Total
Responses per Year** 82.33
2,968
$299,768
2,664
$287,712
$0
$287,712
$0 $287,712 $587,480

























1. Assumes hours per occurrence is the same as that in the 1998 ICR, except hours added for preparing permit applications





















2. Assumes all new permittees must perform these tasks





















3. Assumes all new permits are major source permits because all permitting at this time is for construction/operation.





















4. Assumes that all new major source permittees also incorporate operating permit requirements at the same time.





















5. Assumes that all new and existing permittees must conduct recordkeeping and reporting during each year of the ICR period



































































**This number is used in the summary (Exhibit 14)

























































































































































































































































































































































































































































































































Sheet 6: Ex3 (Prod)

EXHIBIT 3. NEW AND PREVIOUSLY PERMITTED DEVELOPMENT/PRODUCTION SOURCES UNDER EPA AUTHORITY




















RESPONDENTS' ANNUAL BURDEN

























Respondent Labor O&M






Collection Activities Number of Respondents Frequency of Action in 3 Year Period Occurrences per year Industry Hours per Occurrence1 Industry Labor Hours Per Year Industry Labor Cost per Occurrence Industry Labor Costs Per Year Contractors Hours per Occurrence Contractor Labor Hours Per Year Contractors Dollars per Occurrence Contractor Labor Costs Per Year Non-Labor Contractor O&M Costs per Occurrence Non-Labor Contractor O&M Costs per Year TOTAL O&M Cost Per Occurance Total O&M Costs per Year Capital Costs per Occurrence Total Capital Costs per Year Total Non-Labor Costs Per Year Total Costs Per Year


Labor Rates




$101.00


$108.00











Read regulations2 $ 1 0.33 5.00 1.67 $505.00 $168.33 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $168.33


Consult with EPA2 1 1 0.33 5.00 1.67 $505.00 $168.33 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $168.33


Prepare a NOI to construct 1 1 0.33 30.00 10.00 $3,030.00 $1,010.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,010.00


Prepare preconstruction permit application 1 1 0.33 100.00 33.33 $10,100.00 $3,366.67 585.00 195.00 $63,180.00 $21,060.00 $0.00 $0.00 $63,180.00 $21,060.00 $0.00 $0.00 $21,060.00 $24,426.67


Prepare minor modification permit application5 0 1 0.00 50.00 0.00 $5,050.00 $0.00 293.00 0.00 $31,644.00 $0.00 $0.00 $0.00 $31,644.00 $0.00 $0.00 $0.00 $0.00 $0.00


Prepare major modification permit application 0 1 0.00 100.00 0.00 $10,100.00 $0.00 585.00 0.00 $63,180.00 $0.00 $0.00 $0.00 $63,180.00 $0.00 $0.00 $0.00 $0.00 $0.00


Perform initial and annual compliance test 1 3 1.00 100.00 100.00 $10,100.00 $10,100.00 764.00 764.00 $82,512.00 $82,512.00 $0.00 $0.00 $82,512.00 $82,512.00 $0.00 $0.00 $82,512.00 $92,612.00


Prepare operating permit application 5 1 1.80 42.00 75.60 $4,242.00 $7,635.60 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7,635.60


Conduct record keeping and report data to EPA4 10 3 10.00 64.00 640.00 $6,464.00 $64,640.00 0.00 0.00 $0.00 $0.00 $1,625.52 $16,255.20 $1,625.52 $16,255.20 $32,510.40 $325,104.04 $341,359.24 $405,999.24


Decommissioning6 0 1 0.00 174.00 0.00 $17,574.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00


Total
Responses per Year** 14.13
862
$87,089
959
$103,572
$16,255
$119,827
$325,104 $444,931 $532,020

























1. Assumes hours per occurrence is the same as that in the 1998 ICR





















2. Assumes O&M is 5 percent of capital costs





















3. Capital costs calculated using the June 2019 final CEPCI index cost of $28,662.00 to 2022 dollars by the following: (2019 value)*(DEFLATOR2022/ DEFLATOR1998) Table 1.1.9. Implicit Price Deflators for Gross Product [Index numbers, 2012=100], frequency = annual Source: Bureau of Economic Analysis, https://fred.stlouisfed.org. Last Updated on: September 28, 2023 (annual deflators: https://fred.stlouisfed.org/series/A191RD3A086NBEA)







4. Assumes that all permittees must conduct recordkeeping and reporting during each year of the ICR period





















5. Assumes 2 of the existing sources will undergo minor NSR preconstruction permitting for changes at their facilities.





















6. Decommissioning is guestimated to result in 174 hrs of burden per occurrence which would involve reading regulations (5 hrs), consulting with EPA (5 hrs), preparing permit application (100 hrs), and conducting record keeping and reporting data to EPA (64 hrs).












































**This number is used in the summary (Exhibit 14)

























































































































































































































































































































































































































































































































Sheet 7: Ex4 (Exp)

EXHIBIT 4. NEW AND PREVIOUSLY PERMITTED EXPLORATION SOURCES UNDER STATE/LOCAL AUTHORITY




















RESPONDENTS' ANNUAL BURDEN

























Respondent Labor O&M






Collection Activities Number of Respondents Frequency of Action in 3 Year Period Occurrences per year Industry Hours per Occurrence1 Industry Labor Hours Per Year Industry Labor Cost per Occurrence Industry Labor Costs Per Year Contractors Hours per Occurrence Contractor Labor Hours Per Year Contractors Dollars per Occurrence Contractor Labor Costs Per Year Non-Labor Contractor O&M Costs per Occurrence Non-Labor Contractor O&M Costs per Year TOTAL O&M Cost Per Occurance Total O&M Costs per Year Capital Costs per Occurrence Total Capital Costs per Year Total Non-Labor Costs Per Year Total Costs Per Year


Labor Rates




$101.00


$108.00











Read regulations2 0 1 0.00 5.00 0.00 $505.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00


Consult with EPA2 0 1 0.00 5.00 0.00 $505.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00


Prepare a NOI to construct2 0 1 0.00 30.00 0.00 $3,030.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00


Prepare major source permit application3 0 1 0.00 50.00 0.00 $5,050.00 $0.00 293.00 0.00 $31,644.00 $0.00 $0.00 $0.00 $31,644.00 $0.00 $0.00 $0.00 $0.00 $0.00


Prepare minor source permit application3 0 1 0.00 25.00 0.00 $2,525.00 $0.00 146.00 0.00 $15,768.00 $0.00 $0.00 $0.00 $15,768.00 $0.00 $0.00 $0.00 $0.00 $0.00


Perform initial compliance test4 0 1 0.00 100.00 0.00 $10,100.00 $0.00 764.00 0.00 $82,512.00 $0.00 $0.00 $0.00 $82,512.00 $0.00 $0.00 $0.00 $0.00 $0.00


Prepare operating permit application5 0 1 0.00 42.00 0.00 $4,242.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00


Conduct record keeping and report data to EPA4 0 3 0.00 32.00 0.00 $3,232.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00


Total
Responses per Year** 0.00
0
$0
0
$0
$0
$0
$0 $0 $0

























1. Assumes hours per occurrence is the same as that in the 1998 ICR





















2. Assumes all new permittees must perform these tasks





















3. Assumes all new permits are major sources permits





















4. Assumes that testing, monitoring, recordkeeping and reporting are required only when an exploratory well is actually drilled





















5. Assumes that all new major source permittees also incorporate operating permit requirements at the same time



































































**This number is used in the summary (Exhibit 14)

























































































































































































































































































































































































































































































































Sheet 8: Ex5 (AE)

EXHIBIT 5. NEW AND PREVIOUSLY PERMITTED ALTERNATIVE ENERGY SOURCES UNDER STATE/LOCAL AUTHORITY




















RESPONDENTS' ANNUAL BURDEN

























Respondent Labor O&M






Collection Activities Number of Respondents Frequency of Action in 3 Year Period Occurrences per year Industry Hours per Occurrence1 Industry Labor Hours Per Year Industry Labor Cost per Occurrence Industry Labor Costs Per Year Contractors Hours per Occurrence Contractor Labor Hours Per Year Contractors Dollars per Occurrence Contractor Labor Costs Per Year Non-Labor Contractor O&M Costs per Occurrence Non-Labor Contractor O&M Costs per Year TOTAL O&M Cost Per Occurance Total O&M Costs per Year Capital Costs per Occurrence Total Capital Costs per Year Total Non-Labor Costs Per Year Total Costs Per Year


Labor Rates




$101.00


$108.00











Read regulations2 3 1 1.00 5.00 5.00 $505.00 $505.00 0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $505.00


Consult with EPA2 3 1 1.00 5.00 5.00 $505.00 $505.00 0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $505.00


Prepare a NOI to construct2 3 1 1.00 30.00 30.00 $3,030.00 $3,030.00 0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,030.00


Prepare major source permit application3 3 1 1.00 50.00 50.00 $5,050.00 $5,050.00 293 293.00 $31,644.00 $31,644.00 $0.00 $0.00 $31,644.00 $31,644.00 $0.00 $0.00 $31,644.00 $36,694.00


Prepare minor source permit application3 0 1 0.00 25.00 0.00 $2,525.00 $0.00 146 0.00 $15,768.00 $0.00 $0.00 $0.00 $15,768.00 $0.00 $0.00 $0.00 $0.00 $0.00


Perform initial and annual performance testing4 3 1 1.00 100.00 100.00 $10,100.00 $10,100.00 40 40.00 $4,320.00 $4,320.00 $0.00 $0.00 $4,320.00 $4,320.00 $0.00 $0.00 $4,320.00 $14,420.00


Prepare operating permit application4 3 1 1.00 42.00 42.00 $4,242.00 $4,242.00 0 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,242.00


Conduct record keeping and report data to EPA5 5 3 5.00 32.00 160.00 $3,232.00 $16,160.00 0 0.00 $0.00 $0.00 $1,625.52 $8,127.60 $1,625.52 $8,127.60 $32,510.40 $162,552.00 $170,679.60 $186,839.60


Total
Responses per Year** 11.00
392
$39,592
333
$35,964
$8,128
$44,092
$162,552 $206,644 $246,236

























1. Assumes hours per occurrence is the same as that in the 1998 ICR, except hours added for preparing permit applications





















2. Assumes all new permittees must perform these tasks





















3. Assumes all new permits are major source permits because all permitting at this time is for construction/operation.





















4. Assumes that all new major source permittees also incorporate operating permit requirements at the same time





















5. Assumes that all new and existing permittees must conduct recordkeeping and reporting during each year of the ICR period





















6. Assumes O&M is 5 percent of capital costs





















7. Capital costs calculated using the June 2019 final CEPCI index cost of $28,662.00 to 2022 dollars by the following: (2019 value)*(DEFLATOR2022/ DEFLATOR1998) Table 1.1.9. Implicit Price Deflators for Gross Product [Index numbers, 2012=100], frequency = annual Source: Bureau of Economic Analysis, https://fred.stlouisfed.org. Last Updated on: September 28, 2023 (annual deflators: https://fred.stlouisfed.org/series/A191RD3A086NBEA)







**This number is used in the summary (Exhibit 14)

























































































































































































































































































































































































































































































































Sheet 9: Ex6 (Prod)

EXHIBIT 6. EXISTING DEVELOPMENT/PRODUCTION SOURCES UNDER STATE/LOCAL AUTHORITY




















RESPONDENTS' ANNUAL BURDEN

























Respondent Labor O&M






Collection Activities Number of Respondents Frequency of Action in 3 Year Period Occurrences per year Industry Hours per Occurrence1 Industry Labor Hours Per Year Industry Labor Cost per Occurrence Industry Labor Costs Per Year Contractors Hours per Occurrence Contractor Labor Hours Per Year Contractors Dollars per Occurrence Contractor Labor Costs Per Year Non-Labor Contractor O&M Costs per Occurrence Non-Labor Contractor O&M Costs per Year TOTAL O&M Cost Per Occurance Total O&M Costs per Year Capital Costs per Occurrence Total Capital Costs per Year Total Non-Labor Costs Per Year Total Costs Per Year


Labor Rates




$101.00


$108.00











Read regulations2 0.0 1 0.00 5.00 0.00 $505.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00


Consult with EPA2 0.0 1 0.00 5.00 0.00 $505.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00


Prepare a NOI to construct 14.4 1 4.80 42.00 201.60 $4,242.00 $20,361.60 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20,361.60


Prepare preconstruction permit application 24.0 3 24.00 100.00 2,400.00 $10,100.00 $242,400.00 764.00 18336.00 $82,512.00 $1,980,288.00 $0.00 $0.00 $82,512.00 $1,980,288.00 $0.00 $0.00 $1,980,288.00 $2,222,688.00


Prepare minor modification permit application5 24.0 3 24.00 64.00 1,536.00 $6,464.00 $155,136.00 0.00 0.00 $0.00 $0.00 $1,625.52 $39,012.49 $1,625.52 $39,012.49 $0.00 $0.00 $39,012.49 $194,148.49


Prepare major modification permit application 2.0 1 0.67 30.00 20.00 $3,030.00 $2,020.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,020.00


Perform initial and annual compliance test 0.0 1 0.00 100.00 0.00 $10,100.00 $0.00 585.00 0.00 $63,180.00 $0.00 $0.00 $0.00 $63,180.00 $0.00 $0.00 $0.00 $0.00 $0.00


Prepare operating permit application 2.0 1 0.67 50.00 33.33 $5,050.00 $3,366.67 293.00 195.33 $31,644.00 $21,096.00 $0.00 $0.00 $31,644.00 $21,096.00 $0.00 $0.00 $21,096.00 $24,462.67


Conduct record keeping and report data to EPA4 0.0 1 0.00 100.00 0.00 $10,100.00 $0.00 585.00 0.00 $63,180.00 $0.00 $0.00 $0.00 $63,180.00 $0.00 $0.00 $0.00 $0.00 $0.00


Decommissioning6 3.0 1 1.00 174.00 174.00 $17,574.00 $17,574.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $17,574.00


Total
Responses per Year** 55.13
4,365
$440,858
18,531
$2,001,384
$39,012
$2,040,396
$0 $2,040,396 $2,481,255

























1. Assumes hours per occurrence is the same as that in the 1998 ICR, except that hours for minor preconstruction permit are half the major source level





















2. Assumes O&M is 5 percent of capital costs





















3. Because these are 5-year permits, assumes that 60 percent of existing sources will renew their operating permits during the 3 years of the ICR period





















4. Assumes that all permittees must conduct recordkeeping and reporting during each year of the ICR period





















5. Assumes 2 of the existing sources will undergo minor NSR preconstruction permitting for changes at their facilities.





















6. Decommissioning is guestimated to result in 174 hrs of burden per occurrence which would involve reading regulations (5 hrs), consulting with State/Local authority (5 hrs), preparing permit application (100 hrs), and conducting record keeping and reporting data to State/Local Authority (64 hrs).






























**This number is used in the summary (Exhibit 14)

























































































































































































































































































































































































































































































































Sheet 10: Ex7 (Exp)

EXHIBIT 7. NEW AND PREVIOUSLY PERMITTED EXPLORATION SOURCES UNDER STATE/LOCAL AUTHORITY











STATE/LOCAL AGENCIES' ANNUAL BURDEN
























Collection Activities Number of Respondents Number of Occurrences for 3 years Occurrences per year Hours per Occurrence1 Cost per Occurrence Total Hours per Year Total Cost per Year




Labor Rate



$92.00






Consult with sources2 0 1 0.00 5 $460.00 0 $0.00




Review NOI to construct and minor permit application3 0 1 0.00 131 $12,052.00 0 $0.00




Review NOI to construct and major permit application3 0 1 0.00 263 $24,196.00 0 $0.00




Review operating permit application4 0 1 0.00 40 $3,680.00 0 $0.00




Oversee initial compliance test5 0 1 0.00 67 $6,164.00 0 $0.00




Conduct inspections 0 2 0.00 16 $1,472.00 0 $0.00




Review data reports5 0 1 0.00 8 $736.00 0 $0.00






Responses per year** 0.00
Burden 0 $0.00

















1. Assumes hours per occurrence is the same as that in the 1998 ICR.











2. Assumes these activities required with all new permittees











3. Assumes all new permits are major sources permits











4. Assumes that all new major source permittees also incorporate operating permit requirements at the same time











5. Assumes that testing, monitoring, recordkeeping and reporting are required only when an exploratory well is actually drilled
























**This number is used in the summary (Exhibit 14)












Sheet 11: Ex8 (AE)

EXHIBIT 8. NEW AND PREVIOUSLY PERMITTED ALTERNATIVE ENERGY SOURCES UNDER STATE/LOCAL AUTHORITY













STATE/LOCAL AGENCIES' ANNUAL BURDEN




























Collection Activities Number of Respondents Number of Occurrences for 3 years Occurrences per year Hours per Occurrence1 Cost per Occurrence Total Hours per Year Total Cost per Year






Labor Rate



$92.00








Consult with sources2 3 1 1.00 40 $3,680.00 40 $3,680.00






Review NOI to construct and minor source permit application3 0 1 0.00 265 $24,380.00 0 $0.00






Review NOI to construct and major source permit application3, 6 3 1 1.00 530 $48,760.00 530 $48,760.00






Review operating permit application4 3 1 1.00 80 $7,360.00 80 $7,360.00






Conduct inspections5 5 3 5.00 16 $1,472.00 80 $7,360.00






Review data reports5 5 3 5.00 8 $736.00 40 $3,680.00








Responses per year** 13.00
Burden 770 $70,840.00





















1. Assumes hours per occurrence is the same as that in the 1998 ICR for consultations, inspections and report reviews; hours for permit application reviews developed consistent with other exhibits






2. Assumes these activities required with all new permittees













3. Assumes all new permits are major source permits because all permitting at this time is for construction/operation.













4. Assumes that all new major source permittees also incorporate operating permit requirements at the same time













5. Assumes these activities required with all new and existing permittees













6. This step includes the time required for developing the draft permit, the statement of basis, and responding to comments received from a public notice.




























**This number is used in the summary (Exhibit 14)







































































































































































































































































































































































Sheet 12: Ex9 (Prod)

EXHIBIT 9. EXISTING DEVELOPMENT/PRODUCTION SOURCES UNDER STATE/LOCAL AUTHORITY















STATE/LOCAL AGENCIES' ANNUAL BURDEN
































Collection Activities Number of Respondents Number of Occurrences for 3 years Occurrences per year Hours per Occurrence1 Cost per Occurrence Total Hours per Year Total Cost per Year








Labor Rate



$92.00










Consult with sources 2 1 0.67 5 $460.00 3 $306.67








Oversee intial and annual compliance test 24 3 24.00 67 $6,164.00 1,608 $147,936.00








Conduct inspections 24 12 96.00 16 $1,472.00 1,536 $141,312.00








Review operating permit application2 14 1 4.80 40 $3,680.00 192 $17,664.00








Review data reports 24 3 24.00 8 $736.00 192 $17,664.00








Review NOI to construct and permit application3 2 1 0.67 131 $12,052.00 87 $8,034.67








Decomissioning4 3 1 1.00 76 $6,992.00 76 $6,992.00










Responses per year** 151.13
Burden 3,695 $339,909.33

























1. Assumes hours per occurrence is the same as that in the 1998 ICR.















2. Because these are 5-year permits, assumes that 60 percent of existing sources will renew their operating permits during the 3 years of the ICR period















3. Assumes 2 of the existing sources will undergo minor NSR preconstruction permitting for changes at their facilities.















4. Decommissioning is guestimated to result in 76 hrs of burden per occurrence which would involve consulting with sources (5 hrs), reviewing permit application (55 hrs) and conducting inspections (16 hrs).
































**This number is used in the summary (Exhibit 14)
















Sheet 13: Respondent Summary

Industry Under EPA Authority Summary (As calculated using old, incorrect, methodology)








Responses 165.59













Industry Labor Hours Per Year 8,697





Industry Labor Costs Per Year $878,350













Contractor Labor Hours Per Year 22,840





Contractor Labor Costs Per Year $2,466,684













Total Hours Per Year (including Contractor) 31,536





Total Labor Costs Per Year (including Contractor) $3,345,034













Total O&M Costs per Year $63,395





Total Capital Costs per Year $487,656













Total Non-Labor Costs Per Year ( no contractor) $551,051





















Total Costs Per Year $3,896,085.20











INDUSTRY BURDEN (Corrected)








Responses 165.59


2.2377027027027




Reporting Recordkeeping



Industry Labor Hours Per Year 8,697 6,809 1,888



Industry Labor Costs Per Year $878,350 $687,661.87 $190,688.00











Contractor Labor Costs $2,466,684













Total O&M Costs per Year $2,530,079





Total Capital Costs per Year $487,656













Total Non-Labor Costs Per Year $3,017,735













Total Costs Per Year $3,896,085



























STATE/LOCAL AGENCIES' ANNUAL BURDEN








Responses 164.13

23.447619047619




Reporting Recordkeeping



Labor Hours Per Year 4,465 4,465 0



Labor Costs Per Year $410,749.33





















Total O&M Costs per Year 0





Total Capital Costs per Year 0













Total Non-Labor Costs Per Year 0













Total Costs Per Year $410,749.33











Total Respondent









Correct Methodology Incorrect Methodology Change Due to correction in methodology



Responses 329.72 329.72 0.00











Labor Hours Per Year 13,161.20 36,000.87 -22,839.67



Labor Costs Per Year $1,289,099.20 $3,755,783.20 $(2,466,684.00)



















Total O&M Costs per Year $2,530,079.29 $63,395.29 $2,466,684.00



Total Capital Costs per Year $487,656.04 $487,656.04 $0.00











Total Non-Labor Costs Per Year $3,017,735.33 $551,051.33 $2,466,684.00











Total Costs Per Year $4,306,834.53 $4,306,834.53 $0.00


Sheet 14: Ex10 (Exp)

EXHIBIT 10. NEW AND PREVIOUSLY PERMITTED EXPLORATION SOURCES UNDER EPA AUTHORITY











EPA'S ANNUAL BURDEN
























Collection Activities Number of Respondents Number of Occurrences for 3 years Occurrences per year Hours per Occurrence1 Cost per Occurrence Total Hours per Year Total Cost per Year




Labor Rate



$62.00






Consult with sources2 1 1 0.33 5 $310.00 2 $103.33




Review NOI to construct and minor permit application3 0 1 0.00 131 $8,122.00 0 $0.00




Review NOI to construct and major permit application3 1 1 0.33 263 $16,306.00 88 $5,435.33




Review operating permit application4 1 1 0.33 40 $2,480.00 13 $826.67




Oversee initial compliance test5 1 1 0.33 67 $4,154.00 22 $1,384.67




Conduct inspections 1 2 0.67 16 $992.00 11 $661.33




Review data reports5 1 1 0.33 8 $496.00 3 $165.33









Burden 138 $8,576.67

















1. Assumes hours per occurrence is the same as that in the 1998 ICR











2. Assumes these activities required with all new permittees











3. Assumes all new permits are major sources permits











4. Assumes that all new major source permittees also incorporate operating permit requirements at the same time











5. Assumes that testing, monitoring, recordkeeping and reporting are required only when an exploratory well is actually drilled





















































































































































































Sheet 15: Ex11 (AE)

EXHIBIT 11. NEW AND PREVIOUSLY PERMITTED ALTERNATIVE ENERGY SOURCES UNDER EPA AUTHORITY











EPA'S ANNUAL BURDEN
























Collection Activities Number of Respondents Number of Occurrences for 3 years Occurrences per year Hours per Occurrence1 Cost per Occurrence Total Hours per Year Total Cost per Year




Labor Rate



$62.00






Consult with sources2 24 1 8.00 40 $2,480.00 320 $19,840.00




Review NOI to construct and minor source permit application3 0 1 0.00 265 $16,430.00 0 $0.00




Review NOI to construct and major source permit application3, 6 24 1 8.00 530 $32,860.00 4,240 $262,880.00




Review operating permit application4 28 1 9.33 80 $4,960.00 747 $46,293.33




Conduct inspections5 33 3 33.00 16 $992.00 528 $32,736.00




Review data reports5 33 3 33.00 8 $496.00 264 $16,368.00









Burden 6,099 $378,117.33

















1. Assumes hours per occurrence is the same as that in the 1998 ICR, except burden for review of a minor source revised to be consistent with other exhibits




2. Assumes these activities required with all new permittees











3. Assumes all new permits are major source permits because all permitting at this time is for construction/operation. Note this step includes drafting permits, fact sheets, public notice, hearing, and response to comments.











4. Assumes that all new major source permittees also incorporate operating permit requirements at the same time











5. Assumes these activities required with all new and existing permittees











6. This step includes the time required for developing the draft permit, the statement of basis, and responding to comments received from a public notice.







































































































Sheet 16: Ex12 (Prod)

EXHIBIT 12. NEW AND PREVIOUSLY PERMITTED DEVELOPMENT/PRODUCTION SOURCES UNDER EPA AUTHORITY
















EPA'S ANNUAL BURDEN


































Collection Activities Number of Respondents Number of Occurrences for 3 years Occurrences per year Hours per Occurrence* Costs per Occurrence Total Hours per Year Total Cost per Year









Labor Rate



$62.00











Consult with sources 1.0 1 0.33 5 $310.00 2 $103.33









Conduct inspections 1.0 12 4.00 16 $992.00 64 $3,968.00









Review NOI to construct and permit application 1.0 1 0.33 263 $16,306.00 88 $5,435.33









Oversee intial and annual compliance test 1.0 3 1.00 67 $4,154.00 67 $4,154.00









Review operating permit application 5.4 1 1.80 40 $2,480.00 72 $4,464.00









Review data reports 1.0 3 1.00 8 $496.00 8 $496.00









Decomissioning1 0.0 1 0.00 76 $4,712.00 0 $0.00














Burden 300 $18,620.67



























1. Decommissioning is guestimated to result in 59 hrs of burden per occurrence which would involve reviewing request for decommissioning (8hrs), reviewing permit application (35 hrs) and conducting inspections (16 hrs).


































* Assumes hours per occurrence is the same as that in the 1998 ICR.



































Sheet 17: Ex13

EXHIBIT 13. CONSISTENCY UPDATES AND OVERSEEING STATE/LOCAL ACTIVITIES








EPA'S ANNUAL BURDEN


















Collection Activities Number of Respondents Number of Occurrences for 3 years Occurrences per year Hours per Occurrence* Cost per Occurrence Total Hours per Year Total Cost per Year

Labor Rate



$62.00



Annual Consistency Reviews 14 3 14.00 40 2,480.00 560 $34,720.00

Major NOI/Regulatory Changes Review 2 1 0.67 150 9,300.00 100 $6,200.00

Minor NOI/Regulatory Changes Review 7 1 2.33 40 2,480.00 93 $5,786.67






Burden 753 $46,706.67











* Assumes hours per occurrence is the same as that in the 1998 ICR, except we have added concept of "minor" review








See supporting statement for explanation of Number of Respondents









Sheet 18: Ex14

EXHIBIT 14. OCS AIR REGULATIONS INFORMATION COLLECTION BURDEN



























SUMMARY OF ANNUAL BURDENS AND COSTS




























Current ICR

Previously Approved (EPA ICR ID# 1601.10) Updated to Correct Methodology

Change in Burden

Responses Respondent Hours Respondent Labor Costs O&M Costs Capital Costs Agency Hours Agency Costs Total Costs

Responses Respondent Hours Respondent Labor Costs O&M Costs Capital Costs Agency Hours Agency Costs Total Costs

Responses Respondent Hours Respondent Labor Costs O&M Costs Capital Costs Agency Hours Agency Costs Total Costs
New and Previously Permitted Exploration Sources under EPA Authority (Exhibit 1) 3.0 109 $11,043 $38,052 $0 n/a n/a $49,094.67 New and Previously Permitted Exploration Sources under EPA Authority (Exhibit 1) 3.3 220 $20,460 $129,880 $0 n/a n/a $150,340.00
New and Previously Permitted Exploration Sources under EPA Authority (Exhibit 1) -0.3 (111) ($9,417) ($91,828) $0 n/a n/a $(101,245.33)
New and Previously Permitted Alternative Energy Sources under EPA Authority (Exhibit 2) 82.3 2,968 $299,768 $287,712 $0 n/a n/a $587,480.00
New and Previously Permitted Alternative Energy Sources under EPA Authority (Exhibit 2) 12.0 356 $1,151,526 $29,886 $0 n/a n/a $1,181,412.00
New and Previously Permitted Alternative Energy Sources under EPA Authority (Exhibit 2) 70.3 2,612 -$851,758 $257,826 $0 n/a n/a $(593,932.00)
New and Previously Permitted Development / Production Sources under EPA Authority (Exhibit 3) 14.1 862 $87,089 $119,827 $325,104 n/a n/a $532,020.18
New and Previously Permitted Development / Production Sources under EPA Authority (Exhibit 3) 0.0 0 $0 $0 $0 n/a n/a $-
New and Previously Permitted Development / Production Sources under EPA Authority (Exhibit 3) 14.1 862 $87,089 $119,827 $325,104 n/a n/a $532,020.18
New and Previously Permitted Exploration Sources under State/Local Authority (Exhibit 4) 0.0 0 $0 $0 $0 n/a n/a $0.00
New and Previously Permitted Exploration Sources under State/Local Authority (Exhibit 4) 0.0 0 $0 $0 $0 n/a n/a $-
New and Previously Permitted Exploration Sources under State/Local Authority (Exhibit 4) 0.0 0 $0 $0 $0 n/a n/a $-
New and Previously Permitted Alternative Energy Sources under State/Local Authority (Exhibit 5) 11.0 392 $39,592 $44,092 $162,552 n/a n/a $246,235.60
New and Previously Permitted Alternative Energy Sources under State/Local Authority (Exhibit 5) 14.3 412 $38,316 $49,810 $0 n/a n/a $88,126.00
New and Previously Permitted Alternative Energy Sources under State/Local Authority (Exhibit 5) -3.3 (20) $1,276 -$5,718 $162,552 n/a n/a $158,109.60
Existing Development / Production Sources under State/Local Authority (Exhibit 6) 55.1 4,365 $440,858 $2,040,396 $0 n/a n/a $2,481,254.75
Existing Development / Production Sources under State/Local Authority (Exhibit 6) 34.3 2,639 $174,313 $1,210,340 $0 n/a n/a $1,384,653.42
Existing Development / Production Sources under State/Local Authority (Exhibit 6) 20.8 1,726 $266,545 $830,056 $0 n/a n/a $1,096,601.33
Subtotal of Industry Burden (rounded) 166 8,697 $878,350 $2,530,079 $487,656 n/a n/a $3,896,085
Subtotal of Industry Burden (rounded) 64 3,627 $1,384,615 $1,419,916 $0 n/a n/a $2,804,531.00
Subtotal of Industry Burden (rounded) 102 5,069 ($506,265) $1,110,163 $487,656 n/a n/a $1,091,554





























New and Previously Permitted Exploration Sources Under State/Local Authority (Exhibit 7) 0 0 $0 $0.00 $0.00 n/a n/a $0.00
New and Previously Permitted Exploration Sources Under State/Local Authority (Exhibit 7) 0.0 0 $0 $0.00 $0.00 n/a n/a $-
New and Previously Permitted Exploration Sources Under State/Local Authority (Exhibit 7) 0.0 0 $0 $0.00 $0.00 n/a n/a $-
New and Previously Permitted Alternative Energy Sources under State/Local Authority (Exhibit 8) 13 770 $70,840 $0.00 $0.00 n/a n/a $70,840.00
New and Previously Permitted Alternative Energy Sources under State/Local Authority (Exhibit 8) 17.0 657 $43,384 $0.00 $0.00 n/a n/a $43,384.00
New and Previously Permitted Alternative Energy Sources under State/Local Authority (Exhibit 8) 13.0 770 $70,840 $0.00 $0.00 n/a n/a $27,456.00
Existing Development/ Production Sources under State/Local Authority (Exhibit 9) 151 3,695 $339,909 $0.00 $0.00 n/a n/a $339,909.33
Existing Development/ Production Sources under State/Local Authority (Exhibit 9) 93.7 2,228 $147,070 $0.00 $0.00 n/a n/a $147,070.00
Existing Development/ Production Sources under State/Local Authority (Exhibit 9) 151.1 3,695 $0 $0.00 $0.00 n/a n/a $192,839.33
Subtotal of State/Local Burden (rounded) 164 4,465 $410,749 $0 $0 n/a n/a $410,749
Subtotal of State/Local Burden (rounded) 111 2,886 $190,454.00 $0.00 $0.00 n/a n/a $190,454.00
Subtotal of State/Local Burden (rounded) 164 4,465 $70,840 $0 $0 n/a n/a $220,295.00





























New and Previously Permitted Exploration Sources under EPA Authority (Exhibit 10) n/a n/a n/a n/a n/a 138 $8,577

New and Previously Permitted Exploration Sources under EPA Authority (Exhibit 10) n/a n/a n/a n/a n/a 125 $7,000

New and Previously Permitted Exploration Sources under EPA Authority (Exhibit 10) n/a n/a n/a n/a n/a 13 1,577
New and Previously Permitted Alternative Energy Sources under EPA Authority (Exhibit 11) n/a n/a n/a n/a n/a 6,099 $378,117

New and Previously Permitted Alternative Energy Sources under EPA Authority (Exhibit 11) n/a n/a n/a n/a n/a 364 $29,344

New and Previously Permitted Alternative Energy Sources under EPA Authority (Exhibit 11) n/a n/a n/a n/a n/a 5,735 348,773
New and Previoulsy Permitted Development/ Production Sources under EPA Authority (Exhibit 12) n/a n/a n/a n/a n/a 300 $18,621

New and Previoulsy Permitted Development/ Production Sources under EPA Authority (Exhibit 12) n/a n/a n/a n/a n/a 0 $0

New and Previoulsy Permitted Development/ Production Sources under EPA Authority (Exhibit 12) n/a n/a n/a n/a n/a 300 18,621
Consistency Updates (Exhibit 13)




753 $46,707
Consistency Updates (Exhibit 13)




0 $0

Consistency Updates (Exhibit 13)




0 $0
Subtotal of EPA Burden n/a n/a n/a n/a n/a 7,291 $452,021

Subtotal of EPA Burden n/a n/a n/a n/a n/a 489 $36,344

Subtotal of EPA Burden n/a n/a n/a n/a n/a 6,048 $368,971
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy